Cameron County, TX

355 public highway bridges

Cameron County Bridge Snapshot

According to the Federal Highway Administration's 2024 National Bridge Inventory, Cameron County, Texas contains 355 public highway bridges. Roughly 41.4% are rated “Good,” 25.4% “Fair,” and 0.6% “Poor.” Poor means the lowest applicable deck, superstructure, substructure, or culvert rating is 4 or below on the 0–9 NBI scale. It is a condition category, not a live safety or closure decision.

Responsible agencies inspect covered bridges on risk-based intervals under current NBIS rules and submit inventory data to FHWA annually. The list below shows every NBI-tracked bridge in the county. Use the “Sort by” controls to change the ordering, and click any row for its reported inspection date, traffic count, and condition fields.

Source: FHWA National Bridge Inventory. See methodology for full definitions.

355
Total Bridges
41.4%
Good
25.4%
Fair
0.6%
Poor Condition

Condition Distribution

Good
41.4% (147)
Fair
25.4% (90)
Poor
0.6% (2)

All Bridges (355)

SH 48

Good

Over: BAHIA GRANDE

9.8 MI NE OF FM 511, Cameron, TX

Built 2007 Load: 32.7 t ADT: 6,931

SH 100

Good

Over: WILDLIFE CROSSING #3

6.38 MI E OF JCT FM 1847, Cameron, TX

Built 2018 Load: 32.7 t ADT: 6,894

SH 100

Good

Over: SHRIMP CHANNEL

0.85 MI E OF SH 48, Cameron, TX

Built 1997 Load: 32.7 t ADT: 23,061

SH 345

Good

Over: RESACA DE LOS FRESNOS

0.45 MI NE OF BUS 77, Cameron, TX

Built 2009 Load: 32.7 t ADT: 5,046

SH 345

Good

Over: RESACA DE LOS FRESNOS

1.7 MI NE OF BUS 77, Cameron, TX

Built 2009 Load: 32.7 t ADT: 5,046

SH 345

Good

Over: RESACA DE LOS FRESNOS

0.65 MI NE OF BUS 77, Cameron, TX

Built 2009 Load: 32.7 t ADT: 5,046

FM 2925

Good

Over: EAST LINE DRAIN

5.45 MI W OF FM 1847, Cameron, TX

Built 2013 Load: 32.7 t ADT: 671

FM 511

Good

Over: CCDD #1 MAIN DITCH

0.07 MI SE OF SH 48, Cameron, TX

Built 2003 Load: 32.7 t ADT: 8,926

SH 550 & FM 3248

Good

Over: DRAINAGE DITCH

6.8 MI SE OF US 77, Cameron, TX

Built 2009 Load: 32.7 t ADT: 2,600

SH 550 SB FR

Good

Over: Drainage Ditch #3

2.7 Mi E of US 77, Cameron, TX

Built 2009 Load: 32.7 t ADT: 2,600

SH 550 NB

Good

Over: Drainage Ditch #3

2.7 Mi E of US 77, Cameron, TX

Built 2009 Load: 32.7 t ADT: 13,400

SH 550 NB FR

Good

Over: Drainage Ditch #3

0.75 Mi W of FM 1847, Cameron, TX

Built 2010 Load: 32.7 t ADT: 10,900

SH 550 NB

Good

Over: UP RR #1

3.20 Mi SE of US 77, Cameron, TX

Built 2010 Load: 32.7 t ADT: 13,400

SH 550 SB

Good

Over: UP RR #1

3.20 Mi SE of US 77, Cameron, TX

Built 2010 Load: 32.7 t ADT: 13,400

SH 550 SB FR

Good

Over: UP RR #2 Spur

4.95 Mi SE of US 77, Cameron, TX

Built 2010 Load: 32.7 t ADT: 13,400

SH 550 NB FR

Good

Over: UP RR #2 Spur

4.85 Mi SE of US 83, Cameron, TX

Built 2010 Load: 32.7 t ADT: 13,400

FM 511

Good

Over: LOS FRESNOS MAIN CANAL

0.15 MI E OF US 77, Cameron, TX

Built 2009 Load: 32.7 t ADT: 5,283

FM 511

Good

Over: DRAINAGE DITCH

0.45 MI S OF SH 4, Cameron, TX

Built 2022 Load: 32.7 t ADT: 8,591

FM 507

Good

Over: DRAINAGE DITCH

0.70 MI N OF FM 508, Cameron, TX

Built 2003 Load: 32.7 t ADT: 869

FM 675

Good

Over: RIGHT HIGH LEVEL CANAL

1.85 MI NW OF FM 2520, Cameron, TX

Built 2007 Load: 32.7 t ADT: 816

FM 675

Good

Over: LOW LINE CANAL

