Nueces County, TX

528 public highway bridges

Nueces County Bridge Snapshot

Nueces County, Texas contains 528 public highway bridges in the FHWA National Bridge Inventory. Roughly 37.3% are rated “Good,” 28.2% “Fair,” 0.8% “Poor,” and 0.8% are classified as structurally deficient — the federal designation for spans whose deck, superstructure, or substructure has been rated 4 or below on the 0–9 NBI scale. Structurally deficient does not mean unsafe to cross; it means the bridge is on the priority list for repair or replacement.

Inspections in TX are conducted by certified engineers from the state Department of Transportation on a 24-month cycle, and results are reported back to the FHWA each spring. The list below shows every NBI-tracked bridge in the county, sorted by inventory load rating. Use the “Sort by” controls to surface the lowest-rated spans first, and click any row for full inspection history, traffic counts, and condition trends.

Source: FHWA National Bridge Inventory. See methodology for full definitions.

528
Total Bridges
37.3%
Good
0.8%
Poor
0.8%
Structurally Deficient

Condition Distribution

Good
37.3% (197)
Fair
28.2% (149)
Poor
0.8% (4)
SD
0.8% (4)

All Bridges (528)

SCHANEN BLVD

Good

Over: SCHANEN DRAIN

0.5 MI SE OF FM 43, Nueces, TX

Built 1965 Load: 24.5 t ADT: 3,822

MONK DRIVE

Good

Over: DRAINAGE DITCH

0.1 N OF HOLIDAY LN, Nueces, TX

Built 2005 Load: 24.5 t ADT: 50

RODD FIELD RD.

Good

Over: DRAINAGE DITCH

0.05 MI S OF BROOKE RD, Nueces, TX

Built 2008 Load: 24.5 t ADT: 500

YORKTOWN ROAD

Good

Over: DRAINAGE DITCH

0.2 MI SE OF EVERHART, Nueces, TX

Built 1986 Load: 24.5 t ADT: 5,060

CIMARRON BLVD

Good

Over: DRAINAGE DITCH

0.3 MI N OF SARATOGA, Nueces, TX

Built 1984 Load: 24.5 t ADT: 8,800

CIMARRON BLVD.

