El Paso County, CO

686 public highway bridges

El Paso County Bridge Snapshot

According to the Federal Highway Administration's 2024 National Bridge Inventory, El Paso County, Colorado contains 686 public highway bridges. Roughly 27.8% are rated “Good,” 61.8% “Fair,” and 2.5% “Poor.” Poor means the lowest applicable deck, superstructure, substructure, or culvert rating is 4 or below on the 0–9 NBI scale. It is a condition category, not a live safety or closure decision.

Responsible agencies inspect covered bridges on risk-based intervals under current NBIS rules and submit inventory data to FHWA annually. The list below shows every NBI-tracked bridge in the county. Use the “Sort by” controls to change the ordering, and click any row for its reported inspection date, traffic count, and condition fields.

Source: FHWA National Bridge Inventory. See methodology for full definitions.

686
Total Bridges
27.8%
Good
61.8%
Fair
2.5%
Poor Condition

Condition Distribution

Good
27.8% (191)
Fair
61.8% (424)
Poor
2.5% (17)

All Bridges (686)

JUDGE ORR ROAD

Good

Over: BLACK SQUIRREL CREEK

2.5 MI E PEYTON HIGHWAY, El Paso, CO

Built 1996 Load: 39.9 t ADT: 1,760

NB I25 ML

Good

Over: SB SH21 RAMP

SH21 AND I25 INT, El Paso, CO

Built 2021 Load: 39.9 t ADT: 66,000

SH 94 ML

Good

Over: JIMMY CAMP CREEK

5.8 MI E OF JCT US 24, El Paso, CO

Built 1981 Load: 40.4 t ADT: 9,900

LOG ROAD

Good

Over: SQUIRREL CREEK

2.0 MI S OF JONES ROAD, El Paso, CO

Built 1997 Load: 40.7 t ADT: 65

SCHRIEVER ST

Good

Over: DRY DRAINAGE SWALE

0.7 miles east of Enoch R, El Paso, CO

Built 2008 Load: 40.8 t ADT: 200

RAMAH ROAD

Good

Over: BIG SANDY CREEK

1.2 MI WEST OF RAMAH, El Paso, CO

Built 2000 Load: 40.8 t ADT: 27

LOG ROAD

Good

Over: SQUIRREL CREEK

0.1 MI N OF JONES ROAD, El Paso, CO

Built 1997 Load: 40.8 t ADT: 55

CASCADE AVENUE

Good

Over: CHEYENNE RUN

S OF DORCHESTER DRIVE, El Paso, CO

Built 2020 Load: 41.8 t ADT: 1,461

MESA RIDGE PARKWAY

Good

Over: TRIB. JIMMY CAMP CREEK

0.2 MI W OF MARKSHEFFEL, El Paso, CO

Built 2018 Load: 41.8 t ADT: 7,662

SWEET ROAD

Good

Over: BIG SANDY CREEK TRIB

0.3 MI E OF LOG ROAD, El Paso, CO

Built 1998 Load: 41.9 t ADT: 104

I25 SB OFF RAMP

Good

Over: FOUNTAIN CREEK

_, El Paso, CO

Built 2015 Load: 42.1 t ADT: 58,000

SB I25 ML

Good

Over: SB SH21 RAMP

SH21 AND I25 INT, El Paso, CO

Built 2021 Load: 44.1 t ADT: 66,000

CHEYENNE CANYON RD

Good

Over: NORTH CHEYENNE CREEK

1.4 MI W EVANS AVENUE, El Paso, CO

Built 2022 Load: 44.4 t ADT: 1,566

NEVADA AVE NB

Good

Over: CS and E RR, VAN BUREN C

0.2 MI S. OF FILLMORE ST, El Paso, CO

Built 1949 Load: 44.8 t ADT: 8,919

SH21B / POWERS

Good

Over: RESEARCH PARKWAY

1.2 MI N OF WOODMEN, El Paso, CO

Built 2022 Load: 45.4 t ADT: 50,000

NBND SH21B ML RAMP

Good

Over: PINE CREEK

NE COLORADO SPRINGS, El Paso, CO

Built 2005 Load: 45.4 t ADT: 18,500

WEST POLK STREET

Good

Over: MONUMENT CREEK

0.5 MI W OF CASCADE AVE, El Paso, CO

Built 1986 Load: 46.4 t ADT: 948

RAMP TO N GATE

Good

Over: NB SH 21 RAMP

SH21 AND I25 INT, El Paso, CO

Built 2021 Load: 47.0 t ADT: 1,200

RAMP TO UNION

Good

Over: TEMPLETON GAP FLOODWAY

AUSTIN BLUFFS PKWY/UNION, El Paso, CO

Built 2009 Load: 47.6 t ADT: 6,359

SB I25 ML

Good

Over: NB SH 21 RAMP

SH21 AND I25 INT, El Paso, CO

Built 2021 Load: 47.6 t ADT: 66,000

JACKSON CREEK

Good

Over: LEATHER CHAPS DR

.7MI E of JACKSON CR PKWY, El Paso, CO

Built 2019 Load: 48.0 t ADT: 3,367

CARLSON DRIVE

Good

Over: DRY CREEK

