Holmes County, OH

208 public highway bridges

Holmes County Bridge Snapshot

According to the Federal Highway Administration's 2024 National Bridge Inventory, Holmes County, Ohio contains 208 public highway bridges. Roughly 43.3% are rated “Good,” 53.8% “Fair,” and 2.9% “Poor.” Poor means the lowest applicable deck, superstructure, substructure, or culvert rating is 4 or below on the 0–9 NBI scale. It is a condition category, not a live safety or closure decision.

Responsible agencies inspect covered bridges on risk-based intervals under current NBIS rules and submit inventory data to FHWA annually. The list below shows every NBI-tracked bridge in the county. Use the “Sort by” controls to change the ordering, and click any row for its reported inspection date, traffic count, and condition fields.

Source: FHWA National Bridge Inventory. See methodology for full definitions.

208
Total Bridges
43.3%
Good
53.8%
Fair
2.9%
Poor Condition

Condition Distribution

Good
43.3% (90)
Fair
53.8% (112)
Poor
2.9% (6)

All Bridges (208)

COUNTY ROAD 22

Fair

Over: PLUM RUN

0.02 MI. N OF JCT. CR 385, Holmes, OH

Built 1950 Load: 53.8 t ADT: 186

COUNTY ROAD 1

Fair

Over: RUSH RUN

0.82 MI. WEST OF SR 83, Holmes, OH

Built 2004 Load: 54.1 t ADT: 746

TOWNSHIP ROAD 361

Fair

Over: DOUGHTY CREEK

0.25 MI. WEST OF TR 362, Holmes, OH

Built 1993 Load: 54.8 t ADT: 96

COUNTY ROAD 200

Fair

Over: CRABAPPLE CREEK

0.39 MILES WEST OF CR-186, Holmes, OH

Built 1957 Load: 55.4 t ADT: 362

COUNTY ROAD 27

Fair

Over: SOUTH BRANCH WOLF CREEK

0.19 MI SOUTH OF US 62, Holmes, OH

Built 1930 Load: 57.7 t ADT: 385

COUNTY ROAD 51

Fair

Over: PAINT CREEK

1.01 MI. NORTH OF SR 39, Holmes, OH

Built 1997 Load: 58.3 t ADT: 486

COUNTY ROAD 160

Fair

Over: MIDDLE FORK SUGAR CREEK

0.17 MI. EAST OF TR 656, Holmes, OH

Built 1938 Load: 64.8 t ADT: 1,466

COUNTY ROAD 120

Fair

Over: DOUGHTY CREEK

0.21 MI. EAST OF SR 557, Holmes, OH

Built 1997 Load: 74.5 t ADT: 444

TOWNSHIP ROAD 355

Fair

Over: DOUGHTY CREEK

0.05 Miles West of SR 557, Holmes, OH

Built 2016 Load: 74.5 t ADT: 50

TOWNSHIP ROAD 458

Fair

Over: PLUM RUN

0.31 MI. EAST OF TR 457, Holmes, OH

Built 1968 Load: 75.2 t ADT: 324

COUNTY ROAD 349

Fair

Over: DRY RUN

0.09 MI. SOUTH OF TR 323, Holmes, OH

Built 1953 Load: 85.5 t ADT: 277

TOWNSHIP ROAD 521

Fair

Over: TRIBUTARY OF PAINT CREEK

0.85 MILESI EAST OF CR 51, Holmes, OH

Built 2006 Load: 94.3 t ADT: 96

TOWNSHIP ROAD 652

Good

Over: TRIB M FORK SUGAR CREEK

0.01 MI. NORTH OF TR 617, Holmes, OH

Built 1954 Load: 9.7 t ADT: 235

COUNTY ROAD 22

Good

Over: LAKE FORK MOHICAN RIVER

0.15 MI SOUTH OF CR 385, Holmes, OH

Built 2016 Load: 16.2 t ADT: 229

US 62

Good

Over: KILLBUCK CR

0.02 MI E OF JCT SR 520, Holmes, OH

Built 1960 Load: 19.4 t ADT: 2,245

TOWNSHIP ROAD 601

Good

Over: TRIBUTARY MARTINS CREEK

0.17 MILES NORTH OF CR189, Holmes, OH

Built 1963 Load: 19.4 t ADT: 338

TOWNSHIP ROAD 256

Good

Over: SHRIMPLIN CREEK

0.07 MI. WEST OF TR 257, Holmes, OH

Built 1932 Load: 19.4 t ADT: 96

TOWNSHIP ROAD 502

Good

Over: TRIBUTARY OF PAINT CREEK

0.14 MI. EAST OF TR 519, Holmes, OH

Built 1900 Load: 19.4 t ADT: 96

TOWNSHIP ROAD 5

Good

Over: NEGRO RUN

0.15 MI. NORTH OF US 62, Holmes, OH

Built 1983 Load: 22.7 t ADT: 96

TOWNSHIP ROAD 208

Good

Over: MOHICAN RIVER

0.08 MI. SOUTH OF CR 23, Holmes, OH

Built 1974 Load: 22.7 t ADT: 39

COUNTY ROAD 320

Good

Over: COFFEE RUN

0.32 MI. WEST OF CR 333, Holmes, OH

Built 2009 Load: 23.0 t ADT: 618

SR 520

Good

Over: BRANCH OF BLACK CREEK

3.38 MI W OF JCT US 62, Holmes, OH

Built 1985 Load: 25.9 t ADT: 468

TOWNSHIP ROAD 551

Good

Over: TRIBUTARY OF PAINT CREEK

0.10 MI. NORTH OF TR 506, Holmes, OH

Built 1928 Load: 25.9 t ADT: 96

TOWNSHIP ROAD 17

Good

Over: TRIBUTARY MOHICAN RIVER

0.87 MI. W OF JCT. CR 75, Holmes, OH

Built 1931 Load: 27.9 t ADT: 96

SR 93

Good

Over: SO FORK SUGAR CR

0.1 MI S OF S.R. 643, Holmes, OH

Built 1947 Load: 28.8 t ADT: 2,850

STATE ROUTE 643

Good

Over: S.FORK SUGAR CR.

