Macon County, IL

368 public highway bridges

Macon County Bridge Snapshot

According to the Federal Highway Administration's 2024 National Bridge Inventory, Macon County, Illinois contains 368 public highway bridges. Roughly 23.4% are rated “Good,” 44.3% “Fair,” and 13% “Poor.” Poor means the lowest applicable deck, superstructure, substructure, or culvert rating is 4 or below on the 0–9 NBI scale. It is a condition category, not a live safety or closure decision.

Responsible agencies inspect covered bridges on risk-based intervals under current NBIS rules and submit inventory data to FHWA annually. The list below shows every NBI-tracked bridge in the county. Use the “Sort by” controls to change the ordering, and click any row for its reported inspection date, traffic count, and condition fields.

Source: FHWA National Bridge Inventory. See methodology for full definitions.

368
Total Bridges
23.4%
Good
44.3%
Fair
13%
Poor Condition

Condition Distribution

Good
23.4% (86)
Fair
44.3% (163)
Poor
13% (48)

All Bridges (368)

TR 23 A(NEWBURG RD

Fair

Over: TRIB TO FRIENDS CR

1.5 MI E OF ARGENTA, Macon, IL

Built 1999 Load: 32.4 t ADT: 10

TR 308 C

Fair

Over: STREAM

3.4 MI NE ARGENTA, Macon, IL

Built 2000 Load: 32.4 t ADT: 25

TR 44(WEST ST RD)

Fair

Over: POINT SLOUGH

3 MI S WARRENSBURG, Macon, IL

Built 2000 Load: 32.4 t ADT: 50

TR 73

Fair

Over: Tirib Long Pt Slough

2.5 MI NW OF NIANTIC, Macon, IL

Built 1999 Load: 32.4 t ADT: 25

TR 17(POLAND RD)

Fair

Over: SOUTH FORK CREEK

3.2 MI N WARRENSBURG, Macon, IL

Built 2002 Load: 32.4 t ADT: 25

CH 18

Fair

Over: DRAINAGE DITCH

6.1 MI SW OF MAROA, Macon, IL

Built 2002 Load: 32.4 t ADT: 125

CH 67(JACOBS RD)

Fair

Over: LONG GROVE CREEK

4 MI SE OF MACON, Macon, IL

Built 2002 Load: 32.4 t ADT: 125

FAS 548 (CH 58)

Fair

Over: LAKE FORK CREEK

1.25 MI W MAROA, Macon, IL

Built 2002 Load: 32.4 t ADT: 375

FAS 556(CH 28)

Fair

Over: TRIB TO SANGAMON RIV

3.7 MI NW BOODY, Macon, IL

Built 2003 Load: 32.4 t ADT: 450

CH 27 (FAS 551)

Fair

Over: TRIB TO SANGAMON

2.2 MI SW HARRISTOWN, Macon, IL

Built 2003 Load: 32.4 t ADT: 300

TR 215(ELWIN RD)

Fair

Over: SPRING CREEK

1 MI N OF BOODY, Macon, IL

Built 2004 Load: 32.4 t ADT: 100

TR 25 WISE ROAD

Fair

Over: SOUTH FORK CREEK

3.6 MI NW WARRENSBUR, Macon, IL

Built 2005 Load: 32.4 t ADT: 20

TR 54 (W WISE RD)

Fair

Over: DRAIN DITCH

4.3 MI NW WARRENSBUR, Macon, IL

Built 2006 Load: 32.4 t ADT: 20

FAU 7449 (CH 7)

Fair

Over: FINLEY CREEK

N MT ZION, Macon, IL

Built 2012 Load: 32.4 t ADT: 7,000

FAS 544/CH25

Fair

Over: STREAM

1 MI N ARGENTA, Macon, IL

Built 2012 Load: 32.4 t ADT: 600

FAS 456

Fair

Over: LAKE FORK CREEK

7 MI W MAROA, Macon, IL

Built 2013 Load: 32.4 t ADT: 300

CH 36(Baker Rd)

Fair

Over: Dry Creek

1.8 Mi. SW of Macon, Macon, IL

Built 2016 Load: 32.4 t ADT: 100

FAS 546(CH 21)

Fair

Over: ILLINI DRAIN DITCH

1 MI E HEMAN, Macon, IL

Built 1980 Load: 32.4 t ADT: 425

TR 65A

Fair

Over: STREAM

2 MI N OF OAKLEY, Macon, IL

Built 1992 Load: 32.4 t ADT: 125

TR 1A(LAKE FORK RD

Fair

Over: STREAM

5.3 MI NW OF ARGENTA, Macon, IL

Built 1991 Load: 32.4 t ADT: 75

TR 263

Fair

Over: FINLEY CREEK

5 MI E OF MACON, Macon, IL

Built 1993 Load: 32.4 t ADT: 50

FAU 7355 – CH 24

Fair

Over: Lake Decatur Trib

4.3 Miles North East, Macon, IL

Built 1986 Load: 32.4 t ADT: 2,200

SEIBERLINGST(MS170

Fair

Over: MOSQUITO CREEK

E EDGE OF BLUE MOUND, Macon, IL

Built 1982 Load: 32.4 t ADT: 575

FAU 7437(ML KING D

Fair

Over: SPRING CREEK

N NE OF DECATUR, Macon, IL

Built 1994 Load: 32.4 t ADT: 7,100

BALTIMORE FAU7449

Fair

Over: BIG CREEK

1 MI N MT ZION, Macon, IL

Built 2012 Load: 32.4 t ADT: 6,750

TR 939-PARK DR

Fair

Over: STEVENS CREEK

FAIRVIEW PARK, Macon, IL

Built 2012 Load: 32.4 t ADT: 400

US 51 NB (FAP 710)

