Harrison County, TX

269 public highway bridges

Harrison County Bridge Snapshot

According to the Federal Highway Administration's 2024 National Bridge Inventory, Harrison County, Texas contains 269 public highway bridges. Roughly 37.5% are rated “Good,” 47.6% “Fair,” and 2.6% “Poor.” Poor means the lowest applicable deck, superstructure, substructure, or culvert rating is 4 or below on the 0–9 NBI scale. It is a condition category, not a live safety or closure decision.

Responsible agencies inspect covered bridges on risk-based intervals under current NBIS rules and submit inventory data to FHWA annually. The list below shows every NBI-tracked bridge in the county. Use the “Sort by” controls to change the ordering, and click any row for its reported inspection date, traffic count, and condition fields.

Source: FHWA National Bridge Inventory. See methodology for full definitions.

269
Total Bridges
37.5%
Good
47.6%
Fair
2.6%
Poor Condition

Condition Distribution

Good
37.5% (101)
Fair
47.6% (128)
Poor
2.6% (7)

All Bridges (269)

BOMAR ST

Fair

Over: TURTLE CREEK

0.1 MI N OF SH 43, Harrison, TX

Built 1977 Load: 24.5 t ADT: 2,465

CIRCLE DR

Fair

Over: TURTLE CREEK

0.2 MI E OF S GARRETT, Harrison, TX

Built 1950 Load: 24.5 t ADT: 164

ELYSIAN FIELDS AVE

Fair

Over: PARKER CREEK

0.05 MI E OF US 59, Harrison, TX

Built 1955 Load: 24.5 t ADT: 2,316

N. FRANKLIN ST

Fair

Over: PARKER CREEK

0.20 MI N OF US 80, Harrison, TX

Built 1950 Load: 24.5 t ADT: 500

GAIL DR

Fair

Over: TURTLE CREEK

0.2 MI S OF MEREDITH ST, Harrison, TX

Built 1950 Load: 24.5 t ADT: 109

S GARRETT ST

Fair

Over: TURTLE CREEK

0.07 MI N OF SH 43, Harrison, TX

Built 1977 Load: 24.5 t ADT: 2,961

HAZELWOOD ST

Fair

Over: DRAINAGE DITCH

0.05 MI N OF HOUSTON ST, Harrison, TX

Built 1989 Load: 24.5 t ADT: 361

MAVERICK DR

Fair

Over: TURTLE CREEK

0.1 MI N OF SH 43, Harrison, TX

Built 1986 Load: 24.5 t ADT: 2,071

ROSBOROUGH SPR RD

Fair

Over: TURTLE CREEK

0.2 MI N OF SH 43, Harrison, TX

Built 1977 Load: 24.5 t ADT: 3,413

TURTLE CREEK DR

Fair

Over: TURTLE CREEK

.04 MI S OF ST FRANCIS ST, Harrison, TX

Built 1977 Load: 24.5 t ADT: 147

S WASHINGTON AVE

Fair

Over: TURTLE CREEK

0.1 MI N OF SH 43, Harrison, TX

Built 1965 Load: 24.5 t ADT: 5,772

CR 4106

Fair

Over: BEAR CREEK

1.9 MI NE OF SH 154, Harrison, TX

Built 2004 Load: 25.4 t ADT: 237

OWENS CORNER RD

Fair

Over: PICNITT CREEK

3.9 MI SE OF FM 1793, Harrison, TX

Built 1993 Load: 25.4 t ADT: 100

CR 3321-TALLY RD

Fair

Over: SABINE RIVER TRIBUTARY

1.4 MI S OF IH 20, Harrison, TX

Built 1994 Load: 25.4 t ADT: 78

FM 1186

Fair

Over: EIGHT MILE CREEK

1.35 MI SE OF US 59, Harrison, TX

Built 1951 Load: 26.3 t ADT: 661

SH 43

Fair

Over: POTTERS CREEK

2.5 MI S OF IH 20, Harrison, TX

Built 1930 Load: 26.3 t ADT: 3,235

FM 1998

Fair

Over: HARRISON BAYOU

2.85 MI W OF FM 134, Harrison, TX

Built 1920 Load: 26.3 t ADT: 532

CR 2401

Fair

Over: BECKUM CREEK

0.5 MI N OF FM 134, Harrison, TX

Built 1989 Load: 26.3 t ADT: 106

CR 1114

Fair

Over: CROSS BAYOU

1.0 MI S OF IH 20, Harrison, TX

Built 2001 Load: 26.3 t ADT: 518

AVENUE 'Q'

Fair

Over: Harrison Bayou

2.3 MI. E of HQ, Harrison, TX

Built 1950 Load: 28.1 t ADT: 40

LP 281 SB

Fair

Over: UNION PACIFIC RAILROAD

0.20 MI S OF US 80, Harrison, TX

Built 1967 Load: 28.1 t ADT: 6,796

AVENUE 'Q'

Fair

Over: UNNAMED DRAINAGE

2.3 MI. E of HQ, Harrison, TX

Built 1950 Load: 29.0 t ADT: 40

AVENUE 'Q'

