FHWA NBI 2024 Inspection record Public-domain dataset

CNIC RR(CC&P)

Carrying CNIC RR(CC&P) over MCLEAN BLVD

0.25 Mi N. of IL 31, Kane, Illinois

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Unknown

Bridge Snapshot: CNIC RR(CC&P)

The CNIC RR(CC&P) bridge in Kane, Illinois carries CNIC RR(CC&P) over MCLEAN BLVD. It was built in 2009, making it 17 years old today. The structure is built primarily of other. Daily traffic averages 7,800 vehicles, placing it in the moderately-trafficked tier of Illinois bridges.

The latest FHWA inspection records show limited component ratings on file. The weakest component sits in unrated condition. No reported major component scores in the Poor range under the current federal condition thresholds.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How CNIC RR(CC&P) compares

354
Bridges in Kane · 18 in Poor condition

Live comparison across Illinois.

Condition Ratings

Overall Condition
Unrated

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
2009
Material
Other
Avg Daily Traffic
7,800 vehicles/day
Structure Number
045316300000000

How to read this record

This page shows what the last federal inspection recorded, not whether CNIC RR(CC&P) is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare CNIC RR(CC&P) against other structures in Kane and across Illinois. Illinois bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for CNIC RR(CC&P)?

CNIC RR(CC&P) in Kane, Illinois on the FHWA's 0–9 scale.

How often is CNIC RR(CC&P) inspected?

CNIC RR(CC&P)'s responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 7,800 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. CNIC RR(CC&P) is currently shown as unrated condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for CNIC RR(CC&P)?

An inventory load rating is not recorded for CNIC RR(CC&P).

Who is responsible for maintaining CNIC RR(CC&P)?

Ownership is not specified for CNIC RR(CC&P) in the NBI.

How old is CNIC RR(CC&P) and does age affect safety?

CNIC RR(CC&P) was built in 2009, making it 17 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.