0.17 MI.W.OF SR 557, Holmes, OH

Built 1998 Load: 29.2 t ADT: 898

SR 39

Good

Over: KILLBUCK CR OVERFLOW

5.33 MI E OF SR 754, Holmes, OH

Built 1953 Load: 29.8 t ADT: 9,171

COUNTY ROAD 58

Good

Over: MILITARY RUN

0.84 MILES NORTH OF CR 19, Holmes, OH

Built 2017 Load: 30.8 t ADT: 600

TOWNSHIP ROAD 76

Good

Over: WOLF CREEK

0.20 MI. S OF JCT. US 62, Holmes, OH

Built 2011 Load: 30.8 t ADT: 209

COUNTY ROAD 53

Good

Over: LEPLEY RUN

0.04 N OF COS CO LINE, Holmes, OH

Built 2023 Load: 30.8 t ADT: 211

SR 3

Good

Over: PLUM RUN

2.98 MI S OF SR 179, Holmes, OH

Built 1991 Load: 31.4 t ADT: 2,639

SR 83

Good

Over: DOUGHTY CREEK

0.21 MI N OF COSHOCTON CO, Holmes, OH

Built 1965 Load: 31.4 t ADT: 2,871

SR 515

Good

Over: GOOSE CREEK

0.78 MI NORTH OF JCT SR39, Holmes, OH

Built 1991 Load: 31.4 t ADT: 2,474

SR 520

Good

Over: LOCUST LICK CR

6.44 MI E OF JCT SR 514, Holmes, OH

Built 2013 Load: 31.8 t ADT: 702

TOWNSHIP ROAD 525

Good

Over: TRIBUTART OF PAINT CREEK

0.28 miles N of TR 506, Holmes, OH

Built 2015 Load: 31.8 t ADT: 50

TOWNSHIP ROAD 221

Good

Over: LOCUST LICK RUN

0.06 MILES WEST OF CR 51, Holmes, OH

Built 2015 Load: 32.1 t ADT: 25

SR 39

Good

Over: LITTLE PAINT CREEK

2.15 MI E OF SR 514, Holmes, OH

Built 1983 Load: 32.4 t ADT: 3,489

S.R.39

Good

Over: KILLBUCK CR OVERFLOW

0.37 MI W OF US62 & SR83, Holmes, OH

Built 2000 Load: 32.4 t ADT: 9,171

US 62

Good

Over: SAND RUN

1.53 MI W OF JCT SR 39, Holmes, OH

Built 2017 Load: 32.4 t ADT: 9,000

US 62 & SR 83

Good

Over: BR KILLBUCK CR

0.52 MI W OF JCT SR 39, Holmes, OH

Built 1987 Load: 32.4 t ADT: 12,830

US 62 & SR 39

Good

Over: DOUGHTY CREEK

0.35 MI E OF JCT SR 557, Holmes, OH

Built 1958 Load: 32.4 t ADT: 9,790

SR 83

Good

Over: TRAIL BIKE/BUGGY PATH

SR 00083, Holmes, OH

Built 2006 Load: 32.4 t ADT: 6,022

STATE ROUTE 515

Good

Over: HOCHSTETLER RUN

2.32 MI N.OF JCT SR 39, Holmes, OH

Built 1996 Load: 32.4 t ADT: 2,474

CR 23

Good

Over: MOHICAN RIVER

0.158 MI S OF TR 451, Holmes, OH

Built 2023 Load: 32.7 t ADT: 1,500

TOWNSHIP ROAD 264

Good

Over: TRIB OF PAINT CREEK

0.15 MI SOUTH OF TR 262, Holmes, OH

Built 2023 Load: 32.7 t ADT: 100

SR 39

Good

Over: SAPPS RUN

1.33 MI W OF US 62/SR 83, Holmes, OH

Built 1965 Load: 33.4 t ADT: 6,649

US 62

Good

Over: BR KILLBUCK CR

0.11 MI. W. OF JCT SR 83, Holmes, OH

Built 1994 Load: 34.0 t ADT: 4,416

TOWNSHIP ROAD 310

Good

Over: UPPER SAND RUN

0.48 miles NE of CR 68, Holmes, OH

Built 2015 Load: 35.3 t ADT: 350

U.S.62

Good

Over: NEGRO RUN

2.93 MI.W.OF SR 206, Holmes, OH

Built 2003 Load: 35.6 t ADT: 1,134

SR 62

Good

Over: KILLBUCK CREEK OVERFLOW

0.08 MILES W OF JCT SR 7, Holmes, OH

Built 2007 Load: 35.6 t ADT: 1,996
Data sourced from official public datasets. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.