Douglas County, CO

263 public highway bridges

Douglas County Bridge Snapshot

According to the Federal Highway Administration's 2024 National Bridge Inventory, Douglas County, Colorado contains 263 public highway bridges. Roughly 48.3% are rated “Good,” 34.6% “Fair,” and 1.5% “Poor.” Poor means the lowest applicable deck, superstructure, substructure, or culvert rating is 4 or below on the 0–9 NBI scale. It is a condition category, not a live safety or closure decision.

Responsible agencies inspect covered bridges on risk-based intervals under current NBIS rules and submit inventory data to FHWA annually. The list below shows every NBI-tracked bridge in the county. Use the “Sort by” controls to change the ordering, and click any row for its reported inspection date, traffic count, and condition fields.

Source: FHWA National Bridge Inventory. See methodology for full definitions.

263
Total Bridges
48.3%
Good
34.6%
Fair
1.5%
Poor Condition

Condition Distribution

Good
48.3% (127)
Fair
34.6% (91)
Poor
1.5% (4)

All Bridges (263)

HAYSTACK ROAD

Good

Over: SELLARS GULCH

0.2 MI W OF LAKE GULCH RD, Douglas, CO

Built 2013 Load: 29.6 t ADT: 273

WESTBRIDGE DRIVE

Good

Over: LOCAL DRAINAGE

0.15 MI E of CANYONSIDE, Douglas, CO

Built 2019 Load: 30.1 t ADT: 2,104

SH 470 ML EBND

Good

Over: BIG DRY CREEK

1.96 MI E OF JCT SH 177, Douglas, CO

Built 1984 Load: 30.9 t ADT: 49,000

SH 470 ML WBND

Good

Over: BIG DRY CREEK

3.2 M W OF JCT I25, Douglas, CO

Built 1984 Load: 30.9 t ADT: 49,000

SH 470 ML EBND

Good

Over: BROADWAY

2.5 MI E OF JCT US 85, Douglas, CO

Built 1984 Load: 31.4 t ADT: 41,000

WATERTON ROAD

Good

Over: INDIAN CREEK

JUST W OF LOUVIERS BLVD, Douglas, CO

Built 2020 Load: 31.8 t ADT: 474

WATERTON ROAD

Good

Over: LOCAL DRAINAGE

1.2 MI W OF US 85, Douglas, CO

Built 2020 Load: 31.8 t ADT: 474

SH 470 ML WBND

Good

Over: S. ERICKSON BLVD.

.3 MI E. OF JCT SH 85, Douglas, CO

Built 1984 Load: 31.8 t ADT: 40,500

Castle Rock Pkwy

Good

Over: US 85 and UPRR

N Meadows Pkwy, Douglas, CO

Built 2014 Load: 32.4 t ADT: 14,973

E-470 NB

Good

Over: Cherry Creek

5.13 MI FROM I25, Douglas, CO

Built 1996 Load: 32.4 t ADT: 24,407

US 85 TO C470 RAMP

Good

Over: ERICKSON BLVD.