Good

Over: DRAINAGE DITCH

0.1 MI S OF LIPES BLVD, Nueces, TX

Built 2000 Load: 24.5 t ADT: 1,000

CR 7B

Good

Over: DRAINAGE DITCH

0.5 MI E OF RODD FIELD RD, Nueces, TX

Built 2008 Load: 24.5 t ADT: 50

EDINBURG CIRCLE

Good

Over: DRAINAGE DITCH

AT INTER OF NORTHGATE, Nueces, TX

Built 1983 Load: 24.5 t ADT: 1,000

WARRIOR DRIVE

Good

Over: DRAINAGE DITCH

AT HORSESHOE DR, Nueces, TX

Built 1985 Load: 24.5 t ADT: 2,270

CRICKET HOLLOW

Good

Over: DRAINAGE DITCH

AT WILDEROCK, Nueces, TX

Built 1985 Load: 24.5 t ADT: 2,115

SERVICE CENTER RD

Good

Over: DRAINAGE DITCH

0.3 MI E OF AYERS ST, Nueces, TX

Built 1984 Load: 24.5 t ADT: 2,850

TEXAS YES BLVD

Good

Over: DRAINAGE DITCH

0.10 MI E OF US 77, Nueces, TX

Built 1993 Load: 24.5 t ADT: 500

CR 36

Good

Over: Drainage Ditch

0.47 MI W of US 77, Nueces, TX

Built 2020 Load: 24.5 t ADT: 804

CR 36

Good

Over: N.C. DRAINAGE DITCH #2

1.00 MI E OF US 77, Nueces, TX

Built 2010 Load: 24.5 t ADT: 150

SH 44 WB

Good

Over: BANQUETE CREEK

1.00 MI E OF FM 666, Nueces, TX

Built 1940 Load: 27.2 t ADT: 4,757

FM 665

Good

Over: DRAINAGE DITCH

5.65 MI E OF US 77, Nueces, TX

Built 1958 Load: 28.1 t ADT: 7,465

FM 665

Good

Over: LA JOLLA CREEK

0.7 MI NE OF SH 357, Nueces, TX

Built 1961 Load: 29.0 t ADT: 6,000

IH 37 SBML

Good

Over: Nueces River

0.3 MI S OF US 77, Nueces, TX

Built 2023 Load: 32.7 t ADT: 56,374

IH 37 NBFR

Good

Over: Brownlee Blvd

at SH 286 Interchange, Nueces, TX

Built 2020 Load: 32.7 t ADT: 1,238

IH 37 NBFR NW Loop

Good

Over: Open

0.01 Mile N. of M.L. Dr., Nueces, TX

Built 2021 Load: 32.7 t ADT: 11,814

IH 37 SB to SH 286

Good

Over: Leopard St SBFR 286

IH 37 & SH 286 I/C, Nueces, TX

Built 2022 Load: 32.7 t ADT: 6,230

IH 37 NW Loop

Good

Over: Salt Flats

0.13 Mile N. of M.L. Dr., Nueces, TX

Built 2021 Load: 32.7 t ADT: 11,814

IH 37 NBML

Good

Over: US 181

at SH 286 Interchange, Nueces, TX

Built 2023 Load: 32.7 t ADT: 60,268

SH 44 WBFR

Good

Over: OSO CREEK

0.65 MI E OF FM 24, Nueces, TX

Built 1990 Load: 32.7 t ADT: 9,892

SH 44 EBFR

Good

Over: OSO CREEK

0.65 MI E OF FM 24, Nueces, TX

Built 1998 Load: 32.7 t ADT: 9,968

SH 44

Good

Over: DRAINAGE DITCH

At Int. FM 2292, Nueces, TX

Built 2006 Load: 32.7 t ADT: 3,132

SH 44 EBML

Good

Over: Oso Creek

3.85 MI E OF IH 69E, Nueces, TX

Built 2022 Load: 32.7 t ADT: 19,860

SH 44 WBML

Good

Over: Oso Creek

3.82 MI E OF IH 69E, Nueces, TX

Built 2022 Load: 32.7 t ADT: 19,860

US 77 SBFR

Good

Over: DRAIN

0.5 MI N OF FM 2826, Nueces, TX

Built 2018 Load: 32.7 t ADT: 5,000

US 77 NBFR

Good

Over: DRAIN

0.5 MI N OF FM 2826, Nueces, TX

Built 2018 Load: 32.7 t ADT: 5,000

US 77 NB

Good

Over: DRAIN

0.55 MI N OF FM 2826, Nueces, TX

Built 2018 Load: 32.7 t ADT: 8,410

US 77 NB

Good

Over: Drainage DItch

3.0 MI NE OF FM 665, Nueces, TX

Built 2021 Load: 32.7 t ADT: 21,663

NBFR US 77

Good

Over: Drainage Ditch

3.0 MI NE OF FM 665, Nueces, TX

Built 2021 Load: 32.7 t ADT: 2,150

US 77 ML

Good

Over: Bishop Creek

0, Nueces, TX

Built 2018 Load: 32.7 t ADT: 19,300

US 77 NBFR

Good

Over: Drain

11.4 MI. S. of TX-44, Nueces, TX

Built 2022 Load: 32.7 t ADT: 21,608

US 77 NB

Good

Over: Petronila Creek

0.5 MI NE OF FM 665, Nueces, TX

Built 2021 Load: 32.7 t ADT: 21,663

US 77 SBML

Good

Over: Petronila Creek

0.5 MI NE OF FM 665, Nueces, TX

Built 2023 Load: 32.7 t ADT: 19,460

SH 286 NBFR

Good

Over: OSO CREEK

1.25 MI S OF SH 357, Nueces, TX

Built 1988 Load: 32.7 t ADT: 19,582

SH 286 SB

Good

Over: OSO CREEK

0.6 MI NE OF SH 43, Nueces, TX

Built 2017 Load: 32.7 t ADT: 9,886

SH 286 NB

Good

Over: OSO CREEK

0.6 MI NE OF SH 43, Nueces, TX

Built 2017 Load: 32.7 t ADT: 9,696

US 77

Good

Over: DRAW

1.9 MI S OF FM 624, Nueces, TX

Built 2006 Load: 32.7 t ADT: 19,131

US 77

Good

Over: DRAW

1.4 MI S OF FM 624, Nueces, TX

Built 2006 Load: 32.7 t ADT: 19,631

SH 44 EB

Good

Over: AGUA DULCE CREEK

1.45 MI W OF FM 666, Nueces, TX

Built 1975 Load: 32.7 t ADT: 4,554

SH 44 EB

Good

Over: BANQUETE CREEK

1.00 MI E OF FM 666, Nueces, TX

Built 1975 Load: 32.7 t ADT: 4,943

SH 286 NB RAMP M

Good

Over: PEDESTRIAN

AT INTERCHANGE SH286/358, Nueces, TX

Built 2006 Load: 32.7 t ADT: 100,900

SH 286 SB RAMP C

Good

Over: PEDESTRIAN

AT INTERCHANGE SH286/358, Nueces, TX

Built 2006 Load: 32.7 t ADT: 100,900

PR 22 NB

Good

Over: Lake Padre Canal

0.5 Mi S of SH 361, Nueces, TX

Built 2022 Load: 32.7 t ADT: 19,559

PR 22 SB

Good

Over: Lake Padre Canal

0.5 MI SOUTH OF SH361, Nueces, TX

Built 2023 Load: 32.7 t ADT: 19,559

FM 666

Good

Over: CAYAMON CREEK RELIEF

1.20 MI N OF FM 624, Nueces, TX

Built 1988 Load: 32.7 t ADT: 2,159

FM 666

Good

Over: PINTAS CREEK

1.55 MI N OF FM 665, Nueces, TX

Built 1995 Load: 32.7 t ADT: 745

Related

Data sourced from official U.S. government datasets. See our methodology for details. Retrieved and formatted by PlainBridges Editorial