Alfalfa County, OK

386 public highway bridges

Alfalfa County Bridge Snapshot

According to the Federal Highway Administration's 2024 National Bridge Inventory, Alfalfa County, Oklahoma contains 386 public highway bridges. Roughly 27.5% are rated “Good,” 66.1% “Fair,” and 6.5% “Poor.” Poor means the lowest applicable deck, superstructure, substructure, or culvert rating is 4 or below on the 0–9 NBI scale. It is a condition category, not a live safety or closure decision.

Responsible agencies inspect covered bridges on risk-based intervals under current NBIS rules and submit inventory data to FHWA annually. The list below shows every NBI-tracked bridge in the county. Use the “Sort by” controls to change the ordering, and click any row for its reported inspection date, traffic count, and condition fields.

Source: FHWA National Bridge Inventory. See methodology for full definitions.

386
Total Bridges
27.5%
Good
66.1%
Fair
6.5%
Poor Condition

Condition Distribution

Good
27.5% (106)
Fair
66.1% (255)
Poor
6.5% (25)

All Bridges (386)

E0360

Fair

Over: CREEK

3S 2E OF GOLTRY, Alfalfa, OK

Built 2017 Load: 71.7 t ADT: 100

E0350 (0222C)

Fair

Over: CREEK

0.9 MI W OF ALINE, Alfalfa, OK

Built 1965 Load: 72.6 t ADT: 100

N2560

Fair

Over: CREEK

3.5N OF ALINE, Alfalfa, OK

Built 2015 Load: 82.6 t ADT: 100

N2600

Fair

Over: CREEK

1W 1.5N OF CHEROKEE, Alfalfa, OK

Built 2016 Load: 86.2 t ADT: 100

S.H. 58

Fair

Over: SPRING CREEK

5.3 MI.N.OF JCT.SH45, Alfalfa, OK

Built 1953 Load: 90.4 t ADT: 690

E0180 (FAS 0227)

Good

Over: CREEK

1E OF SH 58, Alfalfa, OK

Built 1938 Load: 19.1 t ADT: 100

N2550

Good

Over: CREEK

6W .9S OF CHEROKEE, Alfalfa, OK

Built 1938 Load: 19.1 t ADT: 25

E0060

Good

Over: STINK CREEK TRIB.

2N 1.8E OF BURLINGTON, Alfalfa, OK

Built 1940 Load: 19.1 t ADT: 24

N2550 (FAS 0227)

Good

Over: COTTONWOOD CREEK

8.6N OF CARMEN, Alfalfa, OK

Built 1947 Load: 19.1 t ADT: 25

E0180 (FAS 0227)

Good

Over: CREEK

3.7W OF OHIO ST; CHER., Alfalfa, OK

Built 1947 Load: 19.1 t ADT: 75

E0160

Good

Over: SALT FORK OF ARK. TRIB.

5.5W 1S OF INGERSOLL, Alfalfa, OK

Built 1948 Load: 19.1 t ADT: 100

E0180 (0214C)

Good

Over: CREEK

5W OF OHIO ST; CHEROKEE, Alfalfa, OK

Built 1950 Load: 19.1 t ADT: 100

E0060

Good

Over: BARROW DRAIN

2N OF SH 8/11 JCT., Alfalfa, OK

Built 1962 Load: 19.1 t ADT: 100

E0060

Good

Over: BARROW DRAIN

2N OF SH 8/11 JCT., Alfalfa, OK

Built 1962 Load: 19.1 t ADT: 100

E0230 (FAS 0213)

Good

Over: CREEK

1.5W OF LAMBERT, Alfalfa, OK

Built 1962 Load: 19.1 t ADT: 100

E0120 (FAS 0216)

Good

Over: CREEK

1.3 M. E OF COUNTY LINE, Alfalfa, OK

Built 1965 Load: 19.1 t ADT: 25

E0120 (FAS 0216)

Good

Over: CREEK

4S 3.3W OF BURLINGTON, Alfalfa, OK

Built 1972 Load: 19.1 t ADT: 100

E0120 (FAS 0216)

Good

Over: CREEK

.3E OF COUNTY LINE, Alfalfa, OK

Built 1974 Load: 19.1 t ADT: 25

E0270

Good

Over: TWIN SPRINGS CREEK

3S 3.6W OF JET, Alfalfa, OK

Built 1986 Load: 19.1 t ADT: 100

N2590

Good

Over: COTTONWOOD CREEK TRIB.

2W .1S OF CHEROKEE, Alfalfa, OK

Built 1987 Load: 19.1 t ADT: 25

N2580 (0242C)

Good

Over: CREEK

1W 1.1N OF INGERSOLL, Alfalfa, OK

Built 1998 Load: 19.1 t ADT: 50

E0270

Good

Over: SPRING CREEK

3S 4.9W OF JET, Alfalfa, OK

Built 2002 Load: 19.1 t ADT: 100

E0270

Good

Over: EAST CLAY CREEK

NW OF HELENA;3S OF US64, Alfalfa, OK

Built 2005 Load: 19.1 t ADT: 25

E0290

Good

Over: EAGLE CHIEF CREEK TRIB.

