Harrison County, TX

269 public highway bridges

Harrison County Bridge Snapshot

Harrison County, Texas contains 269 public highway bridges in the FHWA National Bridge Inventory. Roughly 37.5% are rated “Good,” 47.6% “Fair,” 2.6% “Poor,” and 2.6% are classified as structurally deficient — the federal designation for spans whose deck, superstructure, or substructure has been rated 4 or below on the 0–9 NBI scale. Structurally deficient does not mean unsafe to cross; it means the bridge is on the priority list for repair or replacement.

Inspections in TX are conducted by certified engineers from the state Department of Transportation on a 24-month cycle, and results are reported back to the FHWA each spring. The list below shows every NBI-tracked bridge in the county, sorted by inventory load rating. Use the “Sort by” controls to surface the lowest-rated spans first, and click any row for full inspection history, traffic counts, and condition trends.

Source: FHWA National Bridge Inventory. See methodology for full definitions.

269
Total Bridges
37.5%
Good
2.6%
Poor
2.6%
Structurally Deficient

Condition Distribution

Good
37.5% (101)
Fair
47.6% (128)
Poor
2.6% (7)
SD
2.6% (7)

All Bridges (269)

BOMAR ST

Fair

Over: TURTLE CREEK

0.1 MI N OF SH 43, Harrison, TX

Built 1977 Load: 24.5 t ADT: 2,465

CIRCLE DR

Fair

Over: TURTLE CREEK

0.2 MI E OF S GARRETT, Harrison, TX

Built 1950 Load: 24.5 t ADT: 164

ELYSIAN FIELDS AVE

Fair

Over: PARKER CREEK

0.05 MI E OF US 59, Harrison, TX

Built 1955 Load: 24.5 t ADT: 2,316

N. FRANKLIN ST

Fair

Over: PARKER CREEK

0.20 MI N OF US 80, Harrison, TX

Built 1950 Load: 24.5 t ADT: 500

GAIL DR

Fair

Over: TURTLE CREEK

0.2 MI S OF MEREDITH ST, Harrison, TX

Built 1950 Load: 24.5 t ADT: 109

S GARRETT ST

Fair

Over: TURTLE CREEK

0.07 MI N OF SH 43, Harrison, TX

Built 1977 Load: 24.5 t ADT: 2,961

HAZELWOOD ST

Fair

Over: DRAINAGE DITCH

0.05 MI N OF HOUSTON ST, Harrison, TX

Built 1989 Load: 24.5 t ADT: 361

MAVERICK DR

Fair

Over: TURTLE CREEK

0.1 MI N OF SH 43, Harrison, TX

Built 1986 Load: 24.5 t ADT: 2,071

ROSBOROUGH SPR RD

Fair

Over: TURTLE CREEK

0.2 MI N OF SH 43, Harrison, TX

Built 1977 Load: 24.5 t ADT: 3,413

TURTLE CREEK DR

Fair

Over: TURTLE CREEK

.04 MI S OF ST FRANCIS ST, Harrison, TX

Built 1977 Load: 24.5 t ADT: 147

S WASHINGTON AVE

Fair

Over: TURTLE CREEK

0.1 MI N OF SH 43, Harrison, TX

Built 1965 Load: 24.5 t ADT: 5,772

CR 4106

Fair

Over: BEAR CREEK

1.9 MI NE OF SH 154, Harrison, TX

Built 2004 Load: 25.4 t ADT: 237

OWENS CORNER RD

Fair

Over: PICNITT CREEK

3.9 MI SE OF FM 1793, Harrison, TX

Built 1993 Load: 25.4 t ADT: 100

CR 3321-TALLY RD

Fair

Over: SABINE RIVER TRIBUTARY

1.4 MI S OF IH 20, Harrison, TX

Built 1994 Load: 25.4 t ADT: 78

FM 1186

Fair

Over: EIGHT MILE CREEK

1.35 MI SE OF US 59, Harrison, TX

Built 1951 Load: 26.3 t ADT: 661

SH 43

Fair

Over: POTTERS CREEK

2.5 MI S OF IH 20, Harrison, TX

Built 1930 Load: 26.3 t ADT: 3,235

FM 1998

Fair

Over: HARRISON BAYOU

2.85 MI W OF FM 134, Harrison, TX

Built 1920 Load: 26.3 t ADT: 532

CR 2401

Fair

Over: BECKUM CREEK

0.5 MI N OF FM 134, Harrison, TX

Built 1989 Load: 26.3 t ADT: 106

CR 1114

Fair

Over: CROSS BAYOU

1.0 MI S OF IH 20, Harrison, TX

Built 2001 Load: 26.3 t ADT: 518

AVENUE 'Q'

Fair

Over: Harrison Bayou

2.3 MI. E of HQ, Harrison, TX

Built 1950 Load: 28.1 t ADT: 40

LP 281 SB

Fair

Over: UNION PACIFIC RAILROAD

0.20 MI S OF US 80, Harrison, TX

Built 1967 Load: 28.1 t ADT: 6,796

AVENUE 'Q'

Fair

Over: UNNAMED DRAINAGE

2.3 MI. E of HQ, Harrison, TX

Built 1950 Load: 29.0 t ADT: 40

AVENUE 'Q'

