Effingham County, IL

260 public highway bridges

Effingham County Bridge Snapshot

According to the Federal Highway Administration's 2024 National Bridge Inventory, Effingham County, Illinois contains 260 public highway bridges. Roughly 45.4% are rated “Good,” 31.9% “Fair,” and 3.8% “Poor.” Poor means the lowest applicable deck, superstructure, substructure, or culvert rating is 4 or below on the 0–9 NBI scale. It is a condition category, not a live safety or closure decision.

Responsible agencies inspect covered bridges on risk-based intervals under current NBIS rules and submit inventory data to FHWA annually. The list below shows every NBI-tracked bridge in the county. Use the “Sort by” controls to change the ordering, and click any row for its reported inspection date, traffic count, and condition fields.

Source: FHWA National Bridge Inventory. See methodology for full definitions.

260
Total Bridges
45.4%
Good
31.9%
Fair
3.8%
Poor Condition

Condition Distribution

Good
45.4% (118)
Fair
31.9% (83)
Poor
3.8% (10)

All Bridges (260)

TR-62

Good

Over: BROCKETT CREEK

2.5 MI NE GILMORE, Effingham, IL

Built 1990 Load: 37.3 t ADT: 100

TR-25

Good

Over: WOLF CREEK

3 MI E BEECHER CITY, Effingham, IL

Built 1992 Load: 37.3 t ADT: 50

TR-220

Good

Over: SUGAR FORK

3 MI N EFFINGHAM, Effingham, IL

Built 1991 Load: 37.3 t ADT: 375

FAS-708 (CH_12)

Good

Over: RAMSEY CREEK

3 MI W EBERLE, Effingham, IL

Built 1998 Load: 37.3 t ADT: 200

FAS 1652 (US 45)

Good

Over: E Branch Green Creek

1.5 Mi. S Shelby Co., Effingham, IL

Built 2016 Load: 37.6 t ADT: 3,950

TR-194A

Good

Over: GREEN CREEK

3.5 MI N EFFINGHAM, Effingham, IL

Built 1993 Load: 37.6 t ADT: 475

FAS-1710 (CH-24)

Good

Over: LILY CREEK

2 MI S FUNKHOUSER, Effingham, IL

Built 1991 Load: 37.6 t ADT: 950

TR-85B

Good

Over: LITTLE WABASH RIVER

1 MI W EFFINGHAM, Effingham, IL

Built 1995 Load: 37.6 t ADT: 950

TR-238

Good

Over: LITTLE BISHOP CREEK

3 MI SW ELLIOTSTOWN, Effingham, IL

Built 2004 Load: 37.6 t ADT: 50

TR 139

Good

Over: BISHOP CREEK

1.5 MI NW DIETERICH, Effingham, IL

Built 2005 Load: 37.6 t ADT: 125

TR-62

Good

Over: BIG CREEK

3 MI S DEXTER, Effingham, IL

Built 1984 Load: 37.9 t ADT: 125

TR 217

Good

Over: SALT CREEK

1.25 MI SE WATSON WY, Effingham, IL

Built 1986 Load: 37.9 t ADT: 350

TR 34A

Good

Over: FULFER CREEK

1.25 MI SW GILMORE, Effingham, IL

Built 2013 Load: 37.9 t ADT: 50

TR-208

Good

Over: SUGAR FORK

3 MI N EFFINGHAM, Effingham, IL

Built 1988 Load: 38.2 t ADT: 125

TR-251

Good

Over: SALT CREEK

2.5 MI S WATSON WYE, Effingham, IL

Built 1995 Load: 38.2 t ADT: 200

TR 4

Good

Over: WOLF CREEK

1 MI S BEECHER CITY, Effingham, IL

Built 2003 Load: 38.2 t ADT: 300

TR-309

Good

Over: LIMESTONE CREEK

1 MI S WINTERROWD, Effingham, IL

Built 1989 Load: 38.6 t ADT: 150

TR-174B

Good

Over: WALKER CREEK

0.5 MI N WATSON, Effingham, IL

Built 1991 Load: 38.6 t ADT: 100

TR 256

Good

Over: CREEK

1 MI NW TEUTOPOLIS, Effingham, IL

Built 2008 Load: 38.6 t ADT: 225

FAS-708 (CH-12)

Good

Over: BISHOP CREEK

3.75 MI WNW EBERLE, Effingham, IL

Built 1988 Load: 38.9 t ADT: 400

TR 300

Good

Over: LITTLE BISHOP CREEK

1 MI SE ELLIOTSTOWN, Effingham, IL

Built 2002 Load: 38.9 t ADT: 100

TR-30

Good

Over: CORWIN CREEK

2 MI E BEECHER CITY, Effingham, IL

Built 1998 Load: 39.2 t ADT: 200

TR-268

Good

Over: LITTLE SALT CREEK

2 MI E HEARTVILLE, Effingham, IL

Built 1990 Load: 39.2 t ADT: 125

FAS-1710 (CH-24)

