Nueces County, TX

528 public highway bridges

Nueces County Bridge Snapshot

According to the Federal Highway Administration's 2024 National Bridge Inventory, Nueces County, Texas contains 528 public highway bridges. Roughly 37.3% are rated “Good,” 28.2% “Fair,” and 0.8% “Poor.” Poor means the lowest applicable deck, superstructure, substructure, or culvert rating is 4 or below on the 0–9 NBI scale. It is a condition category, not a live safety or closure decision.

Responsible agencies inspect covered bridges on risk-based intervals under current NBIS rules and submit inventory data to FHWA annually. The list below shows every NBI-tracked bridge in the county. Use the “Sort by” controls to change the ordering, and click any row for its reported inspection date, traffic count, and condition fields.

Source: FHWA National Bridge Inventory. See methodology for full definitions.

528
Total Bridges
37.3%
Good
28.2%
Fair
0.8%
Poor Condition

Condition Distribution

Good
37.3% (197)
Fair
28.2% (149)
Poor
0.8% (4)

All Bridges (528)

SCHANEN BLVD

Good

Over: SCHANEN DRAIN

0.5 MI SE OF FM 43, Nueces, TX

Built 1965 Load: 24.5 t ADT: 3,822

MONK DRIVE

Good

Over: DRAINAGE DITCH

0.1 N OF HOLIDAY LN, Nueces, TX

Built 2005 Load: 24.5 t ADT: 50

RODD FIELD RD.

Good

Over: DRAINAGE DITCH

0.05 MI S OF BROOKE RD, Nueces, TX

Built 2008 Load: 24.5 t ADT: 500

YORKTOWN ROAD

Good

Over: DRAINAGE DITCH

0.2 MI SE OF EVERHART, Nueces, TX

Built 1986 Load: 24.5 t ADT: 5,060

CIMARRON BLVD

Good

Over: DRAINAGE DITCH

0.3 MI N OF SARATOGA, Nueces, TX

Built 1984 Load: 24.5 t ADT: 8,800

CIMARRON BLVD.

