Galveston County, TX

344 public highway bridges

Galveston County Bridge Snapshot

Galveston County, Texas contains 344 public highway bridges in the FHWA National Bridge Inventory. Roughly 52.3% are rated “Good,” 32.3% “Fair,” 2.3% “Poor,” and 2.3% are classified as structurally deficient — the federal designation for spans whose deck, superstructure, or substructure has been rated 4 or below on the 0–9 NBI scale. Structurally deficient does not mean unsafe to cross; it means the bridge is on the priority list for repair or replacement.

Inspections in TX are conducted by certified engineers from the state Department of Transportation on a 24-month cycle, and results are reported back to the FHWA each spring. The list below shows every NBI-tracked bridge in the county, sorted by inventory load rating. Use the “Sort by” controls to surface the lowest-rated spans first, and click any row for full inspection history, traffic counts, and condition trends.

Source: FHWA National Bridge Inventory. See methodology for full definitions.

344
Total Bridges
52.3%
Good
2.3%
Poor
2.3%
Structurally Deficient

Condition Distribution

Good
52.3% (180)
Fair
32.3% (111)
Poor
2.3% (8)
SD
2.3% (8)

All Bridges (344)

Eagle Lakes Drive

Fair

Over: Drainage Ditch

0.04 Mi NE of Sandy Lake, Galveston, TX

Built 2000 Load: 24.5 t ADT: 400

OAK DR

Fair

Over: CHIGGER CRK

0.25 MI NE OF FM 518, Galveston, TX

Built 1977 Load: 24.5 t ADT: 5,760

SAN JOAQUIN PKWY

Fair

Over: DRAINAGE DITCH

0.4 MI SE of FM 528, Galveston, TX

Built 1985 Load: 24.5 t ADT: 400

Sandy Lake Drive

Fair

Over: Drainage Ditch

0.25 MI SE of Stoney Lane, Galveston, TX

Built 2000 Load: 24.5 t ADT: 400

Stoney Lake Drive

Fair

Over: Drainage Ditch

0.02 MI NE OF FRIENDSSWD, Galveston, TX

Built 1993 Load: 24.5 t ADT: 400

SUNSET DR

Fair

Over: COWART CRK

0.6 MI SE OF FM 2351, Galveston, TX

Built 1983 Load: 24.5 t ADT: 12,590

TALL PINE DR.

