Christian County, IL

323 public highway bridges

Christian County Bridge Snapshot

According to the Federal Highway Administration's 2024 National Bridge Inventory, Christian County, Illinois contains 323 public highway bridges. Roughly 16.1% are rated “Good,” 66.3% “Fair,” and 16.7% “Poor.” Poor means the lowest applicable deck, superstructure, substructure, or culvert rating is 4 or below on the 0–9 NBI scale. It is a condition category, not a live safety or closure decision.

Responsible agencies inspect covered bridges on risk-based intervals under current NBIS rules and submit inventory data to FHWA annually. The list below shows every NBI-tracked bridge in the county. Use the “Sort by” controls to change the ordering, and click any row for its reported inspection date, traffic count, and condition fields.

Source: FHWA National Bridge Inventory. See methodology for full definitions.

323
Total Bridges
16.1%
Good
66.3%
Fair
16.7%
Poor Condition

Condition Distribution

Good
16.1% (52)
Fair
66.3% (214)
Poor
16.7% (54)

All Bridges (323)

TR 165 A

Fair

Over: OVERFLOW BRIDGE

1.25MI SE KINCAID, Christian, IL

Built 1997 Load: 32.4 t ADT: 350

TR 321 A

Fair

Over: BEAR CREEK

1.5 S MORRISONVILLE, Christian, IL

Built 1996 Load: 32.4 t ADT: 50

TR 245

Fair

Over: LOCUST CREEK

1.5 MI SW OWANECO, Christian, IL

Built 1994 Load: 32.4 t ADT: 20

TR 277

Fair

Over: BEAR CREEK

1.5 NE MORRISONVILLE, Christian, IL

Built 1994 Load: 32.4 t ADT: 20

TR 178

Fair

Over: COTTONWOOD BRANCH

3MI SW OWANECO, Christian, IL

Built 1997 Load: 32.4 t ADT: 20

MONTGOMERY CO TR 7

Fair

Over: SOUTH FORK

5.8 MI SW ROSAMOND, Christian, IL

Built 1998 Load: 32.4 t ADT: 150

TR 162

Fair

Over: GROVE CITY CREEK

3.5MI SW MT. AUBURN, Christian, IL

Built 1998 Load: 32.4 t ADT: 50

TR 263

Fair

Over: COAL CREEK

2.0 MI S PANA, Christian, IL

Built 1999 Load: 32.4 t ADT: 225

TR 176

Fair

Over: SPRING BRANCH

4.0 MI N TAYLORVILLE, Christian, IL

Built 1999 Load: 32.4 t ADT: 50

TR 283

Fair

Over: COTTONWOOD CREEK

3 M SW OWANECO, Christian, IL

Built 2009 Load: 32.4 t ADT: 20

TR 296

Fair

Over: FLAT BRANCH

2MI W MOWEQUEA, Christian, IL

Built 2002 Load: 32.4 t ADT: 225

CH 10-FAS 732

Fair

Over: BEAR CREEK

1 MI E MORRISONVILLE, Christian, IL

Built 2002 Load: 32.4 t ADT: 500

TR 2A

Fair

Over: PRAIRIE FORK

1 M N HARVEL, Christian, IL

Built 2007 Load: 32.4 t ADT: 50

CH-10 FAS 732

Fair

Over: PRAIRIE CREEK

1 M W MORRISONVILLE, Christian, IL

Built 2002 Load: 32.4 t ADT: 800

FAS 732 (CH 10)

Fair

Over: MILLER BRANCH

2.5 E MORRISONVILLE, Christian, IL

Built 2006 Load: 32.4 t ADT: 400

TR 78

Fair

Over: LOWIS BRANCH

3MI SE MORRISONVILLE, Christian, IL

Built 2005 Load: 32.4 t ADT: 100

TR 235

Fair

Over: PRAIRIE FORK

1.5MI N PALMER, Christian, IL

Built 2005 Load: 32.4 t ADT: 100

TR 235

Fair

Over: BEAR CREEK

1MI N PALMER, Christian, IL

Built 2005 Load: 32.4 t ADT: 100

FAS 639 (CH 5)

