Goliad County, TX

126 public highway bridges

Goliad County Bridge Snapshot

Goliad County, Texas contains 126 public highway bridges in the FHWA National Bridge Inventory. Roughly 55.6% are rated “Good,” 41.3% “Fair,” 1.6% “Poor,” and 1.6% are classified as structurally deficient — the federal designation for spans whose deck, superstructure, or substructure has been rated 4 or below on the 0–9 NBI scale. Structurally deficient does not mean unsafe to cross; it means the bridge is on the priority list for repair or replacement.

Inspections in TX are conducted by certified engineers from the state Department of Transportation on a 24-month cycle, and results are reported back to the FHWA each spring. The list below shows every NBI-tracked bridge in the county, sorted by inventory load rating. Use the “Sort by” controls to surface the lowest-rated spans first, and click any row for full inspection history, traffic counts, and condition trends.

Source: FHWA National Bridge Inventory. See methodology for full definitions.

126
Total Bridges
55.6%
Good
1.6%
Poor
1.6%
Structurally Deficient

Condition Distribution

Good
55.6% (70)
Fair
41.3% (52)
Poor
1.6% (2)
SD
1.6% (2)

All Bridges (126)

US 59

Unknown

Over: FM 2987

9.45 MI E OF US 183/77A, Goliad, TX

Built 2008 ADT: 740

US 183

Unknown

Over: SAN ANTONIO RI REL-PR 6

1.2 MI S OF US 59, Goliad, TX

Built 2000 ADT: 100

FM 884

Fair

Over: CABEZA CREEK

9.7 MI W OF SH 119, Goliad, TX

Built 1954 Load: 21.8 t ADT: 135

US 183

Fair

Over: FARMER CREEK

5.5 MI N OF US 59, Goliad, TX

Built 1958 Load: 23.6 t ADT: 2,146

US 183

Fair

Over: PERDIDO CREEK

8.3 MI N OF US 59, Goliad, TX

Built 1958 Load: 23.6 t ADT: 2,146

US 183

Fair

Over: PERDIDO CREEK TRIBUTARY

8.5 MI N OF US 59, Goliad, TX

Built 1958 Load: 23.6 t ADT: 2,146

FM 2506

Fair

Over: PORTIS DRAW

4.85 MI SE OF US 59, Goliad, TX

Built 1959 Load: 23.6 t ADT: 100

FM 1351

Fair

Over: MILLERS CREEK

2.2 MI E OF FM 883, Goliad, TX

Built 1969 Load: 23.6 t ADT: 100

US 59

Fair

Over: BLANCO CREEK

0.65 MI SW OF FM 883, Goliad, TX

Built 1930 Load: 24.5 t ADT: 3,731

US 59

Fair

Over: MILLERS CREEK

0.8 MI NE OF JCT FM 883, Goliad, TX

Built 1929 Load: 24.5 t ADT: 3,839

US 59

Fair

Over: MUJERRERO CREEK

4.1 MI NE OF JCT FM 883, Goliad, TX

Built 1929 Load: 24.5 t ADT: 3,839

US 59

Fair

Over: SPARROW CREEK

0.1 MI E OF US 183, Goliad, TX

Built 1929 Load: 24.5 t ADT: 7,552

US 59

Fair

Over: DRAW

3.1 MI E OF US 183, Goliad, TX

Built 1929 Load: 24.5 t ADT: 5,897

US 183

Fair

Over: DRAW

0.3 MI S OF SH 119, Goliad, TX

Built 1930 Load: 24.5 t ADT: 2,146

US 183

Fair

Over: SPARROW CREEK

0.1 MI N OF US 59, Goliad, TX

Built 1930 Load: 24.5 t ADT: 4,311

US 183

Fair

Over: SPARROW CREEK

0.3 MI S OF US 59, Goliad, TX

Built 1936 Load: 24.5 t ADT: 3,483

FM 883

Fair

Over: BLANCO CREEK

9.1 MI NE OF FM 1351, Goliad, TX

Built 1963 Load: 24.5 t ADT: 306

FM 884

Fair

Over: HOOSIER CREEK

5.1 MI E OF SH 119, Goliad, TX

Built 1988 Load: 24.5 t ADT: 100

FM 884

Fair

Over: 18 MI COLETO CREEK

0.3 MI W OF SH 119, Goliad, TX

Built 1980 Load: 24.5 t ADT: 396

FM 884

Fair

Over: MANAHUILLA CREEK

5.4 MI W OF SH 119, Goliad, TX

Built 1988 Load: 24.5 t ADT: 135

FM 1726

Fair

Over: DRY CREEK