Fair

Over: UNNAMED DRAINAGE

2.3 MI. E of HQ, Harrison, TX

Built 1950 Load: 29.0 t ADT: 40

FM 31

Fair

Over: EIGHT MILE CREEK

0.10 MI NW OF IH 20, Harrison, TX

Built 1938 Load: 29.0 t ADT: 4,200

PETERS CHAPEL RD

Fair

Over: PICNITT CREEK

2.5 MI SE OF FM 1793, Harrison, TX

Built 1996 Load: 29.0 t ADT: 2

IH 20 EB

Fair

Over: EIGHT MILE CREEK

3.40 MI E OF US 59, Harrison, TX

Built 1965 Load: 29.9 t ADT: 17,422

IH 20 EB

Fair

Over: PARKER CREEK

1.80 MI E OF US 59, Harrison, TX

Built 1965 Load: 30.8 t ADT: 17,422

IH 20 WB

Fair

Over: PARKER CREEK

1.80 MI E OF US 59, Harrison, TX

Built 1965 Load: 30.8 t ADT: 17,867

PARKER ST

Fair

Over: UNION PACIFIC RAILROAD

0.2 MI N OF US 80, Harrison, TX

Built 1982 Load: 30.8 t ADT: 2,529

FM 2625

Fair

Over: POTTERS CREEK

0.9 MI NE OF SH 43, Harrison, TX

Built 1963 Load: 31.7 t ADT: 644

FM 2625

Fair

Over: EIGHT MILE CREEK

2.15 MI NE OF US 59, Harrison, TX

Built 1964 Load: 31.7 t ADT: 1,131

LP 281 NB

Fair

Over: UNION PACIFIC RAILROAD

0.20 MI S OF US 80, Harrison, TX

Built 1967 Load: 31.7 t ADT: 6,727

SH 43

Fair

Over: SABINE RIVER

4.4 MI S OF FM 2625, Harrison, TX

Built 1996 Load: 32.7 t ADT: 3,390

SH 43

Fair

Over: SABINE RIVER RELIEF

3.3 MI S OF FM 2625, Harrison, TX

Built 1996 Load: 32.7 t ADT: 3,390

FM 134

Fair

Over: HARRISON BAYOU RELIEF

0.70 MI S OF FM 2682, Harrison, TX

Built 2009 Load: 32.7 t ADT: 1,025

FM 134

Fair

Over: DRAW

2.50 MI NW OF FM 1999, Harrison, TX

Built 2003 Load: 32.7 t ADT: 1,025

FM 2625

Fair

Over: POTTERS CREEK RELIEF

0.75 MI NE OF SH 43, Harrison, TX

Built 1963 Load: 32.7 t ADT: 644

FM 968

Fair

Over: UNION PACIFIC RAILROAD

1.30 MI S OF US 80, Harrison, TX

Built 1983 Load: 32.7 t ADT: 1,648

N BOLIVAR ST

Fair

Over: UNION PACIFIC RAILROAD

0.2 MI N OF US 80, Harrison, TX

Built 1982 Load: 32.7 t ADT: 3,290

US 59 SB

Fair

Over: LITTLE CYPRESS BYU REL

9.20 MI N OF LP 390, Harrison, TX

Built 1987 Load: 33.6 t ADT: 5,058

VIRGINIA ST

Fair

Over: UNION PACIFIC RAILROAD

1.0 MI E OF FRANKLIN ST, Harrison, TX

Built 1983 Load: 33.6 t ADT: 2,327

IH 20 NFR

Fair

Over: MASON CREEK

0.90 MI E OF LP 281, Harrison, TX

Built 1966 Load: 34.5 t ADT: 1,590

CR 1320

Fair

Over: CADDO CREEK

3.0 MI W OF FM 31, Harrison, TX

Built 1992 Load: 34.5 t ADT: 35

US 59 NB

Fair

Over: SABINE RIVER

4.1 MI S OF FM 1186, Harrison, TX

Built 1970 Load: 35.4 t ADT: 3,754

US 59 SB

Fair

Over: SABINE RIVER

4.1 MI S OF FM 1186, Harrison, TX

Built 1970 Load: 35.4 t ADT: 4,528

IH 20 WB

Fair

Over: CLARKS CREEK

3.70 MI E OF LP 281, Harrison, TX

Built 1966 Load: 37.2 t ADT: 14,802

IH 20 WB

Fair

Over: FERGUSON CREEK

1.95 MI W OF LP 281, Harrison, TX

Built 1966 Load: 39.0 t ADT: 19,398

IH 20 EB

Fair

Over: FERGUSON CREEK

1.95 MI W OF LP 281, Harrison, TX

Built 1966 Load: 39.0 t ADT: 19,094

IH 20 EB

Fair

Over: CLARKS CREEK

3.70 MI E OF LP 281, Harrison, TX

Built 1966 Load: 39.0 t ADT: 14,667

IH 20 EB

Fair

Over: SEWELL CREEK

2.85 MI E OF FM 450, Harrison, TX

Built 1965 Load: 39.9 t ADT: 14,667

Related

Data sourced from official U.S. government datasets. See our methodology for details. Retrieved and formatted by PlainBridges Editorial