FHWA NBI 2024 Inspection record Public-domain dataset

SC 215

Carrying SC 215 over CRANE CREEK

5 MI N OF COLUMBIA, Richland, South Carolina

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
31 t Inventory load rating

Bridge Snapshot: SC 215

The SC 215 bridge in Richland, South Carolina carries SC 215 over CRANE CREEK. It was built in 1922, making it 104 years old today. It was last reconstructed in 1967, extending its service life. The structure is built primarily of concrete and spans 4 sections, stretching 44.5 meters (146 feet) end to end. Daily traffic averages 7,600 vehicles, placing it in the moderately-trafficked tier of South Carolina bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 5/9, substructure at 4/9. The weakest component sits in poor condition. At least one major component here scores 4 or below, which produces a Poor condition classification under FHWA's current reporting rules. Its NBI inventory load rating is 30.8 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How SC 215 compares

▲ 1.0
Load rating vs South Carolina average (29.8 t)
Top 43%
Higher load rating than 57% of South Carolina bridges
211
Bridges in Richland · 9 in Poor condition
SC 215 30.8 t
South Carolina average 29.8 t

Live comparison across South Carolina.

Historical Sufficiency Rating

PlainBridge-computed
54.9 / 100 - historical 50–79.9 band
Structural adequacy /55
29.3
Serviceability /30
12.0
Essentiality /15
13.5
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
5/9
Fair (5–6)
Substructure
4/9
Poor (1–4)
Inventory Load Rating
30.8 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1922
Last Reconstructed
1967
Material
Concrete
Number of Spans
4
Structure Length
44.5 m (146 ft)
Deck Width
23.3 m (76 ft)
Owner
State Highway Agency
Avg Daily Traffic
7,600 vehicles/day
Structure Number
000000000002826

Condition Analysis

  • The deck (driving surface) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • The superstructure (beams and supports above the deck) rates fair at 5/9, minor deterioration that routine maintenance should address.
  • At 4/9, the substructure (piers and abutments) is in poor shape, with advanced wear flagged for priority repair.

How to read this record

SC 215 is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare SC 215 against other structures in Richland and across South Carolina. South Carolina bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for SC 215?

SC 215 in Richland, South Carolina has a deck rating of 6/9, superstructure rating of 5/9, and substructure rating of 4/9 on the FHWA's 0–9 scale.

How often is SC 215 inspected?

SC 215's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 7,600 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. SC 215 is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for SC 215?

SC 215 has an NBI inventory load rating of 30.8 metric tons.

Who is responsible for maintaining SC 215?

SC 215 is owned and maintained by State Highway Agency.

How old is SC 215 and does age affect safety?

SC 215 was built in 1922, making it 104 years old and last reconstructed in 1967.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.