Pierce County, NE

177 public highway bridges

Pierce County Bridge Snapshot

Pierce County, Nebraska contains 177 public highway bridges in the FHWA National Bridge Inventory. Roughly 39% are rated “Good,” 47.5% “Fair,” 13.6% “Poor,” and 13.6% are classified as structurally deficient — the federal designation for spans whose deck, superstructure, or substructure has been rated 4 or below on the 0–9 NBI scale. Structurally deficient does not mean unsafe to cross; it means the bridge is on the priority list for repair or replacement.

Inspections in NE are conducted by certified engineers from the state Department of Transportation on a 24-month cycle, and results are reported back to the FHWA each spring. The list below shows every NBI-tracked bridge in the county, sorted by inventory load rating. Use the “Sort by” controls to surface the lowest-rated spans first, and click any row for full inspection history, traffic counts, and condition trends.

Source: FHWA National Bridge Inventory. See methodology for full definitions.

177
Total Bridges
39%
Good
13.6%
Poor
13.6%
Structurally Deficient

Condition Distribution

Good
39% (69)
Fair
47.5% (84)
Poor
13.6% (24)
SD
13.6% (24)

All Bridges (177)

US81

Good

Over: STREAM

8N NORFOLK, Pierce, NE

Built 1938 Load: 22.0 t ADT: 4,615

US81

Good

Over: N FK ELKHORN RIVER TRIB

8N NORFOLK, Pierce, NE

Built 1938 Load: 22.0 t ADT: 4,615

US81

Good

Over: N FK ELKHORN RIVER TRIB

11N NORFOLK, Pierce, NE

Built 1938 Load: 22.0 t ADT: 4,615

N121

Good

Over: STREAM

1S OSMOND, Pierce, NE

Built 1947 Load: 22.0 t ADT: 1,080

FAS 2860

Good

Over: YANKTON SLOUGH

NJCT US81/N98 3N 2.2E, Pierce, NE

Built 2006 Load: 24.0 t ADT: 95

FAS 2923

Good

Over: N FK ELKHORN RIVER

1.5N OF PIERCE, Pierce, NE

Built 1986 Load: 24.0 t ADT: 470

552 AVE

Good

Over: ELKHORN RIVER N FK TRIB

2NE OF PIERCE, Pierce, NE

Built 2021 Load: 24.0 t ADT: 50

COLL 7712

Good

Over: W BR N FK ELKHORN RIVER

2N 3W OF OSMOND, Pierce, NE

Built 1999 Load: 25.0 t ADT: 50

COUNTY HIGHWAY

Good

Over: YANKTON SLOUGH

2N 1.5E OF PIERCE, Pierce, NE

Built 1910 Load: 25.0 t ADT: 25

N13

Good

Over: PLEASANT VALLEY DRAIN

2NW HADAR, Pierce, NE

Built 1975 Load: 27.0 t ADT: 4,825

N13

Good

Over: WILLOW CREEK

.2SE PIERCE, Pierce, NE

Built 2004 Load: 28.0 t ADT: 4,825

US20

Good

Over: YANKTON SLOUGH

3W RANDOLPH, Pierce, NE

Built 1955 Load: 28.0 t ADT: 2,635

COUNTY HIGHWAY

Good

Over: WILLOW CREEK

S EDGE OF PIERCE, Pierce, NE

Built 1994 Load: 30.0 t ADT: 100

FAS 2600

Good

Over: WILLOW CREEK

JCT US20/N13 1.4E 10S, Pierce, NE

Built 1978 Load: 32.0 t ADT: 185

FARM DRIVE

Good

Over: E. BRANCH N. FORK ELKHOR

1.7E OSMOND, Pierce, NE

Built 2013 Load: 32.0 t ADT: 2,345

COUNTY HIGHWAY

Good

Over: DRY CREEK

.7E .7S OF PLAINVIEW, Pierce, NE

Built 2007 Load: 33.0 t ADT: 170

COUNTY HIGHWAY

Good

Over: DRY CREEK

2N 3W OF FOSTER, Pierce, NE

Built 1991 Load: 33.0 t ADT: 20

COUNTY HIGHWAY

Good

Over: DRY CREEK

1.5NW OF FOSTER, Pierce, NE

Built 2008 Load: 33.0 t ADT: 10

FAS 2860

Good

Over: STREAM

.8E 5N PIERCE, Pierce, NE

Built 1981 Load: 33.0 t ADT: 95

COUNTY HIGHWAY

Good

Over: STREAM

4N 6E OF PIERCE, Pierce, NE

Built 2011 Load: 33.0 t ADT: 15