1.45 MI NW OF FM 2520, Cameron, TX

Built 2007 Load: 32.7 t ADT: 816

FM 510

Good

Over: DRAINAGE DITCH

0.20 MI NE OF BU 77, Cameron, TX

Built 1975 Load: 32.7 t ADT: 6,175

FM 510

Good

Over: DRAINAGE DITCH

1.20 MI NE OF BU 77, Cameron, TX

Built 1975 Load: 32.7 t ADT: 6,175

FM 510

Good

Over: DRAINAGE DITCH

1.90 MI W OF FM 803, Cameron, TX

Built 1995 Load: 32.7 t ADT: 5,249

FM 510

Good

Over: RESACA DE LOS CUATES

0.50 MI E OF FM 2480, Cameron, TX

Built 1994 Load: 32.7 t ADT: 3,630

FM 1846

Good

Over: DRAINAGE DITCH

1.50 MI NE OF BU 77, Cameron, TX

Built 1989 Load: 32.7 t ADT: 6,197

FM 800

Good

Over: DRAINAGE DITCH

2.77 MI W OF FM 1479, Cameron, TX

Built 2003 Load: 32.7 t ADT: 1,355

FM 800

Good

Over: DRAINAGE DITCH

2.3 MI W OF FM 1479, Cameron, TX

Built 2003 Load: 32.7 t ADT: 1,355

FM 800

Good

Over: DRAINAGE DITCH

0.7 MI W OF FM 1479, Cameron, TX

Built 2003 Load: 32.7 t ADT: 1,624

FM 800

Good

Over: RESACA DEL RANCHO VIEJO

0.43 MI NW OF FM 2520, Cameron, TX

Built 2005 Load: 32.7 t ADT: 1,719

FM 800

Good

Over: ARROYO COLORADO

1.3 MI N OF FM 3067, Cameron, TX

Built 2012 Load: 32.7 t ADT: 1,313

LP 499

Good

Over: ARROYO COLORADO

0.50 MI S OF FM 106, Cameron, TX

Built 1978 Load: 32.7 t ADT: 21,135

FM 106

Good

Over: DRAINAGE DITCH

1.20 MI W OF FM 803, Cameron, TX

Built 2004 Load: 32.7 t ADT: 2,652

FM 803

Good

Over: RESACA DE LOS FRESNOS

0.50 MI N OF FM 510, Cameron, TX

Built 2006 Load: 32.7 t ADT: 2,141

FM 803

Good

Over: PRIMARY CHANNEL

1.0 MI NE OF US 83, Cameron, TX

Built 2018 Load: 32.7 t ADT: 12,916

FM 803

Good

Over: Share 14 Ditch

1.43 Miles NE of US 83, Cameron, TX

Built 2018 Load: 32.7 t ADT: 11,982

FM 802

Good

Over: RESACA CALMADA

0.625 MI E OF FM 1847, Cameron, TX

Built 2002 Load: 32.7 t ADT: 14,618

FM 802 WB

Good

Over: RESACA CALMADA

0.625 MI E OF FM 1847, Cameron, TX

Built 2002 Load: 32.7 t ADT: 14,392

FM 802

Good

Over: DRAINAGE DITCH

1.0 MI NW OF SH 45, Cameron, TX

Built 2002 Load: 32.7 t ADT: 15,775

FM 802

Good

Over: DRAINAGE DITCH

0.20 MI SE OF SH 48, Cameron, TX

Built 2002 Load: 32.7 t ADT: 18,806

FM 1420

Good

Over: DRAINAGE DITCH

1.0 MI N OF FM 508, Cameron, TX

Built 2002 Load: 32.7 t ADT: 654

FM 1419

Good

Over: RESACA DE LA PALMA

0.10 MI SE OF FM 511, Cameron, TX

Built 1996 Load: 32.7 t ADT: 23,596

FM 1419

Good

Over: DRAINAGE DITCH

0.40 MI S OF SH 4, Cameron, TX

Built 2004 Load: 32.7 t ADT: 943

FM 1847

Good

Over: DRAINAGE DITCH

1.90 MI S OF SH 100, Cameron, TX

Built 2009 Load: 32.7 t ADT: 13,974

FM 1847

Good

Over: UP RR

0.5 MI S OF FM 511, Cameron, TX

Built 1996 Load: 32.7 t ADT: 9,678

FM 509

Good

Over: ARROYO COLORADO

0.55 MI S OF FM 106, Cameron, TX

Built 1993 Load: 32.7 t ADT: 6,665

FM 509

Good

Over: HARLINGEN AIRPORT DRAIN

1.00 MI N OF FM 1595, Cameron, TX

Built 2001 Load: 32.7 t ADT: 1,086

SH 550

Good

Over: OUTFALL CHANNEL # 2

1.15 MI E OF FM 511, Cameron, TX

Built 2013 Load: 32.7 t ADT: 1,000

SH 550 SB FRTG RD

Good

Over: OUTFALL CHANNEL # 2

1.15 MI E OF FM 511, Cameron, TX

Built 2013 Load: 32.7 t ADT: 100

SH 550 NB FRTG RD

Good

Over: OUTFALL CHANNEL # 2

1.15 MI E OF FM 511, Cameron, TX

Built 2013 Load: 32.7 t ADT: 100
Data sourced from official public datasets. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.