6.2 MI N OF US 59, Goliad, TX

Built 1981 Load: 24.5 t ADT: 264

FM 1961

Fair

Over: DRAW

6.4 MI SE OF US 183, Goliad, TX

Built 1988 Load: 24.5 t ADT: 197

FM 2441

Fair

Over: SARCO CREEK

7.0 MI S OF US 183, Goliad, TX

Built 1955 Load: 24.5 t ADT: 309

ROCK HILL RD

Fair

Over: HORD CREEK

4.00 MI SW OF SH 239, Goliad, TX

Built 1986 Load: 24.5 t ADT: 55

LUCAS RD

Fair

Over: MILLERS CREEK

1.45 MI E OF TEMPLE ST, Goliad, TX

Built 1979 Load: 24.5 t ADT: 65

CLIP RD

Fair

Over: GOAT CREEK

2.35 MI S OF US 59, Goliad, TX

Built 1989 Load: 24.5 t ADT: 55

NORDHEIM RD

Fair

Over: GOAT CREEK

0.9 MI N OF FM 884, Goliad, TX

Built 1960 Load: 24.5 t ADT: 105

WILLIAMS RD

Fair

Over: MANAHUILLA CR

0.75 MI NE OF NORDHEIM RD, Goliad, TX

Built 1989 Load: 24.5 t ADT: 50

ENKE RD

Fair

Over: PETERS CREEK

2.15 MI W OF CHURCH RD, Goliad, TX

Built 1984 Load: 24.5 t ADT: 55

CHURCH RD

Fair

Over: HOG CREEK

2.5 MI S OF SH 119, Goliad, TX

Built 1985 Load: 24.5 t ADT: 90

DANFORTH RD

Fair

Over: FARMER CREEK

2.30 MI N OF FM 622, Goliad, TX

Built 1975 Load: 24.5 t ADT: 80

DANFORTH RD

Fair

Over: PERDIDO CREEK

3.20 MI N OF FM 622, Goliad, TX

Built 1976 Load: 24.5 t ADT: 80

DANFORTH RD

Fair

Over: DRAW

4.10 MI N OF FM 622, Goliad, TX

Built 1979 Load: 24.5 t ADT: 80

HALLEMANN RD

Fair

Over: HOG CREEK

2.60 MI W OF US 183 / 77A, Goliad, TX

Built 1984 Load: 24.5 t ADT: 55

AFFLERBACH RD

Fair

Over: HOOSIER CREEK

1.30 MI S OF FM 884, Goliad, TX

Built 1981 Load: 24.5 t ADT: 55

CAMP COLET RD

Fair

Over: HOG THIEF CREEK

0.95 MI N OF FM 622, Goliad, TX

Built 1982 Load: 24.5 t ADT: 370

FANNIN RD

Fair

Over: GOBBLER CREEK

1.45 MI S OF FM 622, Goliad, TX

Built 1986 Load: 24.5 t ADT: 180

FANNIN RD

Fair

Over: TURKEY CREEK

3.7 MI S OF FM 622, Goliad, TX

Built 1976 Load: 24.5 t ADT: 180

SAN PATRICIO ST

Fair

Over: DRAW

0.40 MI S OF FANNIN ST, Goliad, TX

Built 1950 Load: 24.5 t ADT: 70

END STREET

Fair

Over: SPARROW CREEK

0.10 MI E OF US 183, Goliad, TX

Built 1941 Load: 24.5 t ADT: 55

US 183

Fair

Over: 18 MILE COLETO CREEK

0.6 MI S OF FM 1961, Goliad, TX

Built 1937 Load: 28.1 t ADT: 1,382

US 59

Fair

Over: SAN ANTONIO RIVER

3.0 MI SW OF US 183, Goliad, TX

Built 1930 Load: 29.0 t ADT: 3,392

US 59 SB

Fair

Over: MANAHUILLA CREEK

3.9 MI E OF US 183, Goliad, TX

Built 1929 Load: 29.0 t ADT: 3,960

SH 119

Fair

Over: 18 MILE COLETO CREEK

4.8 MI NW OF US 183, Goliad, TX

Built 1968 Load: 30.8 t ADT: 1,176

SH 119

Fair

Over: HOG CREEK

3.1 MI NW OF US 183, Goliad, TX

Built 1968 Load: 30.8 t ADT: 1,176

US 59 SB

Fair

Over: COLETO CR RES

1.80 MI E OF FM 2987, Goliad, TX

Built 2008 Load: 32.7 t ADT: 3,950

US 59 SB

Fair

Over: AEP RR SPUR

0.6 MI N OF FM 2987, Goliad, TX

Built 1979 Load: 32.7 t ADT: 3,950

US 59 NB

Fair

Over: COLETO CR RES

1.80 MI E OF FM 2987, Goliad, TX

Built 2008 Load: 32.7 t ADT: 3,950

US 59 NB

Fair

Over: COLETO CR RESERVOIR

2.15 MI E OF FM 2987, Goliad, TX

Built 2008 Load: 32.7 t ADT: 3,950

US 183

Fair

Over: SAN ANTONIO RIVER

1.3 MI S OF US 59, Goliad, TX

Built 2000 Load: 32.7 t ADT: 3,397

Related

Data sourced from official U.S. government datasets. See our methodology for details. Retrieved and formatted by PlainBridges Editorial