Costilla County, CO

39 public highway bridges

Costilla County Bridge Snapshot

According to the Federal Highway Administration's 2024 National Bridge Inventory, Costilla County, Colorado contains 39 public highway bridges. Roughly 15.4% are rated “Good,” 84.6% “Fair,” and 0% “Poor.” Poor means the lowest applicable deck, superstructure, substructure, or culvert rating is 4 or below on the 0–9 NBI scale. It is a condition category, not a live safety or closure decision.

Responsible agencies inspect covered bridges on risk-based intervals under current NBIS rules and submit inventory data to FHWA annually. The list below shows every NBI-tracked bridge in the county. Use the “Sort by” controls to change the ordering, and click any row for its reported inspection date, traffic count, and condition fields.

Source: FHWA National Bridge Inventory. See methodology for full definitions.

39
Total Bridges
15.4%
Good
84.6%
Fair
0%
Poor Condition

Condition Distribution

Good
15.4% (6)
Fair
84.6% (33)
Poor
0% (0)

All Bridges (39)

SH 159 ML

Fair

Over: CULEBRA CREEK

S. EDGE OF SAN LUIS, Costilla, CO

Built 1936 Load: 19.1 t ADT: 800

COUNTY ROAD 22.3

Fair

Over: CULEBRA CREEK

BETWEEN CR L.7 AND M.5, Costilla, CO

Built 1984 Load: 20.2 t ADT: 21

THORFINNSON ROAD

Fair

Over: EL POSO CREEK

.1 MI S of Malcom Rd, Costilla, CO

Built 2012 Load: 23.6 t ADT: 4

COUNTY ROAD 21

Fair

Over: JAROSA CREEK

1 MI S OF CR E.5, Costilla, CO

Built 2005 Load: 24.6 t ADT: 58

COUNTY ROAD B

Fair

Over: RIO COSTILLA

JUST E of CR 13, Costilla, CO

Built 1985 Load: 25.6 t ADT: 81

COUNTY ROAD Z7

Fair

Over: TRINCHERA CREEK

3.0 MI SE OF SH 160, Costilla, CO

Built 1988 Load: 27.5 t ADT: 124

COUNTY ROAD FF

Fair

Over: SANGRE DE CRISTO CK

.6 MI W OF SH 159, Costilla, CO

Built 1965 Load: 31.1 t ADT: 17

COUNTY ROAD 21

Fair

Over: CULEBRA CREEK

Just SE OF CR L.7, Costilla, CO

Built 1955 Load: 32.7 t ADT: 475

COUNTY ROAD L.7

Fair

Over: CULEBRA CREEK

.2 MI E OF CR 25.5, Costilla, CO

Built 2004 Load: 33.8 t ADT: 67

COUNTY ROAD Z

Fair

Over: RIO GRANDE RIVER

11.5 MI NW OF SAN ACACIO, Costilla, CO

Built 1987 Load: 35.6 t ADT: 80

COUNTY ROAD 22.4

Fair

Over: CULEBRA CREEK

BETWEEN CRL.7 AND M.5, Costilla, CO

Built 1990 Load: 36.3 t ADT: 19

COUNTY ROAD 16

Fair

Over: EASTDALE CANAL

1 MI S OF CR SH 142, Costilla, CO

Built 1987 Load: 37.4 t ADT: 4

COUNTY ROAD 23.5

Fair

Over: CULEBRA CREEK

JUST N OF CR M.5, Costilla, CO

Built 1988 Load: 38.5 t ADT: 7

COUNTY ROAD K.5

Fair

Over: SANCHEZ CANAL

1.3 MI SE OF SAN PEDRO, Costilla, CO

Built 1993 Load: 38.5 t ADT: 62

COUNTY ROAD E.5

Fair

Over: SANCHEZ CANAL

.3 MI SE OF CR 22.3, Costilla, CO

Built 1999 Load: 38.9 t ADT: 58

COUNTY ROAD 21

Fair

Over: SANCHEZ CANAL

JUST N OF CR H.2, Costilla, CO

Built 1994 Load: 39.2 t ADT: 83

COUNTY ROAD M.5

Fair

Over: SANCHEZ CANAL

2.0 MI NE OF CHAMA, Costilla, CO

Built 1988 Load: 39.4 t ADT: 14

COUNTY ROAD P

Fair

Over: CULEBRA EASTDALE CANAL

1 MI W OF SH 159, Costilla, CO

Built 1992 Load: 39.4 t ADT: 374

8TH AVENUE

Fair

Over: UTE CREEK

IN FORT GARLAND, Costilla, CO

Built 2004 Load: 40.5 t ADT: 10

COUNTY ROAD D.2

Fair

Over: RIO COSTILLA

JUST E OF CR 12.8, Costilla, CO

Built 1993 Load: 40.5 t ADT: 5

RAILROAD ST.

