Vermilion County, IL

515 public highway bridges

Vermilion County Bridge Snapshot

According to the Federal Highway Administration's 2024 National Bridge Inventory, Vermilion County, Illinois contains 515 public highway bridges. Roughly 24.9% are rated “Good,” 57.9% “Fair,” and 5.2% “Poor.” Poor means the lowest applicable deck, superstructure, substructure, or culvert rating is 4 or below on the 0–9 NBI scale. It is a condition category, not a live safety or closure decision.

Responsible agencies inspect covered bridges on risk-based intervals under current NBIS rules and submit inventory data to FHWA annually. The list below shows every NBI-tracked bridge in the county. Use the “Sort by” controls to change the ordering, and click any row for its reported inspection date, traffic count, and condition fields.

Source: FHWA National Bridge Inventory. See methodology for full definitions.

515
Total Bridges
24.9%
Good
57.9%
Fair
5.2%
Poor Condition

Condition Distribution

Good
24.9% (128)
Fair
57.9% (298)
Poor
5.2% (27)

All Bridges (515)

TR 39

Fair

Over: N FORK VERMILION RIV

1 MI NW ROSSVILLE, Vermilion, IL

Built 1982 Load: 32.4 t ADT: 150

TR 8

Fair

Over: KNIGHTS CREEK

5 MI NW FITHIAN, Vermilion, IL

Built 1982 Load: 32.4 t ADT: 50

TR 135

Fair

Over: STREAM

6 MI SW POTOMAC, Vermilion, IL

Built 1982 Load: 32.4 t ADT: 50

TR 8

Fair

Over: TRIB STONY CREEK

2 MI SW HOPE, Vermilion, IL

Built 1982 Load: 32.4 t ADT: 50

TR 24

Fair

Over: OLIVE BRANCH

4 MI W OF FAIRMOUNT, Vermilion, IL

Built 1988 Load: 32.4 t ADT: 50

KING ST(MS 8190)

Fair

Over: GRAPE CREEK

CITY OF TILTON, Vermilion, IL

Built 1982 Load: 32.4 t ADT: 800

TR 174

Fair

Over: BEAN CREEK

2 MI NE POTOMAC, Vermilion, IL

Built 1983 Load: 32.4 t ADT: 50

TR 95

Fair

Over: STREAM

1.5 MI NE ALVIN, Vermilion, IL

Built 1983 Load: 32.4 t ADT: 50

TR 70 A

Fair

Over: BLUEGRASS CREEK BR

3 MI SE REILLY, Vermilion, IL

Built 1983 Load: 32.4 t ADT: 50

TR 85

Fair

Over: BR BLUEGRASS CREEK

3 MI NW POTOMAC, Vermilion, IL

Built 1983 Load: 32.4 t ADT: 25

TR 60

Fair

Over: WHISKY CREEK

2 MI NE RANKIN, Vermilion, IL

Built 1983 Load: 32.4 t ADT: 50

TR 61

Fair

Over: BLUEGRASS CREEK BR

4 MI N POTOMAC, Vermilion, IL

Built 1983 Load: 32.4 t ADT: 25

TR 400 A

Fair

Over: LICK CREEK

2.5 MI S DAN AIRPORT, Vermilion, IL

Built 1983 Load: 32.4 t ADT: 1,850

TR 400 A

Fair

Over: LICK CREEK

NE DANVILLE, Vermilion, IL

Built 1984 Load: 32.4 t ADT: 1,850

TR 81 A

Fair

Over: BEAN CREEK

2 MI NW OF HENNING, Vermilion, IL

Built 1985 Load: 32.4 t ADT: 50

TR 457

Fair

Over: STREAM

1.5 MI SE INDIANOLA, Vermilion, IL

Built 1984 Load: 32.4 t ADT: 50

TR 425

Fair

Over: SWANK CREEK

1.8 MI NW INDIANOLA, Vermilion, IL

Built 1984 Load: 32.4 t ADT: 35

TR 62

Fair

Over: BLUEGRASS CREEK

2.0 MI NE ELLIS, Vermilion, IL

Built 1984 Load: 32.4 t ADT: 50

TR 33

Fair

Over: N FORK VERMILION RIV

3 MI S OF HOOPESTON, Vermilion, IL

Built 1984 Load: 32.4 t ADT: 100

TR 70 A

Fair

Over: BLUEGRASS CREEK

2.5 MI NW POTOMAC, Vermilion, IL

Built 1985 Load: 32.4 t ADT: 50

TR 61

Fair

Over: BLUEGRASS CREEK

2 MI E OF ELLIS, Vermilion, IL

Built 1986 Load: 32.4 t ADT: 25

CH 21(FAS 497)

Fair

Over: MIDDLE FK VERM RIV

2.0 MI NE COLLISON, Vermilion, IL

Built 1986 Load: 32.4 t ADT: 275

FAS 502(TR 183)

