Gray County, TX

79 public highway bridges

Gray County Bridge Snapshot

Gray County, Texas contains 79 public highway bridges in the FHWA National Bridge Inventory. Roughly 22.8% are rated “Good,” 51.9% “Fair,” 5.1% “Poor,” and 5.1% are classified as structurally deficient — the federal designation for spans whose deck, superstructure, or substructure has been rated 4 or below on the 0–9 NBI scale. Structurally deficient does not mean unsafe to cross; it means the bridge is on the priority list for repair or replacement.

Inspections in TX are conducted by certified engineers from the state Department of Transportation on a 24-month cycle, and results are reported back to the FHWA each spring. The list below shows every NBI-tracked bridge in the county, sorted by inventory load rating. Use the “Sort by” controls to surface the lowest-rated spans first, and click any row for full inspection history, traffic counts, and condition trends.

Source: FHWA National Bridge Inventory. See methodology for full definitions.

79
Total Bridges
22.8%
Good
5.1%
Poor
5.1%
Structurally Deficient

Condition Distribution

Good
22.8% (18)
Fair
51.9% (41)
Poor
5.1% (4)
SD
5.1% (4)

All Bridges (79)

SH 273

Fair

Over: McClellan Creek

2.5 Mi S of FM 2473, Gray, TX

Built 1988 Load: 32.7 t ADT: 554

FM 2375

Fair

Over: North Fork Red River

0.1 Mi W of SH 273, Gray, TX

Built 1985 Load: 32.7 t ADT: 149

RM 1321

Fair

Over: Cabin Creek

1.8 Mi E of SH 273, Gray, TX

Built 2004 Load: 32.7 t ADT: 100

RM 1321

Fair

Over: Draw

2.3 Mi E of SH 273, Gray, TX

Built 2004 Load: 32.7 t ADT: 100

Boydston County Rd

Fair

Over: McClellan Creek

0.75 N of IH 40, Gray, TX

Built 2012 Load: 32.7 t ADT: 25

SH 70

Fair

Over: North Fork of Red River

16.2 Mi N of IH 40, Gray, TX

Built 1941 Load: 33.6 t ADT: 1,127

CR 29

Fair

Over: S Long Dry Creek

0.7 Mi N of FM 3143, Gray, TX

Built 1986 Load: 33.6 t ADT: 50

SH 152

Good

Over: Draw

16.8 Mi E of US 60, Gray, TX

Built 1933 Load: 23.6 t ADT: 1,413

SH 152

Good

Over: Drain

0.1 Mi W of FM 282, Gray, TX

Built 1938 Load: 23.6 t ADT: 5,733

FM 291

Good

Over: Draw

1.8 Mi N of IH 40, Gray, TX

Built 1949 Load: 23.6 t ADT: 100

FM 2375

Good

Over: Draw

0.2 Mi of E SH 273, Gray, TX

Built 1956 Load: 23.6 t ADT: 100

FM 2300

Good

Over: North Fork of Red River

6.2 Mi S of US 60, Gray, TX

Built 1956 Load: 23.6 t ADT: 114

CR 10

Good

Over: Red Deer Creek

2.4 Mi NE of LP 171, Gray, TX

Built 1975 Load: 24.5 t ADT: 75

Harvester Ave

Good

Over: Red Deer Creek

1.0 Mi W of Browning Ave, Gray, TX

Built 1966 Load: 24.5 t ADT: 3,380

SH 273

Good

Over: North Fork of Red River

0.4 Mi NW of FM 291, Gray, TX

Built 2012 Load: 32.7 t ADT: 698

FM 291

Good

Over: N McClellan Creek

6.0 Mi N of IH 40, Gray, TX

Built 2001 Load: 32.7 t ADT: 100

FM 291

Good

Over: McClellan Creek

4.9 Mi N of IH 40, Gray, TX

Built 2001 Load: 32.7 t ADT: 100

RM 1321

Good

Over: North Fork of Red River

2.8 Mi N of FM 2473, Gray, TX

Built 2004 Load: 32.7 t ADT: 135

RM 1321

Good

Over: Sand Creek

5.8 M E of SH 273, Gray, TX

Built 2022 Load: 32.7 t ADT: 103

RM 1474

Good

Over: CABIN CREEK

1.41 MI N OF FM 1321, Gray, TX

Built 2021 Load: 32.7 t ADT: 40

Knorpp Rd

Good

Over: McClellan Creek

0.9 Mi N of IH 40, Gray, TX

Built 2003 Load: 32.7 t ADT: 50

County Road 17

Good

Over: Grapevine Creek

.89 Mi. South of FM 2375, Gray, TX

Built 2019 Load: 32.7 t ADT: 50

FM 291

Good

Over: ROCK CREEK

2.54 MI S. OF GRAY C/L, Gray, TX

Built 2008 Load: 32.7 t ADT: 100

Duncan St

Good

Over: Red Deer Creek

0.4 Mi S of Kentucky, Gray, TX

Built 1961 Load: 40.8 t ADT: 2,700

Cuyler St

Good

Over: Red Deer Creek

0.4 Mi S of Kentucky, Gray, TX

Built 2003 Load: 40.8 t ADT: 1,280

IH 40 WB

Poor

Over: IH 40 Frontage Road Conn

1.2 Mi W of SH 273, Gray, TX

Built 1984 Load: 28.1 t ADT: 6,341

IH 40 EB

Poor

Over: IH 40 Frontage Road Conn

1.2 Mi W of SH 273, Gray, TX

Built 1984 Load: 28.1 t ADT: 6,312

FM 291

Poor

Over: WHITEFISH CREEK

0.68 MI S OF GRAY C/L, Gray, TX

Built 1959 Load: 33.6 t ADT: 100

FM 2473

Structurally Deficient

Over: McClellan Creek

3.6 Mi E of SH 273, Gray, TX

Built 1959 Load: 31.7 t ADT: 100

Related

Data sourced from official U.S. government datasets. See our methodology for details. Retrieved and formatted by PlainBridges Editorial