Madison County, TX

121 public highway bridges

Madison County Bridge Snapshot

Madison County, Texas contains 121 public highway bridges in the FHWA National Bridge Inventory. Roughly 28.1% are rated “Good,” 60.3% “Fair,” 3.3% “Poor,” and 3.3% are classified as structurally deficient — the federal designation for spans whose deck, superstructure, or substructure has been rated 4 or below on the 0–9 NBI scale. Structurally deficient does not mean unsafe to cross; it means the bridge is on the priority list for repair or replacement.

Inspections in TX are conducted by certified engineers from the state Department of Transportation on a 24-month cycle, and results are reported back to the FHWA each spring. The list below shows every NBI-tracked bridge in the county, sorted by inventory load rating. Use the “Sort by” controls to surface the lowest-rated spans first, and click any row for full inspection history, traffic counts, and condition trends.

Source: FHWA National Bridge Inventory. See methodology for full definitions.

121
Total Bridges
28.1%
Good
3.3%
Poor
3.3%
Structurally Deficient

Condition Distribution

Good
28.1% (34)
Fair
60.3% (73)
Poor
3.3% (4)
SD
3.3% (4)

All Bridges (121)

FM 39

Unknown

Over: FM 39

1.75 MI N OF FM 1372, Madison, TX

Built 1950 ADT: 10,590

IH 45 SB

Unknown

Over: IH 45 SB

4.1 MI NW OF SH 21, Madison, TX

Built 1964 ADT: 4,476

IH 45 NB

Unknown

Over: IH 45 NB

4.1 MI NW OF SH 21, Madison, TX

Built 1964 ADT: 4,476

IH 45 NB

Unknown

Over: IH 45 NB

2.05 MI SE OF SH 21, Madison, TX

Built 1964 ADT: 276

IH 45 SB

Unknown

Over: IH 45 SB

2.05 MI SE OF SH 21, Madison, TX

Built 1964 ADT: 276

SP 67

Unknown

Over: SP 67

5.35 MI SE OF SH 21, Madison, TX

Built 1964 ADT: 32,714

OSR

Unknown

Over: OSR

2.25 MI W OF SH 75, Madison, TX

Built 1965 ADT: 40,321

HENDRIX RD

Unknown

Over: Hendrix Rd.

1.6 MI S OF OSR, Madison, TX

Built 1965 ADT: 40,321

WALDRIP RD

Unknown

Over: Waldrip Rd.

