County profile · official public datasets

Alameda County, CA

658 public highway bridges tracked in the FHWA National Bridge Inventory: 35.3% rated Good, 55.2% Fair, 9.6% Poor.

658
Public bridges
35.3%
Good condition
9.6%
Poor condition

The verdict

According to the Federal Highway Administration's 2024 National Bridge Inventory.

Alameda County posts a higher-than-median Poor-condition share among rated counties in the state across large county bridge inventory.

43rd
of 58 on Poor share
9.6%
Poor-condition share
658
public highway bridges
1973
avg year built

Poor is an FHWA condition category from the lowest applicable component rating (4 or below), not a live crossing-safety or closure decision. Rankings cover counties with at least five public highway bridges.

Alameda County Bridge Snapshot

According to the Federal Highway Administration's 2024 National Bridge Inventory, Alameda County ranks #43 of 58 California counties with at least 5 public highway bridges on Poor-condition share (lower share ranks better; currently 9.6%). Alameda County, California contains 658 public highway bridges. Roughly 35.3% are rated “Good,” 55.2% “Fair,” and 9.6% “Poor.” Poor means the lowest applicable deck, superstructure, substructure, or culvert rating is 4 or below on the 0–9 NBI scale. It is a condition category, not a live safety or closure decision.

Responsible agencies inspect covered bridges on risk-based intervals under current NBIS rules and submit inventory data to FHWA annually. The list below shows every NBI-tracked bridge in the county. Use the “Sort by” controls to change the ordering, and click any row for its reported inspection date, traffic count, and condition fields.

Source: FHWA National Bridge Inventory. See methodology for full definitions.

Total bridges

658

Public highway bridges in Alameda County

Good condition

35.3%

232 of 658 rated 7-9

Fair condition

55.2%

363 of 658 rated 5-6

Poor condition

9.6%

63 of 658 rated 4 or below

In-state Poor-share rank

#43 of 58

Among California counties with 5+ bridges, lower share ranks better

Condition distribution

Share of 658 NBI-tracked bridges by lowest applicable component rating.

Good
35.3% (232)
Fair
55.2% (363)
Poor
9.6% (63)

Alameda County's Poor-condition bridges carry 3,141,396 vehicle crossings a day

That is 8.5% of the county's reported daily bridge traffic on 9.6% of its bridges: Poor-condition structures carry less traffic than their share of the inventory. Each Poor bridge averages 49,863 crossings a day against 61,900 for a Good-condition one. A Poor rating is a condition category, not a closure or a live safety judgement; it means the lowest applicable component rating is 4 or below.

Computed over the 658 of 658 bridges in this county that report an average daily traffic count. Source: FHWA National Bridge Inventory, 2024 release.

61.9% of Alameda County's bridges have passed the 50-year mark

407 of the 658 bridges with a recorded construction year were built in 1974 or earlier. Age alone is not a defect: a well-maintained older bridge can rate Good, and 35.3% of this county's inventory does. Even so, this older cohort is the population from which future Poor ratings are drawn, which is why the age profile below matters alongside the condition split above.

Cutoff derives from the 2024 release year minus a 50-year design life. Source: FHWA National Bridge Inventory, 2024 release.

One structure carries 7.2% of the county's Poor-condition bridge traffic

INTERSTATE 880 over CRANDALL CREEK, built 1958, carries 225,000 vehicles a day, the most of any Poor-rated structure here. The county's Poor-condition exposure is concentrated rather than evenly spread, so the 63-bridge count understates how much of the daily burden sits on a single crossing.

Share is of the 3,141,396 daily crossings on Poor-rated bridges that report a traffic count. Source: FHWA National Bridge Inventory, 2024 release.

When Alameda County's bridges were built

658 bridges with a recorded construction year, grouped by decade

bridges

What this shows Construction peaked in the 1960s, when 183 of the county's bridges still in the inventory were built, which is 27.8% of those with a recorded year. That cohort is now 55 to 64 years old in the 2024 inventory. Its average build year (1973) matches the California average (1970).

Source FHWA National Bridge Inventory (year built) As of 2024 NBI release

How Alameda County compares with California's closest counties by inventory size

The 5 California counties nearest Alameda County in number of bridges, with their condition splits. Its 9.6% Poor share is the 5th-lowest of these 6. Its average build year of 1973 against a peer-group mean of 1969 is in line with the group.

Showing the 5 closest of 57 California counties eligible for comparison.

Bridge inventory size and condition shares for Alameda County and the 5 California counties closest to it in inventory size
County Bridges Poor
Kern County 668 6.6%
Alameda County (this page) 658 9.6%
San Joaquin County 644 9.2%
Contra Costa County 618 10.5%
Sonoma County 609 6.9%
Tulare County 589 3.4%

Each share is of that county's own total tracked bridges; peers are the counties with 5 or more bridges whose inventory size is closest to Alameda County's. Source: FHWA National Bridge Inventory, 2024 release.

Nationwide counties with similar inventory size or average build year

Two NBI-derived peer sets for Alameda County, both outside California so the neighborhoods are not the same-state size table above.

Similar inventory size

Nearest county inventories outside CA (658 bridges here).

