Fannin County, TX

308 public highway bridges

Fannin County Bridge Snapshot

Fannin County, Texas contains 308 public highway bridges in the FHWA National Bridge Inventory. Roughly 42.2% are rated “Good,” 49% “Fair,” 5.5% “Poor,” and 5.5% are classified as structurally deficient — the federal designation for spans whose deck, superstructure, or substructure has been rated 4 or below on the 0–9 NBI scale. Structurally deficient does not mean unsafe to cross; it means the bridge is on the priority list for repair or replacement.

Inspections in TX are conducted by certified engineers from the state Department of Transportation on a 24-month cycle, and results are reported back to the FHWA each spring. The list below shows every NBI-tracked bridge in the county, sorted by inventory load rating. Use the “Sort by” controls to surface the lowest-rated spans first, and click any row for full inspection history, traffic counts, and condition trends.

Source: FHWA National Bridge Inventory. See methodology for full definitions.

308
Total Bridges
42.2%
Good
5.5%
Poor
5.5%
Structurally Deficient

Condition Distribution

Good
42.2% (130)
Fair
49% (151)
Poor
5.5% (17)
SD
5.5% (17)

All Bridges (308)

SH 11

Fair

Over: BOIS D'ARC CREEK

1.9 MI E OF FM 151, Fannin, TX

Built 1958 Load: 40.8 t ADT: 1,422

CR 3040

Fair

Over: SLOANS CREEK

1.1 MI W OF FM 2077, Fannin, TX

Built 1990 Load: 40.8 t ADT: 60

CR 3015

Fair

Over: SLOANS CREEK

1.5 MI W OF FM 2077, Fannin, TX

Built 2001 Load: 40.8 t ADT: 20

CR 2907

Fair

Over: ONSTOTT BRANCH

2.1 MI W OF FM 897, Fannin, TX

Built 1995 Load: 40.8 t ADT: 50

CR 3475

Fair

Over: DAVIS CREEK TRIBUTARY

0.7 MI S OF CR 3455, Fannin, TX

Built 1992 Load: 40.8 t ADT: 10

CR 1120

Fair

Over: COTTONWOOD CREEK

1 MI S OF FM 274, Fannin, TX

Built 1980 Load: 40.8 t ADT: 50

CR 1115

Fair

Over: SANDY CREEK

1.9 MI S OF FM 274, Fannin, TX

Built 1991 Load: 40.8 t ADT: 50

CR 2005

Fair

Over: SYCAMORE CREEK

0.55 MI E OF SH 78, Fannin, TX

Built 1985 Load: 40.8 t ADT: 40

CR 2510

Fair

Over: WEST OAKLAND BRANCH

0.5 MI W OF FM 898, Fannin, TX

Built 1995 Load: 40.8 t ADT: 130

CR 4605

Fair

Over: BRUSHY CREEK BRANCH

1.5 MI E OF US 96, Fannin, TX

Built 2003 Load: 40.8 t ADT: 20

CR 4925

Fair

Over: TRIB OF BEAR CREEK

0.6 MI W OF FM 981, Fannin, TX

Built 2007 Load: 40.8 t ADT: 10

US 82

Good

Over: BRUSHY CREEK TRIBUTARY

0.6 MI W OF FM 1752, Fannin, TX

Built 1998 Load: 23.6 t ADT: 6,243

US 82

Good

Over: TRIBUTARY OF CANEY CREEK

0.5 mi. E. of FM 898, Fannin, TX

Built 1996 Load: 23.6 t ADT: 6,243

US 69

Good

Over: ARNOLD CRK

0.1 MI S OF SH 78 (SOUTH), Fannin, TX

Built 1943 Load: 23.6 t ADT: 4,521

SH 78

Good

Over: DRAW

2.4 MI S OF SH 56, Fannin, TX

Built 1947 Load: 23.6 t ADT: 2,136

FM 1752

Good

Over: BRUSHY CRK

3.3 MI N OF SH 56, Fannin, TX

Built 1954 Load: 23.6 t ADT: 194

FM 1753

Good

Over: HENLEY CREEK

3.6 MI E OF GRAYSON CL, Fannin, TX

Built 1980 Load: 23.6 t ADT: 2,165

SH 11

Good

Over: ROCK CREEK

1.4 MI E OF FM 151, Fannin, TX

Built 1958 Load: 23.6 t ADT: 1,422

SH 11

Good

Over: PORTER CREEK

2.2 MI W OF FM 3297, Fannin, TX

Built 1958 Load: 23.6 t ADT: 1,422

SH 56

Good

Over: CANOE LK DRAINAGE DITCH