Good

Over: BIG CREEK

4 MI N MASON, Effingham, IL

Built 1983 Load: 39.2 t ADT: 125

TR 4

Good

Over: MOCCASIN CREEK

3.5 MI S BEECHER CIT, Effingham, IL

Built 2002 Load: 39.2 t ADT: 125

TR-44

Good

Over: BIG CREEK

2.5 MI SE ALTAMONT, Effingham, IL

Built 1987 Load: 39.5 t ADT: 275

TR-267

Good

Over: BISHOP CREEK

4.25 MI WNW EBERLE, Effingham, IL

Built 1994 Load: 39.5 t ADT: 150

TR 310 A

Good

Over: LITTLE SALT CREEK

2 MI E ELLIOTSTOWN, Effingham, IL

Built 2005 Load: 39.5 t ADT: 50

FAS 709 (CH 19)

Good

Over: RAMSEY CREEK

1.5 MI NORTH EBERLE, Effingham, IL

Built 2006 Load: 39.9 t ADT: 400

CH-5

Good

Over: WOLF CREEK

2 MI ESE HOLLAND, Effingham, IL

Built 1993 Load: 40.2 t ADT: 200

FAS 2801 IL 128

Good

Over: LITTLE MOCCASIN CK

3.25 MI S IL 33, Effingham, IL

Built 2022 Load: 41.1 t ADT: 1,150

FAU 8390

Good

Over: LITTLE WABASH RIVER

0.5 MI NW EFFINGHAM, Effingham, IL

Built 2000 Load: 41.5 t ADT: 2,450

TR 302 2100th stre

Good

Over: DIETERICH CREEK

2 MI N ELLIOTSTOWN, Effingham, IL

Built 2021 Load: 42.1 t ADT: 100

FAS-1712 (CH-16)

Good

Over: BISHOP CREEK

3 MI W DIETRICH, Effingham, IL

Built 2022 Load: 43.7 t ADT: 775

FAP-774 (ILL-32,33

Good

Over: LITTLE WABASH RIVER

2 MI NW EFFINGHAM, Effingham, IL

Built 1974 Load: 44.4 t ADT: 11,600

TR 4

Good

Over: ROCK CREEK

2.5 MI NW ALTAMONT, Effingham, IL

Built 2009 Load: 45.0 t ADT: 50

TR 41

Good

Over: SECOND SALT CREEK

2 MI N TEUTOPOLIS, Effingham, IL

Built 2006 Load: 45.7 t ADT: 100

FAS 2796 (US-40)

Good

Over: COON CREEK

.75 MI E ALTAMONT, Effingham, IL

Built 1989 Load: 46.0 t ADT: 4,350

FAS 708 CH 12- 200

Good

Over: LITTLE MUDDY CREEK

1 MI. W WINTERROWD, Effingham, IL

Built 2019 Load: 46.0 t ADT: 150

FAS-711 (CH-25)

Good

Over: COON CREEK

N EDGE ALTAMONT, Effingham, IL

Built 1991 Load: 46.3 t ADT: 1,550

TR 283

Good

Over: LIMESTONE CREEK

1.5 MI NW EDGEWOOD, Effingham, IL

Built 2012 Load: 46.7 t ADT: 50

TR 34A

Good

Over: Fulfer Creek

3.5 Mi. W. Edgewood, Effingham, IL

Built 2019 Load: 46.7 t ADT: 25

TR-14

Good

Over: BEECH CREEK

3.5 MI N ALTAMONT, Effingham, IL

Built 1982 Load: 47.0 t ADT: 75

TR 195

Good

Over: DIETERICH CREEK

1 MI SW DIETERICH, Effingham, IL

Built 2015 Load: 48.3 t ADT: 75

TR 68

Good

Over: FULFER CREEK

1.5 MI NW MASON, Effingham, IL

Built 2010 Load: 48.6 t ADT: 100

FAS 2801 (IL 128)

Good

Over: BIG MOCCASIN CREEK

4.25 MI S. IL 33, Effingham, IL

Built 2023 Load: 49.6 t ADT: 1,150

TR 242A

Good

Over: TRIB OF SALT CREEK

1 MI SE OF EFFINGHAM, Effingham, IL

Built 2010 Load: 49.6 t ADT: 225

FAP-328 (US-45)

Good

Over: RAMSEY CREEK

5.25 MI S ILL-37 JCT, Effingham, IL

Built 1977 Load: 57.0 t ADT: 3,150

TR-14

Good

Over: BIG CREEK

1.5 M SW ALTAMONT, Effingham, IL

Built 1977 Load: 59.3 t ADT: 200

FAS-1706 (CH-6)

Good

Over: LAKE SARA

3 MI SE SHUMWAY, Effingham, IL

Built 1958 Load: 84.9 t ADT: 1,500
Data sourced from official public datasets. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.