Fair

Over: STREAM

6 MI NW OF FITHIAN, Vermilion, IL

Built 1988 Load: 32.4 t ADT: 275

TR 13

Fair

Over: FOUNTAIN CREEK

2 MI SW EAST LYNN, Vermilion, IL

Built 1985 Load: 32.4 t ADT: 20

TR 41

Fair

Over: MIDDLE BRANCH

5 MI NE ROSSVILLE, Vermilion, IL

Built 1985 Load: 32.4 t ADT: 50

TR 143

Fair

Over: STREAM

2.5 MI NW COLLISON, Vermilion, IL

Built 1985 Load: 32.4 t ADT: 50

TR 334

Fair

Over: MDL BR N FK VERM RIV

2 MI NW ALVIN, Vermilion, IL

Built 1986 Load: 32.4 t ADT: 75

TR 222 A

Fair

Over: FAIRVIEW CREEK

2 MI NW VERM GROVE, Vermilion, IL

Built 1986 Load: 32.4 t ADT: 50

TR 266

Fair

Over: FAIRVIEW DRAIN DIT

2 MI W GEORGETOWN, Vermilion, IL

Built 1986 Load: 32.4 t ADT: 75

TR 383

Fair

Over: FAIRVIEW DRAIN DIT

2.5 MI NW GEO'TOWN, Vermilion, IL

Built 1986 Load: 32.4 t ADT: 35

TR 463

Fair

Over: LITTLE VERMILLION R

1.5 MI E SIDELL, Vermilion, IL

Built 1986 Load: 32.4 t ADT: 150

TR 288

Fair

Over: N FK VERMILION RIV

1 MI S HOOPSTON, Vermilion, IL

Built 1986 Load: 32.4 t ADT: 325

TR 297

Fair

Over: BUTLER BRANCH

2.6 MI N OF CATLIN, Vermilion, IL

Built 1988 Load: 32.4 t ADT: 150

TR 5 C

Fair

Over: FOUNTAIN CREEK

1 MI NE EAST LYNN, Vermilion, IL

Built 1987 Load: 32.4 t ADT: 125

TR 5 C

Fair

Over: STREAM

0.5 MI E OF RANKIN, Vermilion, IL

Built 1987 Load: 32.4 t ADT: 75

TR 492 A

Fair

Over: STREAM

7 MI NE DANVILLE, Vermilion, IL

Built 1986 Load: 32.4 t ADT: 75

TR 14

Fair

Over: OLIVE BRANCH

5 MI SW FAIRMONT, Vermilion, IL

Built 1986 Load: 32.4 t ADT: 50

TR 131

Fair

Over: STREAM

3 MI S ARMSTRONG, Vermilion, IL

Built 1986 Load: 32.4 t ADT: 50

TR 65

Fair

Over: STREAM

3 MI SW ROSSVILLE, Vermilion, IL

Built 1987 Load: 32.4 t ADT: 50

TR 221

Fair

Over: STONY CREEK

3 MI NW FITHIAN, Vermilion, IL

Built 1986 Load: 32.4 t ADT: 50

TR 26

Fair

Over: LITTLE VERMILION RIV

3 MI NE OF ALLERTON, Vermilion, IL

Built 1987 Load: 32.4 t ADT: 50

TR 14

Fair

Over: LITTLE VERMILION RIV

2 MI NE OF ALLERTON, Vermilion, IL

Built 1987 Load: 32.4 t ADT: 50

TR 143

Fair

Over: KNIGHT'S BRANCH

3.7 MI W OF COLLISON, Vermilion, IL

Built 1987 Load: 32.4 t ADT: 50

TR 393

Fair

Over: FAIRVIEW DRAINAGE DI

2 MI W GEORGETOWN, Vermilion, IL

Built 1995 Load: 32.4 t ADT: 50

TR 239

Fair

Over: STREAM

3.5 MI E OF DANVILLE, Vermilion, IL

Built 1987 Load: 32.4 t ADT: 50

TR 270

Fair

Over: FAIRVIEW DRAINAGE DI

2 MI W GEORGETOWN, Vermilion, IL

Built 1995 Load: 32.4 t ADT: 50

TR 445

Fair

Over: BAUM CREEK

1.5 MI N OF SIDELL, Vermilion, IL

Built 1988 Load: 32.4 t ADT: 20

MICHIGAN(FAU 7047)

Fair

Over: LICK CREEK

CITY OF DANVILLE-NE, Vermilion, IL

Built 1988 Load: 32.4 t ADT: 1,850

TR 211

Fair

Over: STONY CREEK TRIB

4.5 MI NW OF FITHIAN, Vermilion, IL

Built 1988 Load: 32.4 t ADT: 50

TR 14

Fair

Over: DRAINAGE DITCH

5.2 MI SW FAIRMOUNT, Vermilion, IL

Built 1988 Load: 32.4 t ADT: 50
Data sourced from official public datasets. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.