Fair

Over: UNNAMED DRAINAGE

2.3 MI. E of HQ, Harrison, TX

Built 1950 Load: 29.0 t ADT: 40

FM 31

Fair

Over: EIGHT MILE CREEK

0.10 MI NW OF IH 20, Harrison, TX

Built 1938 Load: 29.0 t ADT: 4,200

PETERS CHAPEL RD

Fair

Over: PICNITT CREEK

2.5 MI SE OF FM 1793, Harrison, TX

Built 1996 Load: 29.0 t ADT: 2

IH 20 EB

Fair

Over: EIGHT MILE CREEK

3.40 MI E OF US 59, Harrison, TX

Built 1965 Load: 29.9 t ADT: 17,422

IH 20 EB

Fair

Over: PARKER CREEK

1.80 MI E OF US 59, Harrison, TX

Built 1965 Load: 30.8 t ADT: 17,422

IH 20 WB

Fair

Over: PARKER CREEK

1.80 MI E OF US 59, Harrison, TX

Built 1965 Load: 30.8 t ADT: 17,867

PARKER ST

Fair

Over: UNION PACIFIC RAILROAD

0.2 MI N OF US 80, Harrison, TX

Built 1982 Load: 30.8 t ADT: 2,529

FM 2625

Fair

Over: POTTERS CREEK

0.9 MI NE OF SH 43, Harrison, TX

Built 1963 Load: 31.7 t ADT: 644

FM 2625

Fair

Over: EIGHT MILE CREEK

2.15 MI NE OF US 59, Harrison, TX

Built 1964 Load: 31.7 t ADT: 1,131

LP 281 NB

Fair

Over: UNION PACIFIC RAILROAD

0.20 MI S OF US 80, Harrison, TX

Built 1967 Load: 31.7 t ADT: 6,727

SH 43

Fair

Over: SABINE RIVER

4.4 MI S OF FM 2625, Harrison, TX

Built 1996 Load: 32.7 t ADT: 3,390

SH 43

Fair

Over: SABINE RIVER RELIEF

3.3 MI S OF FM 2625, Harrison, TX

Built 1996 Load: 32.7 t ADT: 3,390

FM 134

Fair

Over: HARRISON BAYOU RELIEF

0.70 MI S OF FM 2682, Harrison, TX

Built 2009 Load: 32.7 t ADT: 1,025

FM 134

Fair

Over: DRAW

2.50 MI NW OF FM 1999, Harrison, TX

Built 2003 Load: 32.7 t ADT: 1,025

FM 2625

Fair

Over: POTTERS CREEK RELIEF

0.75 MI NE OF SH 43, Harrison, TX

Built 1963 Load: 32.7 t ADT: 644

FM 968

Fair

Over: UNION PACIFIC RAILROAD

1.30 MI S OF US 80, Harrison, TX

Built 1983 Load: 32.7 t ADT: 1,648

N BOLIVAR ST

Fair

Over: UNION PACIFIC RAILROAD

0.2 MI N OF US 80, Harrison, TX

Built 1982 Load: 32.7 t ADT: 3,290

US 59 SB

Fair

Over: LITTLE CYPRESS BYU REL

9.20 MI N OF LP 390, Harrison, TX

Built 1987 Load: 33.6 t ADT: 5,058

VIRGINIA ST

Fair

Over: UNION PACIFIC RAILROAD

1.0 MI E OF FRANKLIN ST, Harrison, TX

Built 1983 Load: 33.6 t ADT: 2,327

IH 20 NFR

Fair

Over: MASON CREEK

0.90 MI E OF LP 281, Harrison, TX

Built 1966 Load: 34.5 t ADT: 1,590

CR 1320

Fair

Over: CADDO CREEK

3.0 MI W OF FM 31, Harrison, TX

Built 1992 Load: 34.5 t ADT: 35

US 59 NB

Fair

Over: SABINE RIVER

4.1 MI S OF FM 1186, Harrison, TX

Built 1970 Load: 35.4 t ADT: 3,754

US 59 SB

Fair

Over: SABINE RIVER

4.1 MI S OF FM 1186, Harrison, TX

Built 1970 Load: 35.4 t ADT: 4,528

IH 20 WB

Fair

Over: CLARKS CREEK

3.70 MI E OF LP 281, Harrison, TX

Built 1966 Load: 37.2 t ADT: 14,802

IH 20 WB

Fair

Over: FERGUSON CREEK

1.95 MI W OF LP 281, Harrison, TX

Built 1966 Load: 39.0 t ADT: 19,398

IH 20 EB

Fair

Over: FERGUSON CREEK

1.95 MI W OF LP 281, Harrison, TX

Built 1966 Load: 39.0 t ADT: 19,094

IH 20 EB

Fair

Over: CLARKS CREEK

3.70 MI E OF LP 281, Harrison, TX

Built 1966 Load: 39.0 t ADT: 14,667

IH 20 EB

Fair

Over: SEWELL CREEK

2.85 MI E OF FM 450, Harrison, TX

Built 1965 Load: 39.9 t ADT: 14,667
Data sourced from official public datasets. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.