1.5NW CARMEN; N OF SH45, Alfalfa, OK

Built 2004 Load: 19.1 t ADT: 100

N2710

Good

Over: WAGON CREEK TRIB.

2.2N S.H45 1.0W GOULTRY, Alfalfa, OK

Built 2008 Load: 19.1 t ADT: 100

E0020

Good

Over: RUSH CREEK TRIB.

5.5E OF S.H. 58, Alfalfa, OK

Built 2011 Load: 19.1 t ADT: 100

N2520

Good

Over: LITTLE DRIFTWOOD CREEK

2W 2.5N OF SH8/SH11 JCT, Alfalfa, OK

Built 2012 Load: 19.1 t ADT: 100

E0250

Good

Over: CREEK

5N 3.7W OF CARMEN, Alfalfa, OK

Built 2014 Load: 19.1 t ADT: 100

N2550 (FAS 0227)

Good

Over: COTTONWOOD CREEK

2.5W .6S OF LAMBERT, Alfalfa, OK

Built 2015 Load: 19.1 t ADT: 100

E0300 (FAS 0212)

Good

Over: EAST CLAY CREEK

7.6E OF CARMEN, Alfalfa, OK

Built 2022 Load: 19.1 t ADT: 25

E0300 (FAS 0212)

Good

Over: EAST CLAY CREEK

7.6E OF CARMEN, Alfalfa, OK

Built 2022 Load: 19.1 t ADT: 25

E0290

Good

Over: WEST CLAY CREEK

5S 1.9W OF U.S.64/S.H8, Alfalfa, OK

Built 2023 Load: 19.1 t ADT: 50

N2570

Good

Over: CREEK

1W 1.7S OF YEWED, Alfalfa, OK

Built 2022 Load: 19.1 t ADT: 25

E0100

Good

Over: STINK CREEK

.25 E OF SH11, Alfalfa, OK

Built 2022 Load: 19.1 t ADT: 100

N2580

Good

Over: WEST CLAY CREEK TRIB

3E 1.9N OF CARMEN, Alfalfa, OK

Built 2023 Load: 19.1 t ADT: 100

S.H. 8

Good

Over: CREEK

0.2 MI.N.JCT.US64, Alfalfa, OK

Built 1930 Load: 21.0 t ADT: 1,800

U.S. 64

Good

Over: LAMBERT CREEK

1.4 MI.N.JCT.SH8, Alfalfa, OK

Built 1975 Load: 22.7 t ADT: 2,700

S.H. 45

Good

Over: CREEK

3.7 MI.E. OF WOODS CL, Alfalfa, OK

Built 1955 Load: 23.0 t ADT: 1,100

N2617

Good

Over: COTTONWOOD CREEK

.6E S.H.64 .22N NEBRASKA, Alfalfa, OK

Built 1997 Load: 26.3 t ADT: 25

N2640

Good

Over: EAST CLAY CREEK

3SW OF CHEROKEE;4N US 64, Alfalfa, OK

Built 2004 Load: 27.2 t ADT: 100

N2620

Good

Over: WEST CLAY CREEK

1.0E2.7N OF S.H.8/U.S.64, Alfalfa, OK

Built 2010 Load: 27.2 t ADT: 50

S.H. 58

Good

Over: SALTY CREEK

1.9 MI.S.OF KANSAS SL, Alfalfa, OK

Built 1996 Load: 28.4 t ADT: 200

S.H. 11

Good

Over: CREEK

3.8E JCT U.S. 64, Alfalfa, OK

Built 2013 Load: 29.5 t ADT: 1,900

E0330

Good

Over: EAGLE CHIEF CREEK

2N .3E OF ALINE, Alfalfa, OK

Built 1988 Load: 29.9 t ADT: 100

E0120 (FAS 0216)

Good

Over: DRIFTWOOD CREEK

.7E OF SH 11, Alfalfa, OK

Built 1989 Load: 29.9 t ADT: 100

E0270

Good

Over: WAGON CREEK

3S 1.8E OF JET, Alfalfa, OK

Built 1990 Load: 29.9 t ADT: 30

N2530

Good

Over: EAGLE CHIEF CREEK

2W .9S OF CARMEN, Alfalfa, OK

Built 1990 Load: 29.9 t ADT: 100

E0230

Good

Over: EAST CLAY CREEK

4.5E OF YEWED, Alfalfa, OK

Built 1994 Load: 29.9 t ADT: 80

N2540

Good

Over: EAGLE CHIEF CREEK

1W 1.8S OF CARMEN, Alfalfa, OK

Built 1995 Load: 29.9 t ADT: 90

N2640

Good

Over: WEST CLAY CREEK

3SW CHEROKEE; 4N OF US 64, Alfalfa, OK

Built 2004 Load: 29.9 t ADT: 100
Data sourced from official public datasets. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.