JUST S OF WOODMEN ROAD, El Paso, CO

Built 1986 Load: 48.6 t ADT: 399

I 25 ML SBND

Good

Over: PINE CREEK

1.4 MI N OF JCT I-25 BUS, El Paso, CO

Built 2002 Load: 49.7 t ADT: 58,000

OIL WELL ROAD

Good

Over: N. FORK HORSE CREEK

0.9 MI N OF FUNK ROAD, El Paso, CO

Built 2017 Load: 50.2 t ADT: 20

US 24 ML

Good

Over: DRAW

8.0 MI NE OF JCT SH 94, El Paso, CO

Built 1999 Load: 50.2 t ADT: 16,000

Willow Road

Good

Over: Monument Creek

0.35 Mi N of Baptist Rd, El Paso, CO

Built 2022 Load: 51.8 t ADT: 1,495

WAGEMAN DRIVE

Good

Over: FOUNTAIN MUTUAL DITCH

JUST N OF BRADLEY ROAD, El Paso, CO

Built 2001 Load: 52.9 t ADT: 1,034

GOLDEN LANE

Good

Over: FOUNTAIN CREEK

JUST WEST OF COLORADO AVE, El Paso, CO

Built 2018 Load: 53.1 t ADT: 209

I 25 ML NBND

Good

Over: MONUMENT CREEK BRANCH

4.6 MI N OF JCT SH 83 ML, El Paso, CO

Built 1953 Load: 54.5 t ADT: 46,000

BRADLEY ROAD

Good

Over: JIMMY CAMP CREEK

.33 MI E MARKSHEFFEL RD, El Paso, CO

Built 1999 Load: 56.3 t ADT: 2,812

I25 NB OFF_ON RAMP

Good

Over: CHEYENNE CREK

IN COLORADO SPRINGS, El Paso, CO

Built 2002 Load: 56.6 t ADT: 44,000

I 25 SB ML

Good

Over: WILDLIFE UNDERPASS

1.8 MI N OF MONUMENT, El Paso, CO

Built 2020 Load: 58.3 t ADT: 67,000

CAPITAL DRIVE

Good

Over: EAST FORK SAND CREEK

JUST E OF RIVERWALK PKWY, El Paso, CO

Built 2003 Load: 60.5 t ADT: 1,234

RAMP TO SB ACADEMY

Good

Over: PARKING LOT EXIT

JUST S OF WOODMEN RD, El Paso, CO

Built 2012 Load: 61.5 t ADT: 4,629

MONUMENT HILL ROAD

Good

Over: WILDLIFE UNDERPASS RR

1.8 MI N OF MONUMENT, El Paso, CO

Built 2020 Load: 61.6 t ADT: 200

CURTIS ROAD

Good

Over: CHICO CREEK TRIBUTARY

2.25 MI N OF DRENNAN RD, El Paso, CO

Built 1999 Load: 61.8 t ADT: 476

HANCOCK AVENUE

Good

Over: TEMPLETON GAP FLOODWAY

.5 MI NE FILLMORE/NEVADA, El Paso, CO

Built 2012 Load: 63.0 t ADT: 3,792

I 25 NB ML

Good

Over: WILDLIFE UNDERPASS

1.8 MI N OF MONUMENT, El Paso, CO

Built 2019 Load: 64.8 t ADT: 67,000

MERIDIAN RANCH BLV

Good

Over: SQUIRREL CREEK TRIBUTARY

0.2 MI N OF STAPELTON RD, El Paso, CO

Built 2002 Load: 67.2 t ADT: 1,808

WAYNOKA ROAD

Good

Over: SAND CREEK

0.2 MI. NE OF POWERS BLVD, El Paso, CO

Built 2004 Load: 68.5 t ADT: 3,395

SH 16 ML

Good

Over: OVERFLOW CHANNEL

0.2 mi E of Jct US 85, El Paso, CO

Built 1988 Load: 68.5 t ADT: 32,000

HOLTWOOD ROAD

Good

Over: HORSE CREEK

0.7 MI N OF CORONA ROAD, El Paso, CO

Built 2017 Load: 71.3 t ADT: 55

EAST LAS VEGAS ST

Good

Over: COLONY HILLS CANAL

0.45 MI N OF HWY 85-87, El Paso, CO

Built 2020 Load: 72.3 t ADT: 6,535

FALCON HIGHWAY

Good

Over: BRANCH SQUIRREL CREEK

0.1 MI E OF ABILENE DRIVE, El Paso, CO

Built 1995 Load: 73.3 t ADT: 2,048

I 25 ML NBND

Good

Over: SMITH CREEK

5.3 MI N OF JCT SH 83 ML, El Paso, CO

Built 1958 Load: 78.9 t ADT: 46,000

Gateway Road

Good

Over: Foothills Trail

W of 30th St intersection, El Paso, CO

Built 2022 Load: 81.0 t ADT: 1,900

JACKPOT DRIVE

Good

Over: WEST SAND CREEK TRIB.

JUST W OF CHARLOTTE PKWY, El Paso, CO

Built 1996 Load: 86.9 t ADT: 1,714

AIRPORT ROAD

Good

Over: SPRING CREEK

0.15 MI W OF ACADEMY BLVD, El Paso, CO

Built 2022 Load: 87.5 t ADT: 10,017

WEST MONUMENT CREE

Good

Over: WEST MONUMENT CREEK

0.5 MI SOUTHWEST OF PINE, El Paso, CO

Built 1980 Load: 89.8 t ADT: 50

WINDHOVER LN

Good

Over: LOCAL DRAINAGE

JUST S OF HANCOCK EXPWY, El Paso, CO

Built 2001 Load: 90.9 t ADT: 507
Data sourced from official public datasets. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.