Navarro County, TX

345 public highway bridges

Navarro County Bridge Snapshot

Navarro County, Texas contains 345 public highway bridges in the FHWA National Bridge Inventory. Roughly 34.5% are rated “Good,” 55.9% “Fair,” 1.2% “Poor,” and 1.2% are classified as structurally deficient — the federal designation for spans whose deck, superstructure, or substructure has been rated 4 or below on the 0–9 NBI scale. Structurally deficient does not mean unsafe to cross; it means the bridge is on the priority list for repair or replacement.

Inspections in TX are conducted by certified engineers from the state Department of Transportation on a 24-month cycle, and results are reported back to the FHWA each spring. The list below shows every NBI-tracked bridge in the county, sorted by inventory load rating. Use the “Sort by” controls to surface the lowest-rated spans first, and click any row for full inspection history, traffic counts, and condition trends.

Source: FHWA National Bridge Inventory. See methodology for full definitions.

345
Total Bridges
34.5%
Good
1.2%
Poor
1.2%
Structurally Deficient

Condition Distribution

Good
34.5% (119)
Fair
55.9% (193)
Poor
1.2% (4)
SD
1.2% (4)

All Bridges (345)

SH 31 EB

Good

Over: Abandoned RR Spur

18.8 MI E OF IH45, Navarro, TX

Built 1971 Load: 25.4 t ADT: 3,737

FM 744

Good

Over: RICHLAND CREEK

0.30 MI E OF FM 1946, Navarro, TX

Built 1963 Load: 26.3 t ADT: 247

IH45 EFR

Good

Over: MESQUITE CREEK

3.45 MI N OF FM 246, Navarro, TX

Built 1968 Load: 29.9 t ADT: 100

FM 636

Good

Over: WILLOW CREEK

1.80 MI E OF FM 1129, Navarro, TX

Built 1953 Load: 29.9 t ADT: 146

IH 45 WFR

Good

Over: BRIAR CRK

3.60 MI N OF SH 31, Navarro, TX

Built 1964 Load: 31.7 t ADT: 100

FM 744

Good

Over: WOLF CREEK

0.70 MI E OF FM 1578, Navarro, TX

Built 1957 Load: 31.7 t ADT: 754

IH45 ML

Good

Over: CHAMBERS CREEK RELIEF

4.50 MI N OF SH 31, Navarro, TX

Built 2000 Load: 32.7 t ADT: 48,460

IH45 ML

Good

Over: CHAMBERS CREEK

5.00 MI N OF SH 31, Navarro, TX

Built 2000 Load: 32.7 t ADT: 48,460

IH 45 SBFR

Good

Over: POST OAK CREEK

0.25 MI N OF SH 31, Navarro, TX

Built 2000 Load: 32.7 t ADT: 2,366

IH 45 NBML

Good

Over: UPRR

0.2 MI S OF SH 31, Navarro, TX

Built 2003 Load: 32.7 t ADT: 21,826

IH 45 NB EXIT RAMP

Good

Over: UPRR

0.20 MI S OF SH 31, Navarro, TX

Built 2003 Load: 32.7 t ADT: 13,950

IH 45 SBML

Good

Over: UPRR

0.20 MI S OF SH 31, Navarro, TX

Built 2003 Load: 32.7 t ADT: 20,936

BUS 45 SB

Good

Over: Briar Creek

0.45 Mi S of IH 45, Navarro, TX

Built 2020 Load: 32.7 t ADT: 5,654

BUS 45 NB

Good

Over: Draw

0.10 Mi S of IH 45, Navarro, TX

Built 2021 Load: 32.7 t ADT: 8,170

BUS 45 NB

Good

Over: Briar Creek

0.25 Mi S of IH 45, Navarro, TX

Built 2021 Load: 32.7 t ADT: 8,170

BUS 45 SB

Good

Over: Draw

0.30 Mi S of IH 45, Navarro, TX

Built 2020 Load: 32.7 t ADT: 5,654

IH 45 NB ML

Good

Over: MESQUITE CRK

0.85 MI S OF SH 31, Navarro, TX

Built 1964 Load: 32.7 t ADT: 21,826

IH 45 SB ML

Good

Over: MESQUITE CRK

0.85 MI S OF SH 31, Navarro, TX

Built 1964 Load: 32.7 t ADT: 20,936

IH 45 NB

Good

Over: BNSF RR

1.50 MI S OF SH 31, Navarro, TX

Built 1997 Load: 32.7 t ADT: 21,826

IH 45 SB

Good

Over: BNSF RR

1.50 MI S OF SH 31, Navarro, TX

Built 1997 Load: 32.7 t ADT: 20,936

IH 45 SB ML

Good

Over: RICHLAND CREEK