2.75 MI NW OF SH 75, Madison, TX

Built 1965 ADT: 40,321

SH 21

Unknown

Over: SH 21

4.05 MI SE OF SH 75, Madison, TX

Built 1964 ADT: 38,194

TRINITY ST

Fair

Over: TOWN BRANCH

0.1 MI SW OF SH 75, Madison, TX

Built 1999 ADT: 2,000

STEWART RD

Fair

Over: SHEPHERD CREEK

1.3 MI W OF FM 39, Madison, TX

Built 1940 Load: 10.9 t ADT: 60

ELM ST

Fair

Over: TOWN BRANCH

0.3 MI S OF US 190, Madison, TX

Built 1999 Load: 18.1 t ADT: 549

HARDY RD

Fair

Over: IRON CREEK

1.71 MI SE OF FM 1452, Madison, TX

Built 2004 Load: 19.0 t ADT: 80

GRANT RD

Fair

Over: IRON CREEK

0.6 MI E OF FM 1372, Madison, TX

Built 1940 Load: 20.0 t ADT: 90

SH 21

Fair

Over: LARRISON CRK RELIEF NO 2

3.38 MI NE OF FM 1428, Madison, TX

Built 1968 Load: 21.0 t ADT: 5,633

US 190

Fair

Over: SMALL (SAND) BRANCH

0.25 MI E OF FM 2865, Madison, TX

Built 1931 Load: 23.6 t ADT: 9,225

US 190

Fair

Over: SHEPHERD CREEK

1.0 MI NE OF FM 2865, Madison, TX

Built 1963 Load: 23.6 t ADT: 9,225

US 190

Fair

Over: DRY BRANCH

1.2 MI E OF FM 39, Madison, TX

Built 1931 Load: 23.6 t ADT: 5,623

US 190

Fair

Over: FOARDS BRANCH

3.7 MI E OF FM 39, Madison, TX

Built 1931 Load: 23.6 t ADT: 5,623

US 190

Fair

Over: KICKAPOO CREEK

1.8 MI E OF FM 39, Madison, TX

Built 1963 Load: 23.6 t ADT: 5,623

US 190

Fair

Over: TOWN BRANCH

0.04 MI W OF SH 75, Madison, TX

Built 1927 Load: 23.6 t ADT: 9,448

SH 21

Fair

Over: LARRISON CREEK RELIEF

2.7 MI NE OF FM 1428, Madison, TX

Built 1927 Load: 23.6 t ADT: 4,991

SH 21

Fair

Over: IVEY CREEK

1.75 MI NE OF FM 247, Madison, TX

Built 1930 Load: 23.6 t ADT: 3,072

SH 21

Fair

Over: CEDAR LAKE BRANCH

1.9 MI NE OF FM 247, Madison, TX

Built 1930 Load: 23.6 t ADT: 3,072

SH 21

Fair

Over: YOUNGS CREEK

2.4 MI NE OF FM 247, Madison, TX

Built 1930 Load: 23.6 t ADT: 3,072

SH 90

Fair

Over: IRON CREEK RELIEF NO 1

1.75 MI SW OF FM 1452, Madison, TX

Built 1932 Load: 23.6 t ADT: 3,553

SH 90

Fair

Over: IRON CREEK RELIEF NO 2

2.0 MI SW OF FM 1452, Madison, TX

Built 1932 Load: 23.6 t ADT: 3,553

SH 90

Fair

Over: BEDIAS CREEK RELIEF

3.05 MI SW OF FM 1452, Madison, TX

Built 1932 Load: 23.6 t ADT: 3,553

SH 90

Fair

Over: BEDIAS CREEK RELIEF

3.2 MI SW OF FM 1452, Madison, TX

Built 1932 Load: 23.6 t ADT: 3,553

SP 174

Fair

Over: TOWN BRANCH

0.2 MI S OF US 190, Madison, TX

Built 1954 Load: 23.6 t ADT: 2,230

OSR

Fair

Over: SALT BRANCH SLOUGH

1.1 MI NE OF FM 2289, Madison, TX

Built 1958 Load: 23.6 t ADT: 1,273

OSR

Fair

Over: SALT CREEK

1.3 MI NE OF FM 2289, Madison, TX

Built 1958 Load: 23.6 t ADT: 1,273

OSR

Fair

Over: CANEY CREEK RELIEF

0.65 MI NE OF FM 39, Madison, TX

Built 1990 Load: 23.6 t ADT: 1,559

FM 978

Fair

Over: IRON CREEK

0.75 MI E OF FM 39, Madison, TX

Built 1951 Load: 23.6 t ADT: 212

FM 3060

Fair

Over: IVEY CREEK

0.95 MI N OF SH 21, Madison, TX

Built 1968 Load: 23.6 t ADT: 336

FM 3060

Fair

Over: PETITT CK(CEDAR LAKE BR)

1.65 MI N OF SH 21, Madison, TX

Built 1968 Load: 23.6 t ADT: 336

IH 45

Fair

Over: DRAW

0.53 MI S OF OSR, Madison, TX

Built 1965 Load: 23.6 t ADT: 40,321

IH 45

Fair

Over: DRAW

0.75 MI S OF OSR, Madison, TX

Built 1965 Load: 23.6 t ADT: 40,321

IH 45

Fair

Over: DRAW

2.25 MI S OF OSR, Madison, TX

Built 1965 Load: 23.6 t ADT: 40,321

FM 2346

Fair

Over: HARBUCK CREEK

1.85 MI S OF OSR, Madison, TX

Built 1957 Load: 23.6 t ADT: 548

FM 2346

Fair

Over: WESTMORELAND BRANCH

3.55 MI S OF OSR, Madison, TX

Built 1957 Load: 23.6 t ADT: 1,043

FM 1372

Fair

Over: KICKAPOO CREEK RELIEF

2.95 MI S OF US 190, Madison, TX

Built 1959 Load: 23.6 t ADT: 344

FM 1452

Fair

Over: CANEY TRIBUTARY

2.4 MI S OF OSR, Madison, TX

Built 1979 Load: 23.6 t ADT: 462

FM 3091

Fair

Over: LARRISON CREEK

2.3 MI NE OF IH 45, Madison, TX

Built 1969 Load: 23.6 t ADT: 100

FM 2865

Fair

Over: SANDY CK (SAND BRANCH)

0.6 MI N OF US 190, Madison, TX

Built 1971 Load: 23.6 t ADT: 231

SH 21

Fair

Over: DRAW

4.2 MI E OF FM 1428, Madison, TX

Built 1926 Load: 24.5 t ADT: 5,633

SH 21

Fair

Over: DRAW

1.8 MI NE OF IH 45, Madison, TX

Built 1926 Load: 24.5 t ADT: 4,991

SH 75

Fair

Over: TOWN (BRANCH) CREEK

0.05 MI N OF US 190, Madison, TX

Built 1929 Load: 24.5 t ADT: 8,897

SH 75

Fair

Over: N BEDIAS CREEK

3.05 MI SE OF SP 67, Madison, TX

Built 1947 Load: 24.5 t ADT: 1,020

Related

Data sourced from official U.S. government datasets. See our methodology for details. Retrieved and formatted by PlainBridges Editorial