Fair

Over: MILLER BRANCH

2 M S PALMER, Christian, IL

Built 2006 Load: 32.4 t ADT: 200

TR 196A

Fair

Over: S. FORK SANGAMON R

3.5MI SW ROSAMOND, Christian, IL

Built 2005 Load: 32.4 t ADT: 100

TR 50

Fair

Over: LONG GROVE CREEK

.8 MI NW MOWEAQUA, Christian, IL

Built 2009 Load: 32.4 t ADT: 175

TR 343

Fair

Over: BEAMER BRANCH

7Mi SE Morrisonville, Christian, IL

Built 2014 Load: 32.4 t ADT: 25

TR 151

Fair

Over: BRUSHY BRANCH

3.5 M SE STONINGTON, Christian, IL

Built 2008 Load: 32.4 t ADT: 175

TR 186A

Fair

Over: S FK SANGAMON RVR

5 M SW ROSEMOND, Christian, IL

Built 2009 Load: 32.4 t ADT: 10

TR 50

Fair

Over: LONG GROVE TRIB

.75 M N MOWEQUA, Christian, IL

Built 2009 Load: 32.4 t ADT: 175

TR 57

Fair

Over: Buckhart Creek

4 MI NE of Edinburg, Christian, IL

Built 2013 Load: 32.4 t ADT: 35

TR 169

Fair

Over: BID GEORGE BR

3 M N ASSUMPTION, Christian, IL

Built 2009 Load: 32.4 t ADT: 100

TR 206

Fair

Over: TRIB LOCUST CREEK

.5 M W OWANECO, Christian, IL

Built 2014 Load: 32.4 t ADT: 20

TR 307A

Fair

Over: STH FRK SANGAMON RV

7 M E Morrisonville, Christian, IL

Built 2013 Load: 32.4 t ADT: 20

TR 216

Fair

Over: BUCKHART CREEK

NW edge Stonington, Christian, IL

Built 2012 Load: 32.4 t ADT: 175

TR 245

Fair

Over: COTTONWOOD CREEK

0.51 mi E TR 196, Christian, IL

Built 2015 Load: 32.4 t ADT: 20

TR 151A

Fair

Over: Big George Branch

0.03 mi E TR 296, Christian, IL

Built 2015 Load: 32.4 t ADT: 225

TR 289

Fair

Over: Locust Creek

0.08 mi W TR 228, Christian, IL

Built 2015 Load: 32.4 t ADT: 50

CHEROKEE ST

Fair

Over: DIEHL CREEK

MORRISONVILLE, Christian, IL

Built 1997 Load: 32.4 t ADT: 225

TR 196 A

Fair

Over: OHLMAN BRANCH

1 MI NW OHLMAN, Christian, IL

Built 1964 Load: 32.7 t ADT: 100

CH 1-FAS 0645

Fair

Over: S. FORK SANGAMON R.

1.25 MI. S. TAYLORVL, Christian, IL

Built 1971 Load: 33.0 t ADT: 2,550

TR 71A

Fair

Over: WILLOW BRANCH

2.5 MI NNW MOWEAQUA, Christian, IL

Built 1996 Load: 34.7 t ADT: 100

US 51/IL 16

Fair

Over: BECKS CR. TRIB.

.2M W US 51 - E PANA, Christian, IL

Built 1923 Load: 35.6 t ADT: 6,600

CH 1/FAS 645

Fair

Over: S. FORK SANGAMON R.

11.5MI S TAYLORVLE, Christian, IL

Built 1993 Load: 35.6 t ADT: 1,900

MT AUBURN RD

Fair

Over: BUCKHART CREEK

7.8M N IL29,TAYLORVL, Christian, IL

Built 1991 Load: 36.0 t ADT: 650

TR 189

Fair

Over: BEAR CREEK

2.5MI W TAYLORVILLE, Christian, IL

Built 1969 Load: 36.3 t ADT: 125

TR 106

Fair

Over: BRUSH CREEK

1.8 M E PALMER, Christian, IL

Built 1981 Load: 36.3 t ADT: 50

TR 189

Fair

Over: S. FORK SANGAMON R.

2.0 M S LANGLEYVLLE, Christian, IL

Built 1971 Load: 36.6 t ADT: 325

CH 8

Fair

Over: LAKE TAYLORVILLE

3 MI W OWANECO, Christian, IL

Built 2002 Load: 36.6 t ADT: 300

TR 273

Fair

Over: COTTONWOOD BRANCH

4 SW OF OWANECO, Christian, IL

Built 1920 Load: 36.9 t ADT: 50

US 51(SB)

Fair

Over: MAIN DRAIN DITCH

3.2MI S ASSUMPTION, Christian, IL

Built 2002 Load: 37.3 t ADT: 3,600

TR 187

Fair

Over: S FORK SANGAMON R

3.25 N W TAYLORVILLE, Christian, IL

Built 1994 Load: 37.6 t ADT: 75

CH-7 (FAS-643)

Fair

Over: SPRING CREEK

6 MI N OF OWANECO, Christian, IL

Built 1986 Load: 38.2 t ADT: 400

TR 253

Fair

Over: COTTONWOOD BRANCH

3.5MI W OF OWANECO, Christian, IL

Built 1992 Load: 38.2 t ADT: 25

TR 345

Fair

Over: BEAR CREEK

3.25 MI E HARVEL, Christian, IL

Built 1986 Load: 39.2 t ADT: 20
Data sourced from official public datasets. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.