1.30 MI N OF SH 14, Navarro, TX

Built 2005 Load: 32.7 t ADT: 19,226

IH 45 SB ML

Good

Over: RICHLAND CREEK RELIEF

0.60 MI N OF SH 14, Navarro, TX

Built 2005 Load: 32.7 t ADT: 19,226

IH 45 NB ML

Good

Over: RICHLAND CREEK RELIEF

0.60 MI N OF SH 14, Navarro, TX

Built 2005 Load: 32.7 t ADT: 20,267

SH 14

Good

Over: UPRR

2.70 MI S OF IH45, Navarro, TX

Built 2016 Load: 32.7 t ADT: 4,900

SH 31 WB

Good

Over: POST OAK CREEK

17.60 MI NW OF IH 45, Navarro, TX

Built 1999 Load: 32.7 t ADT: 3,169

SH 31 WB

Good

Over: POST OAK CREEK RELIEF

17.40 MI W OF IH 45, Navarro, TX

Built 1999 Load: 32.7 t ADT: 3,169

SH 31 EB

Good

Over: RICHLAND CREEK

6.40 MI NE OF HILL C/L, Navarro, TX

Built 2005 Load: 32.7 t ADT: 2,842

SH 31 EB

Good

Over: RICHLAND CREEK RELIEF

6.60 MI NE OF HILL C/L, Navarro, TX

Built 2005 Load: 32.7 t ADT: 2,842

SH 31 EB

Good

Over: POST OAK CREEK

17.60 MI W OF IH 45, Navarro, TX

Built 2005 Load: 32.7 t ADT: 2,929

SH 31 EB

Good

Over: POST OAK CREEK RELIEF

17.40 MI W OF IH 45, Navarro, TX

Built 2005 Load: 32.7 t ADT: 2,929

SH 31 WB

Good

Over: RUSH CREEK

3.95 MI NE OF FM 55, Navarro, TX

Built 2006 Load: 32.7 t ADT: 2,838

SH 31 WB

Good

Over: RUSH CREEK RELIEF NO. 1

3.65 MI NE OF FM 55S, Navarro, TX

Built 2007 Load: 32.7 t ADT: 2,838

SH 31 WB

Good

Over: CEDAR CREEK

7.45 MI W OF IH 45, Navarro, TX

Built 2010 Load: 32.7 t ADT: 8,490

FM 709

Good

Over: RICHLAND CREEK RELIEF

0.25 MI S OF FM 2452, Navarro, TX

Built 1993 Load: 32.7 t ADT: 1,065

FM 709

Good

Over: DRAW

3.45 MI N OF FM 2555, Navarro, TX

Built 2008 Load: 32.7 t ADT: 6,789

SH31

Good

Over: BNSF Railroad

3.84 MI SW of SH 31 BUS, Navarro, TX

Built 2020 Load: 32.7 t ADT: 2,600

SH 31

Good

Over: Harris Branch

0.67 MI W of BUS FM 2555, Navarro, TX

Built 2020 Load: 32.7 t ADT: 6,818

SH 31

Good

Over: UPRR Ennis Sub

0.3 MI W of IH 45, Navarro, TX

Built 2020 Load: 32.7 t ADT: 6,818

SH 31 EB

Good

Over: INDIAN CREEK

13.8 MI E OF IH 45, Navarro, TX

Built 2000 Load: 32.7 t ADT: 3,103

SH 31 EB

Good

Over: COW CREEK

14.6 MI E OF IH 45, Navarro, TX

Built 2000 Load: 32.7 t ADT: 3,103

SH 309

Good

Over: DRAW

3.50 MI SE OF SH 31, Navarro, TX

Built 2013 Load: 32.7 t ADT: 863

SH 309

Good

Over: RUSH CREEK RELIEF

2.55 MI SE OF SH 31, Navarro, TX

Built 2013 Load: 32.7 t ADT: 1,230

SH 309

Good

Over: RUSH CREEK RELIEF

2.50 MI SE OF SH 31, Navarro, TX

Built 2013 Load: 32.7 t ADT: 1,230

SH 309

Good

Over: RUSH CREEK

2.3 MI S OF SH 31, Navarro, TX

Built 2019 Load: 32.7 t ADT: 1,300

SH 309

Good

Over: RUSH CREEK RELIEF

2.2 MI S OF SH 31, Navarro, TX

Built 2019 Load: 32.7 t ADT: 1,300

FM 637

Good

Over: CEDAR CREEK

5.80 MI E OF HWY 287, Navarro, TX

Built 2022 Load: 32.7 t ADT: 255

FM 638

Good

Over: PIN OAK CREEK

0.25 MI N OF LIMESTONE CL, Navarro, TX

Built 1996 Load: 32.7 t ADT: 208

FM 638

Good

Over: PIN OAK SLOUGH

0.65 MI N OF LIMESTONE CL, Navarro, TX

Built 2011 Load: 32.7 t ADT: 208

FM 638

Good

Over: PIN OAK RELIEF

0.7 MI N OF LIMESTONE CL, Navarro, TX

Built 2012 Load: 32.7 t ADT: 208

FM 744

Good

Over: HARRIS BRANCH CREEK

1.80 MI E OF FM 639, Navarro, TX

Built 1996 Load: 32.7 t ADT: 247

Related

Data sourced from official U.S. government datasets. See our methodology for details. Retrieved and formatted by PlainBridges Editorial