Summit County, CO

57 public highway bridges

Summit County Bridge Snapshot

According to the Federal Highway Administration's 2024 National Bridge Inventory, Summit County, Colorado contains 57 public highway bridges. Roughly 22.8% are rated “Good,” 57.9% “Fair,” and 5.3% “Poor.” Poor means the lowest applicable deck, superstructure, substructure, or culvert rating is 4 or below on the 0–9 NBI scale. It is a condition category, not a live safety or closure decision.

Responsible agencies inspect covered bridges on risk-based intervals under current NBIS rules and submit inventory data to FHWA annually. The list below shows every NBI-tracked bridge in the county. Use the “Sort by” controls to change the ordering, and click any row for its reported inspection date, traffic count, and condition fields.

Source: FHWA National Bridge Inventory. See methodology for full definitions.

57
Total Bridges
22.8%
Good
57.9%
Fair
5.3%
Poor Condition

Condition Distribution

Good
22.8% (13)
Fair
57.9% (33)
Poor
5.3% (3)

All Bridges (57)

SH 91 ML

Unknown

Over: I 70 ML

AT COPPER MOUNTAIN, Summit, CO

Built 1977 ADT: 18,000

SHRINE PASS ROAD

Unknown

Over: I 70 ML

0.1 MI E OF EAGLE SUMMIT, Summit, CO

Built 1975 ADT: 640

I 70 ML WBND

Unknown

Over: FARM ACCESS ROAD

1.6 MI E OF JCT SH 6, Summit, CO

Built 1964 ADT: 100

I70 ML WBND

Unknown

Over: SH 9 ML

AT SILVERTHORNE, Summit, CO

Built 1971 ADT: 32,700

I 70 ML EBND

Unknown

Over: US 6 ML

AT SILVERTHORNE, Summit, CO

Built 1971 ADT: 22,900

SH 9 ML

Unknown

Over: I 70 ML

AT FRISCO, Summit, CO

Built 1971 ADT: 28,000

I 70 ML EBND

Unknown

Over: BlueRvr-Adams Ave and...

10.5 MI E OF JCT SH 91, Summit, CO

Built 1971

SH 91 ML

Unknown

Over: CLIMAX MINE HAUL ROAD

.1 MI N LAKE/SUMMIT CO LI, Summit, CO

Built 1989 ADT: 3,200

SLATE CREEK RD

Fair

Over: BLUE RIVER

0.4 MI WEST OF HIGHWAY 9, Summit, CO

Built 1923 Load: 8.1 t ADT: 13

I 70 ML EBND

Fair

Over: WILDER GULCH

1 MI E OF EAGLE SUMMIT CL, Summit, CO

Built 1977 Load: 13.0 t ADT: 10,000

FRENCH STREET

Fair

Over: BLUE RIVER

JUST WEST OF MAIN ST, Summit, CO

Built 1985 Load: 15.5 t ADT: 2,706

E. KEYSTONE RD.

Fair

Over: SNAKE RIVER

.2 MI W OF MONTEZUMA RD, Summit, CO

Built 1978 Load: 19.6 t ADT: 433

County Road 1813

Fair

Over: Blue River

26 mi NW of Silverthorne, Summit, CO

Built 1938 Load: 22.5 t ADT: 10

HAMILTON CREEK RD

Fair

Over: BLUE RIVER

.4 MILE EAST OF HIGHWAY 9, Summit, CO

Built 1980 Load: 22.5 t ADT: 483

I 70 ML EBND

Fair

Over: STAFFORD GULCH

2.5 MI E OF EAGLE SUMMIT, Summit, CO

Built 1977 Load: 23.0 t ADT: 10,000

I 70 ML EBND

Fair

Over: WEST TEN MILE CREEK

@ COPPER MOUNTAIN, Summit, CO

Built 1977 Load: 24.7 t ADT: 10,000

BALD EAGLE ROAD

Fair

Over: BLUE RIVER

0.2 MI EAST OF HIGHWAY 9, Summit, CO

Built 2015 Load: 27.5 t ADT: 851

SH 9 ML

Fair

Over: BLUE RIVER

13.5 MI NO OF JCT I 70, Summit, CO

Built 1957 Load: 27.9 t ADT: 3,400

I 70 ML WBND

Fair

Over: BlueRvr-Adams Ave and...

IN SILVERTHORNE, Summit, CO

Built 1971 Load: 28.9 t ADT: 20,000

SH 9 ML

Fair

Over: BLUE RIVER

16.8 MI NO OF JCT I 70, Summit, CO

Built 1961 Load: 29.4 t ADT: 3,200

I 70 ML WBND

Fair

Over: FRISCO MAIN STREET

SW END OF FRISCO, Summit, CO

Built 1971 Load: 29.8 t ADT: 13,500

I 70 ML EBND

Fair

Over: FRISCO MAIN STREET

SW END OF FRISCO, Summit, CO

Built 1971 Load: 29.8 t ADT: 13,500

Heeney Road

Fair

Over: Green Mtn Dam Spillway

26 mi N of Silverthorne, Summit, CO

Built 1942 Load: 32.4 t ADT: 100

MAIN STREET

Fair

Over: TEN MILE CREEK

0.1 MI E OF I-70, Summit, CO

Built 1970 Load: 32.4 t ADT: 5,497

WEST KEYSTONE RD.