COUNTY HIGHWAY

Good

Over: DRAINAGE

5S .3W PIERCE, Pierce, NE

Built 1995 Load: 33.0 t ADT: 50

US81

Good

Over: STREAM

4N NORFOLK, Pierce, NE

Built 2003 Load: 33.0 t ADT: 8,565

COUNTY HIGHWAY

Good

Over: DRY CREEK

1SE OF PLAINVIEW, Pierce, NE

Built 2015 Load: 35.0 t ADT: 30

COUNTY HIGHWAY

Good

Over: N FK ELKHORN RIVER

4S OF OSMOND, Pierce, NE

Built 1991 Load: 35.0 t ADT: 35

859 ROAD

Good

Over: N FK ELKHORN RIVER

JCT N13/N121 2.9N .9E, Pierce, NE

Built 2023 Load: 35.0 t ADT: 55

COUNTY HIGHWAY

Good

Over: N FK ELKHORN RIVER

3S 2.5E OF PIERCE, Pierce, NE

Built 1994 Load: 35.0 t ADT: 40

N13

Good

Over: N FK ELKHORN RIVER

.6E HADAR, Pierce, NE

Built 2020 Load: 35.0 t ADT: 3,970

FAS 2895

Good

Over: WILLOW CREEK

JCT N13/N98 10.7W .5S, Pierce, NE

Built 1998 Load: 36.0 t ADT: 80

542ND RD

Good

Over: DRY CREEK

0.7NW OF FOSTER, Pierce, NE

Built 2021 Load: 36.0 t ADT: 40

862ND ROAD

Good

Over: YANKTON SLOUGH

4S 1.5E OF MCLEAN, Pierce, NE

Built 2021 Load: 36.0 t ADT: 25

543 AVE

Good

Over: WILLOW CREEK

6.5S OF FOSTER, Pierce, NE

Built 2023 Load: 36.0 t ADT: 60

554TH AVE

Good

Over: YANKTON SLOUGH

4S 1E OF MCLEAN, Pierce, NE

Built 2021 Load: 36.0 t ADT: 25

558TH AVE

Good

Over: MIDDLE LOGAN CREEK

_, Pierce, NE

Built 2023 Load: 39.0 t ADT: 470

COUNTY HIGHWAY

Good

Over: N FK ELKHORN RIVER

.5W 2.5N OF HADAR, Pierce, NE

Built 2000 Load: 40.0 t ADT: 25

N98

Good

Over: STREAM

3E PIERCE, Pierce, NE

Built 1956 Load: 40.0 t ADT: 640

COUNTY HIGHWAY

Good

Over: STREAM

3.7E 2N OF HADAR, Pierce, NE

Built 2000 Load: 42.0 t ADT: 35

COUNTY HIGHWAY

Good

Over: N FK ELKHORN RIVER

1N .2E OF PIERCE, Pierce, NE

Built 2004 Load: 42.0 t ADT: 50

COUNTY HIGHWAY

Good

Over: YANKTON SLOUGH

5.5N 3E OF PIERCE, Pierce, NE

Built 2024 Load: 42.0 t ADT: 25

N121

Good

Over: N FK ELKHORN RIVER

3S OSMOND, Pierce, NE

Built 2014 Load: 42.0 t ADT: 1,080

870 ROAD

Good

Over: STREAM

11W N121 KNOX CL, Pierce, NE

Built 2016 Load: 44.0 t ADT: 30

US81

Good

Over: YANKTON SLOUGH TRIB

JCT US81/US20 8S, Pierce, NE

Built 2022 Load: 44.0 t ADT: 4,245

US81

Good

Over: YANKTON SLOUGH

JCT US81/US20 2S, Pierce, NE

Built 2022 Load: 44.0 t ADT: 4,245

N98

Good

Over: N FK ELKHORN RIVER TRIB

5E PIERCE, Pierce, NE

Built 2004 Load: 44.0 t ADT: 640

FAS 2935

Good

Over: WILLOW CREEK

JCT US20/N13 .3E 9.2S, Pierce, NE

Built 2016 Load: 45.0 t ADT: 160

536TH AVE

Good

Over: DRY CREEK TRIB

JCT US20/N13 .3E 1.2S, Pierce, NE

Built 2021 Load: 45.0 t ADT: 310

COUNTY HIGHWAY

Good

Over: N FK ELKHORN RIVER

2N OF OSMOND, Pierce, NE

Built 2011 Load: 45.0 t ADT: 10

COUNTY HIGHWAY

Good

Over: N FK ELKHORN RIVER

4.5N 1.2E OF OSMOND, Pierce, NE

Built 2013 Load: 45.0 t ADT: 55

557TH AVE

Good

Over: ELKHORN RIVER N FK TRIB

6.5E .2N OF PIERCE, Pierce, NE

Built 2000 Load: 47.0 t ADT: 10

537TH RD

Good

Over: WILLOW CREEK

9.5S OF PLAINVIEW, Pierce, NE

Built 2019 Load: 48.0 t ADT: 25

US20/N121

Good

Over: N FK ELKHORN RIVER

1E OSMOND, Pierce, NE

Built 2004 Load: 48.0 t ADT: 2,345

Related

Data sourced from official U.S. government datasets. See our methodology for details. Retrieved and formatted by PlainBridges Editorial