1.85 MI E OF SH 78, Fannin, TX

Built 1931 Load: 24.5 t ADT: 2,818

US 82

Good

Over: SPRING BRANCH

8.4 MI E OF SH 78, Fannin, TX

Built 1990 Load: 24.5 t ADT: 6,928

US 82

Good

Over: DRAW

1.6 MI E OF FM 1743, Fannin, TX

Built 1990 Load: 24.5 t ADT: 6,652

US 82

Good

Over: DRAW

0.8 MI W OF FM 100, Fannin, TX

Built 1990 Load: 24.5 t ADT: 6,776

US 82

Good

Over: DRAW

0.4 MI W OF FM 100, Fannin, TX

Built 1990 Load: 24.5 t ADT: 6,776

FM 100

Good

Over: HONEY GROVE CREEK

0.1 MI N OF US 82, Fannin, TX

Built 1990 Load: 24.5 t ADT: 1,988

SH 78

Good

Over: BOIS D'ARC BRANCH

1.5 MI S OF SH 56, Fannin, TX

Built 1938 Load: 24.5 t ADT: 2,786

SH 78

Good

Over: INDIAN CRK

0.2 MI W OF FM 815, Fannin, TX

Built 1957 Load: 24.5 t ADT: 2,012

FM 898

Good

Over: PORTER CREEK

0.3 MI E OF FM 1752, Fannin, TX

Built 1953 Load: 24.5 t ADT: 217

FM 898

Good

Over: MCCLUNG CREEK

2.0 MI S OF SH 56, Fannin, TX

Built 1991 Load: 24.5 t ADT: 336

SH 121

Good

Over: PIG BRANCH

1.1 MI S OF US 82, Fannin, TX

Built 1970 Load: 24.5 t ADT: 11,708

SH 121

Good

Over: POWDER CREEK

0.02 MI N OF SH 56, Fannin, TX

Built 1970 Load: 24.5 t ADT: 11,708

SH 121

Good

Over: DOG CREEK

2.1 MI. SW OF US 69, Fannin, TX

Built 1962 Load: 24.5 t ADT: 10,900

FM 271

Good

Over: BOIS D'ARC BRANCH

0.3 MI E OF SH 78, Fannin, TX

Built 1985 Load: 24.5 t ADT: 775

FM 271

Good

Over: BOIS D'ARC BRANCH

0.6 MI E OF SH 78, Fannin, TX

Built 1985 Load: 24.5 t ADT: 775

FM 824

Good

Over: SHELTON CREEK

5.5 MI S OF SH 56, Fannin, TX

Built 1940 Load: 24.5 t ADT: 193

FM 2077

Good

Over: DRAW

1.0 MI S OF SH 56, Fannin, TX

Built 1960 Load: 24.5 t ADT: 581

FM 1550

Good

Over: POT CREEK

0.1 MI E OF FM 2077, Fannin, TX

Built 1950 Load: 24.5 t ADT: 234

FM 1552

Good

Over: SHAWNEE CREEK

1.90 MI E OF SH 78, Fannin, TX

Built 1990 Load: 24.5 t ADT: 157

FM 1752

Good

Over: DAMERON CRK

2.0 MI S OF SH 56, Fannin, TX

Built 1963 Load: 24.5 t ADT: 333

FM 1753

Good

Over: MURPHY CREEK

1.0 MI E OF FM 2645, Fannin, TX

Built 1996 Load: 24.5 t ADT: 1,480

FM 1629

Good

Over: COOPER CRK

1.5 MI NE OF SH 121, Fannin, TX

Built 1956 Load: 24.5 t ADT: 576

FM 2815

Good

Over: DYER CRK

0.4 MI N OF SH 11, Fannin, TX

Built 1966 Load: 24.5 t ADT: 303

CR 4500

Good

Over: ROCK CREEK

0.2 MI S OF SH 11, Fannin, TX

Built 2003 Load: 24.5 t ADT: 70

FM 271

Good

Over: BOIS D'ARC CREEK

0.4 MI E OF SH 78, Fannin, TX

Built 1985 Load: 31.7 t ADT: 775

US 82 EB

Good

Over: CANEY CREEK

4.5 MI W OF SH 121, Fannin, TX

Built 1998 Load: 32.7 t ADT: 5,250

US 82 WB

Good

Over: CANEY CREEK

4.5 MI W OF SH 121, Fannin, TX

Built 2013 Load: 32.7 t ADT: 6,400

US 82 EB

Good

Over: BOIS D'ARC CREEK RELIEF

1.6 MI E OF SH 78, Fannin, TX

Built 1990 Load: 32.7 t ADT: 7,333

US 82 WB

Good

Over: Bois D' Arc Ck Relief

1.6 MI E of SH 78, Fannin, TX

Built 2021 Load: 32.7 t ADT: 5,700

US 82 WB

Good

Over: BOIS D' ARC CK

2 MI E of SH 78, Fannin, TX

Built 2021 Load: 32.7 t ADT: 5,700

US 82 WB

Good

Over: SLOANS CK

2.5 MI E of SH 78, Fannin, TX

Built 2021 Load: 32.7 t ADT: 5,700

Related

Data sourced from official U.S. government datasets. See our methodology for details. Retrieved and formatted by PlainBridges Editorial