Fair

Over: GARLAND DITCH

IN BLANCA, Costilla, CO

Built 1992 Load: 41.3 t ADT: 26

COUNTY ROAD 19

Fair

Over: CULEBRA CREEK

0.5 MI SW OF CR 21, Costilla, CO

Built 1988 Load: 42.0 t ADT: 88

COUNTY ROAD H

Fair

Over: CULEBRA EASTDALE CANAL

1 MI W OF SH 159, Costilla, CO

Built 1994 Load: 42.2 t ADT: 73

COUNTY ROAD L.7

Fair

Over: EL POSO CREEK

JUST W OF CR 25.5, Costilla, CO

Built 1997 Load: 42.7 t ADT: 78

C.RD TRINCHERA

Fair

Over: SANGRE DE CRISTO CREEK

2.1 MI E OF FORT GARLAND, Costilla, CO

Built 1989 Load: 42.8 t ADT: 531

COUNTY ROAD 10

Fair

Over: EASTDALE NO.1 CANAL

2.3 MI S OF CR H, Costilla, CO

Built 2002 Load: 42.9 t ADT: 27

COUNTY ROAD FF

Fair

Over: SANGRE DE CRISTO CK

4.4 MI W OF SH 159, Costilla, CO

Built 2013 Load: 44.7 t ADT: 16

COUNTY ROAD GG.5

Fair

Over: GARLAND DITCH

0.7 MI WSW OF FT. GARLAND, Costilla, CO

Built 1997 Load: 45.9 t ADT: 41

COUNTY ROAD EE

Fair

Over: SANGRE DE CRISTO CREEK

.2 MI S OF SH 160, Costilla, CO

Built 1991 Load: 47.1 t ADT: 138

COUNTY ROAD J.2

Fair

Over: SANCHEZ CANAL

1 MI SE OF CR 21, Costilla, CO

Built 1988 Load: 47.2 t ADT: 217

COUNTY ROAD E.5

Fair

Over: SAN FRANCISCO CREEK

200 FT S OF CR J.2, Costilla, CO

Built 1996 Load: 47.4 t ADT: 55

ARCHIE STREET

Fair

Over: RITO SECO

IN TOWN OF SAN LUIS, Costilla, CO

Built 1990 Load: 51.2 t ADT: 225

6TH STREET

Fair

Over: RITO SECO

50 FT E OF SH 159, Costilla, CO

Built 1990 Load: 59.6 t ADT: 257

COUNTY ROAD 15

Good

Over: CULEBRA EASTDALE CANAL

JUST N OF CR P.7 AND 14.6, Costilla, CO

Built 1990 Load: 32.7 t ADT: 41

COUNTY ROAD P.6

Good

Over: UNNAMED DRAINAGE

0.4 MI E OF SAN LUIS, Costilla, CO

Built 2006 Load: 32.8 t ADT: 1,230

COUNTY ROAD M.5

Good

Over: CULEBRA CREEK

.2 MI SE OF CR L.7, Costilla, CO

Built 1992 Load: 33.4 t ADT: 84

COUNTY ROAD 18

Good

Over: SANGRE DE CRISTO CREEK

.6 MI W OF SH 159, Costilla, CO

Built 1992 Load: 42.6 t ADT: 37

US 160 ML

Good

Over: CANAL

@ BLANCA, 21 MI E OF ALAM, Costilla, CO

Built 1970 Load: 99.9 t ADT: 5,000

SH 142 ML

Good

Over: RITO SECO CREEK

IN SAN LUIS, Costilla, CO

Built 1936 Load: 99.9 t ADT: 440
Data sourced from official public datasets. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.