Fair

Over: LAKE DECATUR

IN DECATUR, Macon, IL

Built 1962 Load: 33.0 t ADT: 22,400

US 51 SB (FAP 710)

Fair

Over: LAKE DECATUR

IN DECATUR, Macon, IL

Built 1971 Load: 34.0 t ADT: 22,400

N MONROE ST(FAU743

Fair

Over: SPRING CREEK

N SIDE OF DECATUR, Macon, IL

Built 1969 Load: 34.7 t ADT: 8,650

TR 263(RIDLEN RD)

Fair

Over: WILLOW BRANCH

1.2 MI SE MACON, Macon, IL

Built 1976 Load: 34.7 t ADT: 350

W MAIN ST (FAU 738

Fair

Over: STEVENS CREEK

W EDGE OF DECATUR, Macon, IL

Built 1988 Load: 35.3 t ADT: 2,300

TR 259A(BETHEL RD)

Fair

Over: MOSQUITO CREEK

3 MI NE BLUE MOUND, Macon, IL

Built 1980 Load: 35.3 t ADT: 35

CH 41(WYCKLES RD)

Fair

Over: LAKE FORK CREEK

3 MI NE WARRENSBURG, Macon, IL

Built 1985 Load: 35.3 t ADT: 75

IL 48(FAU 7429)

Fair

Over: SANGAMON RIVER

0.5 MI N. OF ILL-105, Macon, IL

Built 1929 Load: 36.0 t ADT: 8,850

FAS 542 (SBI 2)

Fair

Over: LAKE FORK CREEK

.5 MI N OF MAROA, Macon, IL

Built 1980 Load: 36.0 t ADT: 675

TR 15A(MILLER RD)

Fair

Over: STREAM

1.5 MI NE ARGENTA, Macon, IL

Built 1984 Load: 36.0 t ADT: 75

FAU 7354(PERSHING

Fair

Over: SPRING CREEK

0.8 MI S BEARSDALE, Macon, IL

Built 2004 Load: 36.0 t ADT: 1,000

TR 30(STRAWN RD)

Fair

Over: DITCH

IL 121, Macon, IL

Built 1909 Load: 36.6 t ADT: 25

FAP 320 (IL 121)

Fair

Over: SOUTH FORK CREEK

1.5 MI W OF HEMAN, Macon, IL

Built 1999 Load: 36.9 t ADT: 3,750

TR 45(KIRBY RD)

Fair

Over: STREAM

2 MI SE OREANA, Macon, IL

Built 1981 Load: 36.9 t ADT: 800

FAP 320(IL 121 & 4

Fair

Over: SPRING CREEK

IN DECATUR, Macon, IL

Built 1971 Load: 37.3 t ADT: 17,900

US51(SB)(FAP 322)

Fair

Over: STEVENS CREEK

3 MI N OF FORSYTH, Macon, IL

Built 1982 Load: 37.3 t ADT: 12,000

US51(NB)(FAP 322)

Fair

Over: STEVENS CREEK

3 MI N OF FORSYTH, Macon, IL

Built 1983 Load: 37.3 t ADT: 12,000

TR 62(BANTAM RD)

Fair

Over: LAKE FORK CREEK

4.5 MI W MAROA, Macon, IL

Built 1976 Load: 37.6 t ADT: 50

MS 1800 C

Fair

Over: STREAM

W. BOILING SPRINGS, Macon, IL

Built 1982 Load: 37.9 t ADT: 550

IL 48(FAP 714)

Fair

Over: MOSQUITO CREEK

1.5 MI NE BLUE MOUND, Macon, IL

Built 1929 Load: 38.9 t ADT: 4,500

I-72 (EB)

Fair

Over: FRIENDS CREEK

1 MI E OF ARGENTA, Macon, IL

Built 1975 Load: 38.9 t ADT: 5,950

I-72 (WB)

Fair

Over: FRIENDS CREEK

1 MI E OF ARGENTA, Macon, IL

Built 1975 Load: 38.9 t ADT: 5,950

FAP 716 (IL 48)

Fair

Over: SPRING CREEK

N OF MCKINLEY AVE, Macon, IL

Built 2007 Load: 39.9 t ADT: 14,800

US 36(FAP 323)

Fair

Over: TRIB TO LONG CREEK

AT LONG CREEK, Macon, IL

Built 1928 Load: 40.5 t ADT: 6,400
Data sourced from official public datasets. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.