Similar average build year

Nearest mean year-built outside CA (1973 here).

Source: FHWA National Bridge Inventory, 2024 release. Peers floor at 10 bridges so stub inventories cannot own the match.

Fair-condition bridges (363)

INTERSTATE 580 EB

Fair

Over: UP RR BNSF RY & ACE

04-ALA-580-R8.00, Alameda, CA

Built 1969 Load: 35.6 t ADT: 88,000

INTERSTATE 680

Fair

Over: UP RR & FLOOD CNTRL CHNN

04-ALA-680-R15.89-PLE, Alameda, CA

Built 1967 Load: 35.6 t ADT: 122,000

INTERSTATE 580

Fair

Over: FRUITVALE AVE

04-ALA-580-R41.43-OAK, Alameda, CA

Built 1963 Load: 36.3 t ADT: 169,000

JOHNSON DRIVE

Fair

Over: G1 ZONE 7 CHANNEL

500 FT S OF STONERIDGE DR, Alameda, CA

Built 2003 Load: 36.3 t ADT: 500

INTERSTATE 205

Fair

Over: CALIFORNIA AQUEDUCT

04-ALA-205-0.28, Alameda, CA

Built 1966 Load: 36.6 t ADT: 122,000

GROVE WAY

Fair

Over: SAN LORENZO CREEK

0.02 MI NE OF MISSION BL, Alameda, CA

Built 1915 Load: 36.6 t ADT: 3,500

INTERSTATE 680

Fair

Over: SR 238 (MISSION BLVD)

04-ALA-680-R6.38-FMT, Alameda, CA

Built 1963 Load: 36.9 t ADT: 140,000

150TH AVE

Fair

Over: INTERSTATE 580

04-ALA-580-R32.84, Alameda, CA

Built 1965 Load: 36.9 t ADT: 14,000

INTERSTATE 580

Fair

Over: 106TH AVE

04-ALA-580-R35.71-OAK, Alameda, CA

Built 1965 Load: 36.9 t ADT: 140,000

SERVICE ACCESS RD

Fair

Over: STATE ROUTE 24 WB

04-ALA-024-R5.85-OAK, Alameda, CA

Built 1964 Load: 36.9 t ADT: 25

INTERSTATE 580

Fair

Over: FTHLL BLVD UC (OFF-RAMP)

