Ellis County, TX

691 public highway bridges

Ellis County Bridge Snapshot

Ellis County, Texas contains 691 public highway bridges in the FHWA National Bridge Inventory. Roughly 42.3% are rated “Good,” 39.9% “Fair,” 1.4% “Poor,” and 1.4% are classified as structurally deficient — the federal designation for spans whose deck, superstructure, or substructure has been rated 4 or below on the 0–9 NBI scale. Structurally deficient does not mean unsafe to cross; it means the bridge is on the priority list for repair or replacement.

Inspections in TX are conducted by certified engineers from the state Department of Transportation on a 24-month cycle, and results are reported back to the FHWA each spring. The list below shows every NBI-tracked bridge in the county, sorted by inventory load rating. Use the “Sort by” controls to surface the lowest-rated spans first, and click any row for full inspection history, traffic counts, and condition trends.

Source: FHWA National Bridge Inventory. See methodology for full definitions.

691
Total Bridges
42.3%
Good
1.4%
Poor
1.4%
Structurally Deficient

Condition Distribution

Good
42.3% (292)
Fair
39.9% (276)
Poor
1.4% (10)
SD
1.4% (10)

All Bridges (691)

IH 45 W FR

Fair

Over: GROVE CREEK

2.4 MI N OF FM 879, Ellis, TX

Built 1958 Load: 34.5 t ADT: 320

HOLDER ROAD

Fair

Over: CHAMBERS CREEK TRIB

0.3 MI NE OF US 77, Ellis, TX

Built 1993 Load: 34.5 t ADT: 196

SANDSWITCH RD

Fair

Over: BIG ONION CREEK

2.80 MI SE OF FM 985, Ellis, TX

Built 2000 Load: 34.5 t ADT: 52

YOUNGBLOOD ROAD

Fair

Over: GROVE CREEK

1.0 MI W OF FM 878, Ellis, TX

Built 1993 Load: 34.5 t ADT: 134

NECK ROAD

Fair

Over: RED OAK CREEK

1.10 MI SW OF NEWTON RD, Ellis, TX

Built 1995 Load: 34.5 t ADT: 174

GARRETT AVE

Fair

Over: COTTONWOOD CREEK

2.20 MI S OF FM 878, Ellis, TX

Built 1993 Load: 34.5 t ADT: 18

BATCHLER RD

Fair

Over: BEAR CREEK

0.3 MI S OF FM 664, Ellis, TX

Built 2001 Load: 34.5 t ADT: 1,103

EAST WYATT ROAD

Fair

Over: WARD BRANCH

0.65 MI SW OF N WARD RD, Ellis, TX

Built 1991 Load: 34.5 t ADT: 72

US 287 SBML

Fair

Over: UPPER MUSTANG CREEK

0.55 MI SE OF US 77, Ellis, TX

Built 1971 Load: 35.4 t ADT: 8,980

FM 877

Fair

Over: S PRONG DAM SPILLWAY

4.3 MI SE OF US 77, Ellis, TX

Built 1956 Load: 35.4 t ADT: 1,588

MILLER ROAD

Fair

Over: SOAP CREEK TRIBUTARY

0.55 MI N OF US 67, Ellis, TX

Built 1994 Load: 36.3 t ADT: 124

NEWMAN RD

Fair

Over: CUMMINS CREEK

0.15 MI E OF OAK GROVE RD, Ellis, TX

Built 1988 Load: 36.3 t ADT: 62

GARRETT AVE

Fair

Over: GROVE CREEK

1.6 MI S OF FM 878, Ellis, TX

Built 2003 Load: 36.3 t ADT: 18

US 287 BUS SB

Fair

Over: LONG BRANCH

0.25 MI SE OF US 287, Ellis, TX

Built 1973 Load: 37.2 t ADT: 4,030

BLACK CHAMP ROAD

Fair

Over: WAXAHACHIE CREEK TRIB

3.15 MI NORTH OF US 287, Ellis, TX

Built 2000 Load: 37.2 t ADT: 62

US 67 NBML

Fair

Over: SUTTON BRANCH

1.50 MI SW OF US 287, Ellis, TX

Built 1969 Load: 39.0 t ADT: 12,783

US 67 NBML

Fair

Over: WARD BRANCH

2.10 MI SW OF MIDLOTHIAN, Ellis, TX

Built 1969 Load: 39.9 t ADT: 15,400

US 77

Fair

Over: HOUSTON CREEK

0.3 MI N OF SH 34, Ellis, TX

Built 1930 Load: 40.8 t ADT: 2,380

IH 35E

Fair

Over: CHAMBERS CREEK RELIEF

2.8 MI N OF SH 34, Ellis, TX

Built 2010 Load: 40.8 t ADT: 35,407

IH 35E

Fair

Over: CHAMBERS CREEK

2.6 MI N OF SH 34, Ellis, TX

