Massac County, IL

138 public highway bridges

Massac County Bridge Snapshot

According to the Federal Highway Administration's 2024 National Bridge Inventory, Massac County, Illinois contains 138 public highway bridges. Roughly 39.9% are rated “Good,” 39.9% “Fair,” and 8% “Poor.” Poor means the lowest applicable deck, superstructure, substructure, or culvert rating is 4 or below on the 0–9 NBI scale. It is a condition category, not a live safety or closure decision.

Responsible agencies inspect covered bridges on risk-based intervals under current NBIS rules and submit inventory data to FHWA annually. The list below shows every NBI-tracked bridge in the county. Use the “Sort by” controls to change the ordering, and click any row for its reported inspection date, traffic count, and condition fields.

Source: FHWA National Bridge Inventory. See methodology for full definitions.

138
Total Bridges
39.9%
Good
39.9%
Fair
8%
Poor Condition

Condition Distribution

Good
39.9% (55)
Fair
39.9% (55)
Poor
8% (11)

All Bridges (138)

TR 122

Fair

Over: SEVENMILE CREEK

0.9 MI N OF TR 115, Massac, IL

Built 1986 Load: 37.6 t ADT: 225

TR 4

Fair

Over: CREEK

0.4 MI N OF FAS 937, Massac, IL

Built 1999 Load: 37.9 t ADT: 50

MASSAC CREEK RD

Fair

Over: WEAVER CREEK

1 MI N OF METROPOLIS, Massac, IL

Built 1997 Load: 38.2 t ADT: 1,150

TR-128

Fair

Over: TRIB-TO-DAVIS-BAYOU

0.8 MI N OF CH3, Massac, IL

Built 1985 Load: 38.6 t ADT: 25

TR 25

Fair

Over: BEAR CREEK

.1 MI W ILL 145, Massac, IL

Built 2003 Load: 38.6 t ADT: 25

FAS 2937-ILL 169

Fair

Over: PATTERSON BRANCH

2.7 MI E PULASKI CO, Massac, IL

Built 1988 Load: 38.9 t ADT: 1,300

TR 65-KOMMER RD

Fair

Over: TRIB TO MASSAC CREEK

0.5 MI N FAS 959, Massac, IL

Built 1997 Load: 38.9 t ADT: 25

TR 133-UNITY SCH R

Fair

Over: UNNAMED STREAM

0.5 MI E CH 8, Massac, IL

Built 2001 Load: 38.9 t ADT: 650

TR 121

Fair

Over: SEVEN MILE CREEK

0.25 MI W OF CH 8, Massac, IL

Built 1990 Load: 39.9 t ADT: 50

US 45

Fair

Over: FOUR MILE CREEK

0.5 MI E OF ILL 145, Massac, IL

Built 1995 Load: 40.5 t ADT: 4,900

US 45

Fair

Over: TUCKER DITCH

3.5 MI S JOHNSON CO, Massac, IL

Built 1951 Load: 41.8 t ADT: 1,950

I-24 RAMP 259

Fair

Over: NEW COLUMBIA DITCH

NEW COLUMBIA INTERCH, Massac, IL

Built 1978 Load: 41.8 t ADT: 250

TR 133

Fair

Over: UNNAMED STREAM

0.1 MI E OF TR 142A, Massac, IL

Built 1990 Load: 42.1 t ADT: 275

MERMET ROAD

Fair

Over: MAIN DITCH

0.74 E OF US 45, Massac, IL

Built 1988 Load: 42.8 t ADT: 200

STRAWBERRY ROAD

Fair

Over: SEVENMILE CREEK

1 MI S US45, Massac, IL

Built 2007 Load: 44.4 t ADT: 175

ORCHARD ROAD

Fair

Over: UN-NAMED CREEK

1.41MI S OF CH 8, Massac, IL

Built 2008 Load: 45.4 t ADT: 25

US 45-FAP 889

Fair

Over: STREAM

0.8 MI W I-24, Massac, IL

Built 1999 Load: 46.0 t ADT: 12,800

ILL 145

Fair

Over: MASSAC CREEK

4 MI S POPE CO LINE, Massac, IL

Built 1932 Load: 49.9 t ADT: 2,050

US 45-FAS 960

Fair

Over: MAIN DITCH

1 MI S JOHNSON CO, Massac, IL

Built 2001 Load: 49.9 t ADT: 1,250

I-24 RAMP 260

Fair

Over: NEW COLUMBIA DITCH

NEW COLUMBIA INTERCH, Massac, IL

Built 1978 Load: 52.8 t ADT: 300

COUNTY HIGHWAY 5

Fair

Over: B.N.R.R.