Fair

Over: SNAKE RIVER

0.3 MI S OF HIGHWAY 9, Summit, CO

Built 1972 Load: 32.7 t ADT: 1,640

BOULDER CREEK RD

Fair

Over: BOULDER CREEK

0.1 MI W OF STATE HWY 9, Summit, CO

Built 1945 Load: 32.7 t ADT: 43

ADAMS AVENUE

Fair

Over: BLUE RIVER

0.1 MI WEST OF MAIN ST, Summit, CO

Built 1992 Load: 32.7 t ADT: 606

SH 9 ML

Fair

Over: BLUE RIVER

IN SILVERTHORNE, Summit, CO

Built 1982 Load: 32.7 t ADT: 20,000

CREEKSIDE DRIVE

Fair

Over: TEN MILE CREEK

0.1 MI N OF MAIN STREET, Summit, CO

Built 1965 Load: 32.7 t ADT: 548

MADISON AVE

Fair

Over: TEN MILE CREEK

0.1 MI N OF MAIN STREET, Summit, CO

Built 1965 Load: 32.7 t ADT: 667

4TH AVE-CREEKSIDE

Fair

Over: TEN MILE CREEK

0.2 MI N OF MAIN STREET, Summit, CO

Built 1965 Load: 32.7 t ADT: 980

STEPHENS STREET

Fair

Over: STRAIGHT CREEK

NEAR FACTORY OUTLET, Summit, CO

Built 1989 Load: 32.7 t ADT: 8,716

BROKEN LANCE DR

Fair

Over: BLUE RIVER

0.5 MI SW OF HIGHWAY 9, Summit, CO

Built 1979 Load: 34.2 t ADT: 925

MONTEZUMA RD CR5

Fair

Over: SNAKE RIVER

1 MI NORTH OF MONTEZUMA, Summit, CO

Built 2015 Load: 34.7 t ADT: 401

PARK AVENUE

Fair

Over: BLUE RIVER

JUST WEST OF SH 9, Summit, CO

Built 1985 Load: 36.1 t ADT: 10,668

I 70 ML EBND

Fair

Over: FARM ACCESS ROAD

1.6 MI E OF JCT US 6 + SH, Summit, CO

Built 1964 Load: 38.5 t ADT: 16,000

WILDERNEST ROAD

Fair

Over: BLUE RIVER

.1 MI W OF STATE HWY 9, Summit, CO

Built 1983 Load: 43.1 t ADT: 11,850

SWAN MOUNTAIN RD

Fair

Over: BLUE RIVER

.2 MILE EAST OF HIGHWAY 9, Summit, CO

Built 1993 Load: 46.9 t ADT: 3,594

SH 9 ML

Fair

Over: TENMILE CREEK

IN FRISCO, Summit, CO

Built 1980 Load: 50.1 t ADT: 24,000

US 6 ML

Fair

Over: SNAKE RIVER

5 MI S OF DILLON, Summit, CO

Built 1980 Load: 99.9 t ADT: 8,000

SH 9 ML

Fair

Over: BLUE RIVER

0.8 MI S. OF BRECKINGRIDG, Summit, CO

Built 1962 Load: 99.9 t ADT: 8,900

SH 9 ML

Good

Over: BLUE RIVER

11.5 MI NO OF JCT I70, Summit, CO

Built 2002 Load: 11.4 t ADT: 2,800

SH 9 ML

Good

Over: BLUE RIVER

4.1 MI NO OF BRECKENRIDGE, Summit, CO

Built 2013 Load: 25.1 t ADT: 21,000

SH 9 ML

Good

Over: BLUE RIVER

SH 9 OVER BLUE RIVER, Summit, CO

Built 2008 Load: 27.5 t ADT: 20,000

US 6 ML

Good

Over: MONTEZUMA ROAD WBND

AT MONTEZUMA ROAD, Summit, CO

Built 1995 Load: 27.8 t ADT: 1,600

FSR 355.1

Good

Over: SOUTH FORK SWAN

INTERSECTION OF 355.1B, Summit, CO

Built 2003 Load: 30.1 t ADT: 25

REVETT DRIVE

Good

Over: SWAN RIVER

0.1 MI N OF TIGER RD, Summit, CO

Built 1997 Load: 32.7 t ADT: 156

SH 9 ML

Good

Over: PEDESTRIAN UNDERPASS

200 FT S of Peak One Blvd, Summit, CO

Built 2023 Load: 32.7 t ADT: 22,287

I 70 EBND

Good

Over: FOREST SERVICE ROAD

2.6 MI W OF EISENHWR TUNL, Summit, CO

Built 2021 Load: 36.6 t ADT: 36,000

I 70 WBND

Good

Over: FOREST SERVICE ROAD

2.6 MI W OF EISENHWR TUNL, Summit, CO

Built 2021 Load: 37.6 t ADT: 36,000
Data sourced from official public datasets. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.