Built 2010 Load: 40.8 t ADT: 35,407

IH 35E

Fair

Over: DRAW

3.9 MI S OF FM 66, Ellis, TX

Built 2012 Load: 40.8 t ADT: 44,154

SPUR 469

Fair

Over: SPRR

0.3 MI NW OF BUS 287, Ellis, TX

Built 1932 Load: 40.8 t ADT: 1,752

US 287 NBFR

Fair

Over: UPPER MUSTANG CREEK

0.55 MI SE OF US 77, Ellis, TX

Built 1971 Load: 40.8 t ADT: 7,330

US 287 NB

Fair

Over: LOWER MUSTANG CREEK

1.6 MI SE OF FM 878, Ellis, TX

Built 1971 Load: 40.8 t ADT: 11,398

US 287 SB

Fair

Over: LOWER MUSTANG CREEK

1.6 MI SE OF FM 878, Ellis, TX

Built 1971 Load: 40.8 t ADT: 12,569

US 287 NFR

Fair

Over: LONG BRANCH

1.6 MI W OF FM 664, Ellis, TX

Built 1973 Load: 40.8 t ADT: 160

US 287 S FRTG RD

Fair

Over: LONG BRANCH

0.1 MI W OF US 287 BUS, Ellis, TX

Built 1973 Load: 40.8 t ADT: 790

US 287 NB ML

Fair

Over: IRVING BRANCH

0.6 MI W OF FM 664, Ellis, TX

Built 1973 Load: 40.8 t ADT: 18,540

US 287 SB

Fair

Over: MUSTANG CREEK TRIBUTARY

5.6 MI W OF IH 45, Ellis, TX

Built 1995 Load: 40.8 t ADT: 6,910

US 67 NBML

Fair

Over: RAWLS BRANCH

0.90 MI SW OF US 287, Ellis, TX

Built 1969 Load: 40.8 t ADT: 15,450

US 67 SBML

Fair

Over: WARD BRANCH

2.10 MI SW OF MIDLOTHIAN, Ellis, TX

Built 1980 Load: 40.8 t ADT: 15,400

SH 34

Fair

Over: ONION CREEK RELIEF

0.8 MI SW OF FM 877, Ellis, TX

Built 1978 Load: 40.8 t ADT: 2,377

SH 34

Fair

Over: ONION CREEK

0.6 MI SW OF FM 877, Ellis, TX

Built 1978 Load: 40.8 t ADT: 2,377

SH 34

Fair

Over: ELM BRANCH

2.5 MI NE OF FM 877, Ellis, TX

Built 1978 Load: 40.8 t ADT: 2,827

MILLER ROAD

Fair

Over: COTTONWOOD CREEK

0.7 MI SW OF OLD FT WORT, Ellis, TX

Built 2002 Load: 40.8 t ADT: 189

BEE CREEK RD

Fair

Over: S FORK CHAMBERS CREEK

0.55 MI SE OF FM 66, Ellis, TX

Built 1991 Load: 40.8 t ADT: 72

DUKE ROAD

Fair

Over: RICHLAND CREEK TRIBUTARY

0.1 MI NW OF US 77, Ellis, TX

Built 2008 Load: 40.8 t ADT: 10

S ROGERS STREET

Fair

Over: WAXAHACHIE CREEK

0.27 MI S OF MAIN STREET, Ellis, TX

Built 1991 Load: 40.8 t ADT: 317

KELLEM LYNN DRIVE

Fair

Over: S PRONG CREEK TRIB.

0.1 MI E OF KOLTER LANE, Ellis, TX

Built 2005 Load: 40.8 t ADT: 100

FM 876

Good

Over: SOUTH PRONG CREEK

1.6 MI SW OF IH 35E, Ellis, TX

Built 1951 Load: 20.0 t ADT: 1,035

FM 875

Good

Over: SOUTH PRONG CREEK

4.6 MI W OF FM 528, Ellis, TX

Built 1953 Load: 20.0 t ADT: 2,164

WILSON RD

Good

Over: COTTONWOOD CREEK

1.4 MI SW OF EBENEZER RD, Ellis, TX

Built 2000 Load: 20.9 t ADT: 40

US 77

Good

Over: DRAINAGE DITCH

0.60 MI S OF US 287, Ellis, TX

Built 1984 Load: 23.6 t ADT: 29,700

IH 35E

Good

Over: DRAW

2.9 MI NE OF US 287, Ellis, TX

Built 1957 Load: 23.6 t ADT: 69,257

IH 35E WFR

Good

Over: DRAINAGE DITCH

0.2 MI N OF SH 34, Ellis, TX

Built 1966 Load: 23.6 t ADT: 2,950

IH 35E ML

Good

Over: DRAINAGE DITCH

0.2 MI N OF SH 34, Ellis, TX

Built 1966 Load: 23.6 t ADT: 35,407

IH 35E EFR

Good

Over: DRAINAGE DITCH

0.2 MI N OF SH 34, Ellis, TX

Built 1966 Load: 23.6 t ADT: 2,950

IH 45

Good

Over: DRAW

0.8 MI N OF FM 563, Ellis, TX

Built 1959 Load: 23.6 t ADT: 44,051

IH 45

Good

Over: DRAW

0.3 MI N OF FM 563, Ellis, TX

Built 1959 Load: 23.6 t ADT: 44,051

IH 45

Good

Over: DRAW

0.5 MI N OF FM 1181, Ellis, TX

Built 1960 Load: 23.6 t ADT: 40,485

Related

Data sourced from official U.S. government datasets. See our methodology for details. Retrieved and formatted by PlainBridges Editorial