Fair

Over: DITCH

0.10 MI SW OF SUNSET DR, Galveston, TX

Built 1980 Load: 24.5 t ADT: 320

WINDING RD

Fair

Over: MARY'S CREEK

0.2 MI NE OF FM 518, Galveston, TX

Built 1970 Load: 24.5 t ADT: 850

SH 6

Fair

Over: HIGHLAND BAYOU

0.75 MI W OF IH 45, Galveston, TX

Built 1964 Load: 25.4 t ADT: 9,393

SH87 FERRY N SLP 4

Fair

Over: GALVESTON BAY

1.0 MI W OF LP 108, Galveston, TX

Built 1980 Load: 27.2 t ADT: 3,560

FM 517

Fair

Over: DICKINSON BAYOU

3.60 MI NE OF SH 35, Galveston, TX

Built 1948 Load: 28.1 t ADT: 15,187

FM 517

Fair

Over: CEDAR CREEK

5.60 MI NE OF SH 35, Galveston, TX

Built 1948 Load: 28.1 t ADT: 15,187

SH 146

Fair

Over: DRAINAGE DITCH #14

0.45 MI N OF FM 1765, Galveston, TX

Built 1947 Load: 29.0 t ADT: 12,996

FM 646

Fair

Over: WILLOW BAYOU

0.40 MI N OF FM 2004, Galveston, TX

Built 1962 Load: 30.8 t ADT: 2,312

MANDALE RD

Fair

Over: AMERICAN CANAL

0.3 MI S OF LUNDY LANE, Galveston, TX

Built 1986 Load: 30.8 t ADT: 50

SH 3

Fair

Over: DICKINSON BAYOU

0.40 MI SE OF FM 517, Galveston, TX

Built 1982 Load: 32.7 t ADT: 15,959

SH 3

Fair

Over: CLEAR CREEK RELIEF

0.85 MI NW OF FM 518, Galveston, TX

Built 1988 Load: 32.7 t ADT: 19,772

SPUR 342 SB

Fair

Over: OFFATTS BAYOU

0.30 MI S OF IH 45, Galveston, TX

Built 1967 Load: 32.7 t ADT: 17,150

SPUR 342 NB

Fair

Over: OFFATTS BAYOU

0.30 MI S OF IH 45, Galveston, TX

Built 1967 Load: 32.7 t ADT: 14,774

SH 124

Fair

Over: INTRACOASTAL CANAL

3.50 MI N OF SH 87, Galveston, TX

Built 1978 Load: 32.7 t ADT: 2,073

SH 87

Fair

Over: ROLLOVER PASS

7.1 MI SW OF SH 124, Galveston, TX

Built 1984 Load: 32.7 t ADT: 3,382

SH87 FERRY N SLP 6

Fair

Over: GALVESTON BAY

1.0 MI W OF LP 108, Galveston, TX

Built 1980 Load: 32.7 t ADT: 3,560

SH 146 SB

Fair

Over: MOSES BAYOU

1.0 MI N OF LOOP 197, Galveston, TX

Built 1985 Load: 32.7 t ADT: 10,900

SH 146 NB

Fair

Over: MOSES BAYOU

1.0 MI N OF LOOP 197, Galveston, TX

Built 1985 Load: 32.7 t ADT: 11,007

IH 45 SBFR

Fair

Over: Dickinson Bayou

0.30 Mi. SE of FM 517, Galveston, TX

Built 2022 Load: 32.7 t ADT: 10,900

FM 518

Fair

Over: COWART CREEK

0.6 MI N OF FM 528, Galveston, TX

Built 1989 Load: 32.7 t ADT: 18,744

FM 518

Fair

Over: LANDING DITCH

0.65 MI W OF IH 45, Galveston, TX

Built 1989 Load: 32.7 t ADT: 29,173

FM 646

Fair

Over: HL&P DISCHARGE CANAL

2.5 MI E OF SH146/FM646, Galveston, TX

Built 1994 Load: 32.7 t ADT: 8,809

FM 528

Fair

Over: CHIGGER CREEK

0.5 MI SW OF FM 518, Galveston, TX

Built 1993 Load: 32.7 t ADT: 28,004

FM 1764

Fair

Over: HIGHLAND BAYOU DITCH

2.2 MI W OF IH 45, Galveston, TX

Built 1997 Load: 32.7 t ADT: 18,390

SH 275 (E OF 51ST)

Fair

Over: UP AND BNSF RR

2.60 MI E OF IH 45, Galveston, TX

Built 1985 Load: 32.7 t ADT: 11,822

Sportsman Road

Fair

Over: Gangs Bayou

1.05 Mi W of 8 Mile Rd, Galveston, TX

Built 2012 Load: 32.7 t ADT: 20

AUSTIN ST

Fair

Over: ROBINSON BAYOU

0.15 MI W OF FM 270, Galveston, TX

Built 1985 Load: 32.7 t ADT: 430

W NASA BLVD

Fair

Over: HCFCD NO A110-00-00

0.9 MI SW OF FM 528, Galveston, TX

Built 1990 Load: 32.7 t ADT: 4,520

S SHORE BLVD EB

Fair

Over: HL & P CANAL

0.3 MI SE OF FM 2094, Galveston, TX

Built 1987 Load: 32.7 t ADT: 8,840

CASTLEWOOD RD

Fair

Over: COWART CREEK

0.4 MI SW OF FM 518, Galveston, TX

Built 1983 Load: 32.7 t ADT: 3,060

GREENBRIAR AVE.

Fair

Over: CHIGGER CRK

0.2 MI NW OF FM 528, Galveston, TX

Built 1984 Load: 32.7 t ADT: 3,580

IH 45 SBML

Fair

Over: DICKINSON BAYOU

0.30 MI SE OF FM 517, Galveston, TX

Built 1948 Load: 33.6 t ADT: 41,018

28TH ST

Fair

Over: CLOUD BAYOU

1.10 MI E OF MOORE RD, Galveston, TX

Built 1988 Load: 33.6 t ADT: 1,213

SH 6

Fair

Over: COW GULLY

0.35 MI SE OF FM 2004, Galveston, TX

Built 1931 Load: 36.3 t ADT: 12,772

SH 3 NB

Fair

Over: MOSES BAYOU

1.5 MI NW OF FM1764, Galveston, TX

Built 1992 Load: 40.8 t ADT: 2,889

SH87 FERRY N SLP 5

Fair

Over: GALVESTON BAY

1.0 MI W OF LP 108, Galveston, TX

Built 2006 Load: 40.8 t ADT: 3,560

SH87 FERRY S SLP 3

Fair

Over: GALVESTON BAY

1.3 MI N OF SEAWALL BLVD, Galveston, TX

Built 2006 Load: 40.8 t ADT: 4,230

SH87 FERRY S SLP 2

Fair

Over: GALVESTON BAY

1.3 MI N OF SEAWALL BLVD, Galveston, TX

Built 2006 Load: 40.8 t ADT: 4,230

IH 45 NB

Fair

Over: GALVESTON BAY

3.70 MI SE OF SH 6, Galveston, TX

Built 2006 Load: 40.8 t ADT: 34,360

IH 45 SB

Fair

Over: GALVESTON BAY

3.70 MI SE OF SH 6, Galveston, TX

Built 2007 Load: 40.8 t ADT: 34,360

FM 517

Fair

Over: HL & P INTAKE CANAL

1.45 MI NE OF SH 146, Galveston, TX

Built 1981 Load: 40.8 t ADT: 8,181

FM 528

Fair

Over: IRRIGATION CANAL

3.8 MI SW OF FM 518, Galveston, TX

Built 1993 Load: 40.8 t ADT: 17,411

FM 1764 EB FR

Fair

Over: DRAINAGE DITCH NO. 7B

0.70 MI W OF SH 146, Galveston, TX

Built 1971 Load: 40.8 t ADT: 1,330

FM 1764 WB FR

Fair

Over: DRAINAGE DITCH NO. 7B

0.70 MI W OF SH 146, Galveston, TX

Built 1971 Load: 40.8 t ADT: 1,030

Related

Data sourced from official U.S. government datasets. See our methodology for details. Retrieved and formatted by PlainBridges Editorial