Good

Over: DRAINAGE DITCH

0.1 MI S OF LIPES BLVD, Nueces, TX

Built 2000 Load: 24.5 t ADT: 1,000

CR 7B

Good

Over: DRAINAGE DITCH

0.5 MI E OF RODD FIELD RD, Nueces, TX

Built 2008 Load: 24.5 t ADT: 50

EDINBURG CIRCLE

Good

Over: DRAINAGE DITCH

AT INTER OF NORTHGATE, Nueces, TX

Built 1983 Load: 24.5 t ADT: 1,000

WARRIOR DRIVE

Good

Over: DRAINAGE DITCH

AT HORSESHOE DR, Nueces, TX

Built 1985 Load: 24.5 t ADT: 2,270

CRICKET HOLLOW

Good

Over: DRAINAGE DITCH

AT WILDEROCK, Nueces, TX

Built 1985 Load: 24.5 t ADT: 2,115

SERVICE CENTER RD

Good

Over: DRAINAGE DITCH

0.3 MI E OF AYERS ST, Nueces, TX

Built 1984 Load: 24.5 t ADT: 2,850

TEXAS YES BLVD

Good

Over: DRAINAGE DITCH

0.10 MI E OF US 77, Nueces, TX

Built 1993 Load: 24.5 t ADT: 500

CR 36

Good

Over: Drainage Ditch

0.47 MI W of US 77, Nueces, TX

Built 2020 Load: 24.5 t ADT: 804

CR 36

Good

Over: N.C. DRAINAGE DITCH #2

1.00 MI E OF US 77, Nueces, TX

Built 2010 Load: 24.5 t ADT: 150

SH 44 WB

Good

Over: BANQUETE CREEK

1.00 MI E OF FM 666, Nueces, TX

Built 1940 Load: 27.2 t ADT: 4,757

FM 665

Good

Over: DRAINAGE DITCH

5.65 MI E OF US 77, Nueces, TX

Built 1958 Load: 28.1 t ADT: 7,465

FM 665

Good

Over: LA JOLLA CREEK

0.7 MI NE OF SH 357, Nueces, TX

Built 1961 Load: 29.0 t ADT: 6,000

IH 37 SBML

Good

Over: Nueces River

0.3 MI S OF US 77, Nueces, TX

Built 2023 Load: 32.7 t ADT: 56,374

IH 37 NBFR

Good

Over: Brownlee Blvd

at SH 286 Interchange, Nueces, TX

Built 2020 Load: 32.7 t ADT: 1,238

IH 37 NBFR NW Loop

Good

Over: Open

0.01 Mile N. of M.L. Dr., Nueces, TX

Built 2021 Load: 32.7 t ADT: 11,814

IH 37 SB to SH 286

Good

Over: Leopard St SBFR 286

IH 37 & SH 286 I/C, Nueces, TX

Built 2022 Load: 32.7 t ADT: 6,230

IH 37 NW Loop

Good

Over: Salt Flats

0.13 Mile N. of M.L. Dr., Nueces, TX

Built 2021 Load: 32.7 t ADT: 11,814

IH 37 NBML

Good

Over: US 181

at SH 286 Interchange, Nueces, TX

Built 2023 Load: 32.7 t ADT: 60,268

SH 44 WBFR

Good

Over: OSO CREEK

0.65 MI E OF FM 24, Nueces, TX

Built 1990 Load: 32.7 t ADT: 9,892

SH 44 EBFR

Good

Over: OSO CREEK

0.65 MI E OF FM 24, Nueces, TX

Built 1998 Load: 32.7 t ADT: 9,968

SH 44

Good

Over: DRAINAGE DITCH

At Int. FM 2292, Nueces, TX

Built 2006 Load: 32.7 t ADT: 3,132

SH 44 EBML

Good

Over: Oso Creek

3.85 MI E OF IH 69E, Nueces, TX

Built 2022 Load: 32.7 t ADT: 19,860

SH 44 WBML

Good

Over: Oso Creek

3.82 MI E OF IH 69E, Nueces, TX

Built 2022 Load: 32.7 t ADT: 19,860

US 77 SBFR

Good

Over: DRAIN

0.5 MI N OF FM 2826, Nueces, TX

Built 2018 Load: 32.7 t ADT: 5,000

US 77 NBFR

Good

Over: DRAIN

0.5 MI N OF FM 2826, Nueces, TX

Built 2018 Load: 32.7 t ADT: 5,000

US 77 NB

Good

Over: DRAIN

0.55 MI N OF FM 2826, Nueces, TX

Built 2018 Load: 32.7 t ADT: 8,410

US 77 NB

Good

Over: Drainage DItch

3.0 MI NE OF FM 665, Nueces, TX

Built 2021 Load: 32.7 t ADT: 21,663

NBFR US 77

Good

Over: Drainage Ditch

3.0 MI NE OF FM 665, Nueces, TX

Built 2021 Load: 32.7 t ADT: 2,150

US 77 ML

Good

Over: Bishop Creek

0, Nueces, TX

Built 2018 Load: 32.7 t ADT: 19,300

US 77 NBFR

Good

Over: Drain

11.4 MI. S. of TX-44, Nueces, TX

Built 2022 Load: 32.7 t ADT: 21,608

US 77 NB

Good

Over: Petronila Creek

0.5 MI NE OF FM 665, Nueces, TX

Built 2021 Load: 32.7 t ADT: 21,663

US 77 SBML

Good

Over: Petronila Creek

0.5 MI NE OF FM 665, Nueces, TX

Built 2023 Load: 32.7 t ADT: 19,460

SH 286 NBFR

Good

Over: OSO CREEK

1.25 MI S OF SH 357, Nueces, TX

Built 1988 Load: 32.7 t ADT: 19,582

SH 286 SB

Good

Over: OSO CREEK

0.6 MI NE OF SH 43, Nueces, TX

Built 2017 Load: 32.7 t ADT: 9,886

SH 286 NB

Good

Over: OSO CREEK

0.6 MI NE OF SH 43, Nueces, TX

Built 2017 Load: 32.7 t ADT: 9,696

US 77

Good

Over: DRAW

1.9 MI S OF FM 624, Nueces, TX

Built 2006 Load: 32.7 t ADT: 19,131

US 77

Good

Over: DRAW

1.4 MI S OF FM 624, Nueces, TX

Built 2006 Load: 32.7 t ADT: 19,631

SH 44 EB

Good

Over: AGUA DULCE CREEK

1.45 MI W OF FM 666, Nueces, TX

Built 1975 Load: 32.7 t ADT: 4,554

SH 44 EB

Good

Over: BANQUETE CREEK

1.00 MI E OF FM 666, Nueces, TX

Built 1975 Load: 32.7 t ADT: 4,943

SH 286 NB RAMP M

Good

Over: PEDESTRIAN

AT INTERCHANGE SH286/358, Nueces, TX

Built 2006 Load: 32.7 t ADT: 100,900

SH 286 SB RAMP C

Good

Over: PEDESTRIAN

AT INTERCHANGE SH286/358, Nueces, TX

Built 2006 Load: 32.7 t ADT: 100,900

PR 22 NB

Good

Over: Lake Padre Canal

0.5 Mi S of SH 361, Nueces, TX

Built 2022 Load: 32.7 t ADT: 19,559

PR 22 SB

Good

Over: Lake Padre Canal

0.5 MI SOUTH OF SH361, Nueces, TX

Built 2023 Load: 32.7 t ADT: 19,559

FM 666

Good

Over: CAYAMON CREEK RELIEF

1.20 MI N OF FM 624, Nueces, TX

Built 1988 Load: 32.7 t ADT: 2,159

FM 666

Good

Over: PINTAS CREEK

1.55 MI N OF FM 665, Nueces, TX

Built 1995 Load: 32.7 t ADT: 745
Data sourced from official public datasets. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.