2.5 MILE EAST JOPPA, Massac, IL

Built 1975 Load: 52.8 t ADT: 2,200

TR 2

Fair

Over: CREEK

0.5 MI N OF TR 4, Massac, IL

Built 1966 Load: 69.7 t ADT: 10

COUNTRY CLUB RD

Good

Over: ICRR

0.5 MI W CH 1, Massac, IL

Built 2023 ADT: 1,700

TR 149

Good

Over: STREAM W OF POPE CO

1 MI W COUNTY LINE, Massac, IL

Built 1900 Load: 24.3 t ADT: 50

I 24 EB

Good

Over: ABANDON RR BED

1.3 MI S OF US 45, Massac, IL

Built 1970 Load: 31.8 t ADT: 15,600

I 24 WB

Good

Over: ABANDON RR BED

1.3 MI S OF US 45, Massac, IL

Built 1970 Load: 31.8 t ADT: 15,600

OLD MARION RD

Good

Over: MUD CK

0.5 MI NE METROPOLIS, Massac, IL

Built 1977 Load: 32.4 t ADT: 1,600

AUGUST KRUEGER ROA

Good

Over: SEVENMILE CREEK

4.3 MI E ILL 145, Massac, IL

Built 1978 Load: 32.4 t ADT: 10

TR 59

Good

Over: SEN BECK DITCH

3 MI EAST MERMET LK, Massac, IL

Built 1979 Load: 32.4 t ADT: 175

TR 9

Good

Over: GEORGES CREEK

2 MI NE NEW COLUMBIA, Massac, IL

Built 1980 Load: 32.4 t ADT: 25

TR-58

Good

Over: SEN BECK DITCH

3 MILE SE MERMET, Massac, IL

Built 1980 Load: 32.4 t ADT: 150

CAANAN CH RD-TR 65

Good

Over: TRIB TO MASSAC CREEK

1.5 MI W OF IL 145, Massac, IL

Built 1981 Load: 32.4 t ADT: 175

COUNTRY CLUB ROAD

Good

Over: WEAVER CREEK

1.5 MI N METROPOLIS, Massac, IL

Built 1981 Load: 32.4 t ADT: 1,700

OLD MARION RD

Good

Over: WEAVER CREEK

1.2 MI N METROPOLIS, Massac, IL

Built 1982 Load: 32.4 t ADT: 1,800

UNIONVILLE ROAD

Good

Over: CRENSHAW CREEK TRIB

2.2 MI E US 45, Massac, IL

Built 1982 Load: 32.4 t ADT: 1,450

TR 121

Good

Over: FOUR MILE CREEK

1 MILE E OF IL 145, Massac, IL

Built 1983 Load: 32.4 t ADT: 125

TR 34A

Good

Over: PATERSON BRANCH

0.23 MI N IL 169, Massac, IL

Built 1993 Load: 32.4 t ADT: 25

SEILBECK RD

Good

Over: ICRR

.2 M W CH1, Massac, IL

Built 2012 Load: 32.4 t ADT: 50

SCHNEEMAN ROAD

Good

Over: Q DITCH

2.5 MI S OF MERMET, Massac, IL

Built 2011 Load: 32.4 t ADT: 100

POWERS CHURCH ROAD

Good

Over: SEVENMILE CREEK

4.1 MI N BROOKPORT, Massac, IL

Built 2016 Load: 32.4 t ADT: 100

FAU 9772

Good

Over: MUD CREEK

N METROPOLIS ST, Massac, IL

Built 1996 Load: 32.4 t ADT: 1,300

NORTH AVENUE

Good

Over: WEAVER CREEK

2.3 MI N US45, Massac, IL

Built 1971 Load: 33.7 t ADT: 2,150

I-24 EB

Good

Over: BEAR CREEK

4 MI S JOHNSON CO, Massac, IL

Built 2023 Load: 34.7 t ADT: 10,600

TR 3

Good

Over: CLIFTY CREEK

2.76 MI E US 45, Massac, IL

Built 1993 Load: 35.0 t ADT: 50

TR-142 Mt.Sterling

Good

Over: Trib. to Crenshaw Cr

4 MI E OF BROOKPORT, Massac, IL

Built 2019 Load: 35.3 t ADT: 225

NEW COLUMBIA ROAD

Good

Over: GURLEY DITCH

3 MI N ROUND KNOB, Massac, IL

Built 2014 Load: 35.6 t ADT: 650

FAS 956

Good

Over: DRY RIDGE DITCH

3.6 MI E US 45, Massac, IL

Built 1989 Load: 36.0 t ADT: 225

JONESBORO ROAD

Good

Over: TRIB Q DITCH EAST BR

1050N-0600E, Massac, IL

Built 1991 Load: 36.3 t ADT: 1,200

TR 123

Good

Over: UNNAMED CREEK

1.25 MI E FAS 929, Massac, IL

Built 1992 Load: 36.3 t ADT: 800

JONESBORO ROAD

Good

Over: TRIB Q DITCH WEST BR

1050N-0600E, Massac, IL

Built 1991 Load: 36.6 t ADT: 1,200
Data sourced from official public datasets. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.