LITTLETON, Douglas, CO

Built 2012 Load: 32.4 t ADT: 81,000

US 85 ML

Good

Over: SAND CREEK

2.9 MI. N. OF JCT S.H. 67, Douglas, CO

Built 2022 Load: 32.4 t ADT: 16,600

EB COTTONWOOD DR

Good

Over: CHERRY CREEK

0.5 MI E OF PARKER RD, Douglas, CO

Built 2021 Load: 32.4 t ADT: 16,005

CASTLE OAK DRIVE

Good

Over: MCMURDO GULCH

0.1 MI S OF JUNIPER PLACE, Douglas, CO

Built 2022 Load: 32.7 t ADT: 3,289

PLUM CREEK PARKWAY

Good

Over: WILDLIFE CROSSING

0.6 MI E OF LAKE GULCH RD, Douglas, CO

Built 2009 Load: 32.7 t ADT: 5,195

TIMBER MILL PKWY

Good

Over: EAST PLUM CREEK

0.6 MI SE OF US 85, Douglas, CO

Built 2022 Load: 32.7 t

N MEADOWS PARKWAY

Good

Over: EAST PLUM CREEK

0.1 MI S OF US 85, Douglas, CO

Built 2015 Load: 32.7 t ADT: 13,877

WATERTON ROAD

Good

Over: HIGHLINE CANAL

0.5 MI FROM WATERTON CANY, Douglas, CO

Built 2009 Load: 32.7 t ADT: 13,977

RAMPART RANGE ROAD

Good

Over: HIGHLINE CANAL

0.1 MI S OF TITAN ROAD, Douglas, CO

Built 2007 Load: 32.7 t ADT: 12,559

Chambers Road SB

Good

Over: E-470

3.54 MI FROM I 25, Douglas, CO

Built 2004 Load: 32.7 t ADT: 2,000

SH 470 ML WBND

Good

Over: BROADWAY

1.5 MI W OF JCT SH 177, Douglas, CO

Built 1985 Load: 32.7 t ADT: 41,000

HESS ROAD WB

Good

Over: CHERRY CREEK

0.5 MI W OF PARKER RD, Douglas, CO

Built 2008 Load: 32.7 t ADT: 10,120

HESS ROAD EB

Good

Over: CHERRY CREEK

.5 MI W. OF PARKER RD., Douglas, CO

Built 2014 Load: 32.7 t ADT: 11,038

PINE LANE

Good

Over: CHERRY CREEK

0.4 MI W OF PARKER RD, Douglas, CO

Built 2008 Load: 32.7 t ADT: 17,155

RUSSELLVILLE ROAD

Good

Over: EAST CHERRY CREEK

1.6 MI NE OF HIGHWAY 83, Douglas, CO

Built 1996 Load: 32.8 t ADT: 1,291

CASTLE OAK DRIVE

Good

Over: CHERRY CREEK

0.4 MI W OF HIGHWAY 83, Douglas, CO

Built 2006 Load: 33.0 t ADT: 3,995

WATERTON ROAD

Good

Over: LOUVIERS GULCH

0.9 MI W OF LOUVIERS BLVD, Douglas, CO

Built 2020 Load: 33.4 t ADT: 476

LINCOLN AVENUE EB

Good

Over: CHERRY CREEK

1.0 MI W OF HIGHWAY 83, Douglas, CO

Built 1998 Load: 33.9 t ADT: 14,840

US 85 SB OFF RAMP

Good

Over: TERRAIN

SBND OFF RAMP D, Douglas, CO

Built 2014 Load: 34.0 t ADT: 2,540

SH 470 ML WBND

Good

Over: ACRES GREEN DRIVE

1.3 M W OF JCT I 25, Douglas, CO

Built 1984 Load: 34.0 t ADT: 47,500

CHAMBERS RD SB

Good

Over: NEWLIN GULCH

.4 M NW NEWLIN GULCH BLVD, Douglas, CO

Built 2009 Load: 34.5 t ADT: 13,454

COUNTRY CLUB DR.

Good

Over: BEAR CREEK

JUST N OF PERRY PARK BLVD, Douglas, CO

Built 2004 Load: 34.6 t ADT: 214

WB MAINSTREET

Good

Over: CHERRY CREEK

1.0 MI W OF HWY 83, Douglas, CO

Built 1987 Load: 34.8 t ADT: 12,244

US 85 SB ON RAMP

Good

Over: TERRAIN

SBND ON RAMP C, Douglas, CO

Built 2014 Load: 35.6 t ADT: 1,862

N MEADOWS PARKWAY

Good

Over: RAILROAD TRACK

0.5 MI S OF US 85, Douglas, CO

Built 2015 Load: 35.6 t ADT: 14,853

SPRUCE MTN ROAD

Good

Over: E. PLUM CREEK

0.7 MI S OF LARKSPUR, Douglas, CO

Built 2008 Load: 35.6 t ADT: 1,993

LAMBERT RNCH TRAIL

Good

Over: INDIAN CREEK

0.1 MI W OF INTERSECTION, Douglas, CO

Built 2001 Load: 35.6 t ADT: 57

SH 470 ML EBND

Good

Over: SOUTH PLATTE RIVER

0.4 MI W OF JCT US 85, Douglas, CO

Built 2018 Load: 35.6 t ADT: 36,500

SH 470 ML WBND

Good

Over: SOUTH PLATTE RIVER

0.4 MI W.OF US 85, Douglas, CO

Built 2019 Load: 35.6 t ADT: 36,500

SH 470 ML EBND

Good

Over: S. ERICKSON BLVD.

.3 M EAST OF JCT US 85, Douglas, CO

Built 1984 Load: 35.6 t ADT: 40,500

CHAMBERS ROAD

Good

Over: LEMON GULCH

0.15 M E OF CROWFT VAL RD, Douglas, CO

Built 2021 Load: 35.6 t ADT: 10,690

RAMP TO I 25 SBND

Good

Over: COUNTY LINE ROAD R

.85 MI N. JCT I-25 &, Douglas, CO

Built 1991 Load: 36.1 t ADT: 85,500

STROH ROAD

Good

Over: CHERRY CREEK

0.3 MI WEST OF HWY 83, Douglas, CO

Built 1987 Load: 37.1 t ADT: 5,189

NFSR 350

Good

Over: TROUT CREEK

0.1 MI E OF SH 67, Douglas, CO

Built 1992 Load: 37.2 t ADT: 123

LORRAINE ROAD

Good

Over: WEST CHERRY CREEK

0.3 MI W OF HIGHWAY 83, Douglas, CO

Built 1992 Load: 37.3 t ADT: 103

WB COTTONWOOD DR

Good

Over: CHERRY CREEK

0.5 M WEST OF PARKER RD, Douglas, CO

Built 1988 Load: 37.5 t ADT: 12,733

C.R 49/ RAINBOW RD

Good

Over: TROUT CREEK

0.1 MI E OF SH 67, Douglas, CO

Built 1992 Load: 37.8 t ADT: 155

CRYSTAL VALLEY PKW

Good

Over: SELLARS GULCH

0.1 MI W OF LAKE GULCH RD, Douglas, CO

Built 1999 Load: 38.8 t ADT: 5,296

PLUM CREEK PARKWAY

Good

Over: EAST PLUM CREEK

JUST E OF I-25, Douglas, CO

Built 2009 Load: 38.9 t ADT: 31,996

LINCOLN AVENUE WB

Good

Over: CHERRY CREEK

1.0 MI WEST OF HIGHWAY 83, Douglas, CO

Built 2000 Load: 39.4 t ADT: 14,905
Data sourced from official public datasets. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.