04-ALA-580-R35.10-OAK, Alameda, CA

Built 1964 Load: 37.3 t ADT: 10,855

INTERSTATE 580

Fair

Over: 164TH AVENUE

04-ALA-580-R31.71, Alameda, CA

Built 1965 Load: 37.3 t ADT: 4,800

BENEDICT DRIVE

Fair

Over: SAN LEANDRO CREEK

N/O LAKE CHABOT RD, Alameda, CA

Built 1964 Load: 37.3 t ADT: 4,110

BAY ST

Fair

Over: STATE ROUTE 13

04-ALA-013-13.71-BER, Alameda, CA

Built 1954 Load: 37.9 t ADT: 5,000

INTERSTATE 580

Fair

Over: 164TH AVENUE

04-ALA-580-R31.71, Alameda, CA

Built 1965 Load: 38.2 t ADT: 79,000

INTERSTATE 580

Fair

Over: PARK BLVD

04-ALA-580-42.67-OAK, Alameda, CA

Built 1962 Load: 38.9 t ADT: 95,000

FOOTHILL ROAD

Fair

Over: SINBAD CREEK

AT KILKARE RD, Alameda, CA

Built 1948 Load: 38.9 t ADT: 1,000

FALLON ROAD

Fair

Over: KOBOLD CREEK

0.3 MI SE OF TASSAJARA RD, Alameda, CA

Built 2010 Load: 38.9 t ADT: 4,000

OAK KNOLL BLVD

Fair

Over: INTERSTATE 580

04-ALA-580-R36.76-OAK, Alameda, CA

Built 1965 Load: 39.2 t ADT: 3,800

INTERSTATE 580

Fair

Over: GOLF LINKS ROAD

04-ALA-580-R36.34-OAK, Alameda, CA

Built 1965 Load: 39.2 t ADT: 151,000

SANTA RITA RD

Fair

Over: ARROYO MOCHO

0.4 MI S/O TASSAJARA RD, Alameda, CA

Built 1974 Load: 39.2 t ADT: 3,900

ROUTE 580

Fair

Over: WEST STREET

04-ALA-580-45.39-OAK, Alameda, CA

Built 1961 Load: 39.5 t ADT: 198,000

MACARTHUR BLVD NB

Fair

Over: E580-MACARTHUR BL OFF-RP

04-ALA-580-42.80-OAK, Alameda, CA

Built 1962 Load: 39.5 t ADT: 8,930

N LIVERMORE AVE

Fair

Over: ARROYO LAS POSITAS

375 FT SOUTH OF I-580, Alameda, CA

Built 1972 Load: 39.9 t ADT: 25,000

W80-S13 CONNECTOR

Fair

Over: INTERSTATE 80

04-ALA-080-4.45-EMV, Alameda, CA

Built 1954 Load: 40.2 t ADT: 7,600

S13-E580 CONNECTOR

Fair

Over: I 580 & CALAVERAS AVE

04-ALA-013-4.27-OAK, Alameda, CA

Built 1965 Load: 40.2 t ADT: 47,000

INTERSTATE 580 EB

Fair

Over: SCHAEFER RANCH ROAD

04-ALA-580-R23.86, Alameda, CA

Built 1976 Load: 40.8 t ADT: 103,500

E&W580-W980 CNNCTR

Fair

Over: I580 980 BARTD CONNS STS

04-ALA-580-45.14-OAK, Alameda, CA

Built 1970 Load: 40.8 t ADT: 16,000

STATE ROUTE 84

Fair

Over: ALAMEDA CR UPRR BNSF ACE

04-ALA-084-14.32, Alameda, CA

Built 1947 Load: 41.1 t ADT: 13,500

GRAND AVENUE

Fair

Over: INTERSTATE 580

04-ALA-580-R33.94-SLN, Alameda, CA

Built 1964 Load: 41.1 t ADT: 13,300

159TH AVE

Fair

Over: INTERSTATE 580

04-ALA-580-R32.32, Alameda, CA

Built 1965 Load: 41.8 t ADT: 4,375

CHARLOTTE WAY

Fair

Over: ARROYO SECO

0.3 MI N OF EAST AVE, Alameda, CA

Built 1968 Load: 41.8 t ADT: 3,450

W PORTAL BLDG BRDG

Fair

Over: STATE ROUTE 24 WB

04-ALA-024-R5.89-OAK, Alameda, CA

Built 1964 Load: 42.1 t ADT: 25

INTERSTATE 580

Fair

Over: ST RTE 24-I 980

04-ALA-580-45.15-OAK, Alameda, CA

Built 1961 Load: 42.8 t ADT: 201,000

MOUNTAIN-580 ON RP

Fair

Over: SR 13 NB MOUNTAIN BL

04-ALA-580-R39.15-OAK, Alameda, CA

Built 1965 Load: 42.8 t ADT: 9,137

PALM AVE

Fair

Over: INTERSTATE 680

04-ALA-680-M5.91-FMT, Alameda, CA

Built 1971 Load: 43.7 t ADT: 3,388

E&W580-E24 CONNCTR

Fair

Over: I580 SR24 BARTD CONN ST

04-ALA-580-45.23-OAK, Alameda, CA

Built 1970 Load: 44.1 t ADT: 40,000

HESPERIAN BLVD

Fair

Over: STATE ROUTE 92 & RAMPS

04-ALA-092-R5.76-HAY, Alameda, CA

Built 1975 Load: 44.1 t ADT: 36,700

ROUTE 580 WB

Fair

Over: ADELINE SAN PABLO PERAL

04-ALA-580-45.74-OAK, Alameda, CA

Built 1961 Load: 44.4 t ADT: 99,000

MACARTHUR BLVD

Fair

Over: INTERSTATE 580

04-ALA-580-44.32-OAK, Alameda, CA

Built 1961 Load: 44.4 t ADT: 17,300

INTERSTATE 580

Fair

Over: ARROYO LAS POSITAS

04-ALA-580-11.72, Alameda, CA

Built 1972 Load: 44.7 t ADT: 197,000

INTERSTATE 580

Fair

Over: W580-SAN JOAQUIN AV OFF

04-ALA-580-R34.40-SLN, Alameda, CA

Built 1964 Load: 44.7 t ADT: 137,000

HOPYARD ROAD SB

Fair

Over: ARROYO MOCHO

1.5 MI S/O SR 580, Alameda, CA

Built 1967 Load: 45.7 t ADT: 37,800

N580-BRUCE ST OFF

Fair

Over: 14TH AVENUE (OFF-RAMP)

04-ALA-580-R42.07-OAK, Alameda, CA

Built 1963 Load: 46.7 t ADT: 10,800

W24-TELEGRAPH OFF

Fair

Over: CLAREMONT AVE

04-ALA-024-R3.38-OAK, Alameda, CA

Built 1970 Load: 47.6 t ADT: 5,609

STATE ROUTE 24 EB

Fair

Over: E24-ML KING JR OFF RAMP

04-ALA-024-R2.59-OAK, Alameda, CA

Built 1970 Load: 49.2 t ADT: 75,500

CALAVERAS RD

Fair

Over: ALAMEDA CREEK

5.2 MI NW/O COUNTY LINE, Alameda, CA

Built 1964 Load: 50.5 t ADT: 1,200

LAKE PARK AVE

Fair

Over: INTERSTATE 580

04-ALA-580-43.23-OAK, Alameda, CA

Built 1962 Load: 51.2 t ADT: 3,560

STATE ROUTE 238

Fair

Over: ASHLAND AVE

04-ALA-238-15.67, Alameda, CA

Built 1956 Load: 52.1 t ADT: 121,000

STARBOARD DRIVE

Fair

Over: FLOOD CONTROL CH. LINE E

0.2MI NW OF FREMONT BLVD, Alameda, CA

Built 1987 Load: 53.5 t ADT: 300
Data sourced from official public datasets. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.