FHWA NBI 2024 Inspection record Public-domain dataset

Copper Mine Rd

Carrying Copper Mine Rd over Joshua Creek

0.60-Rt.682 / 2.00-Rt.676, Buckingham, Virginia

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
30 t Inventory load rating

Bridge Snapshot: Copper Mine Rd

The Copper Mine Rd bridge in Buckingham, Virginia carries Copper Mine Rd over Joshua Creek. It was built in 1967, making it 59 years old today. The structure is built primarily of concrete and spans 1 section, stretching 9.8 meters (32 feet) end to end. Daily traffic averages 128 vehicles, placing it in the lower-traffic tier of Virginia bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in good condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 29.9 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How Copper Mine Rd compares

▼ 16.1
Load rating vs Virginia average (46.0 t)
Bottom 16%
Lower load rating than 84% of Virginia bridges
72
Bridges in Buckingham · 2 in Poor condition
Copper Mine Rd 29.9 t
Virginia average 46.0 t

Live comparison across Virginia.

Historical Sufficiency Rating

PlainBridge-computed
75.6 / 100 - historical 50–79.9 band
Structural adequacy /55
53.7
Serviceability /30
10.0
Essentiality /15
14.9
Special reductions
−3.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
29.9 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1967
Material
Concrete
Number of Spans
1
Structure Length
9.8 m (32 ft)
Deck Width
6.0 m (20 ft)
Owner
State Highway Agency
Avg Daily Traffic
128 vehicles/day
Structure Number
000000000004059

Condition Analysis

  • The deck (driving surface) rates good at 7/9, with no significant deterioration on file.
  • The superstructure (beams and supports above the deck) is in good condition (7/9), showing no significant deterioration.
  • At 7/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

This page shows what the last federal inspection recorded, not whether Copper Mine Rd is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare Copper Mine Rd against other structures in Buckingham and across Virginia. Virginia bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for Copper Mine Rd?

Copper Mine Rd in Buckingham, Virginia has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is Copper Mine Rd inspected?

Copper Mine Rd's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 128 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. Copper Mine Rd is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for Copper Mine Rd?

Copper Mine Rd has an NBI inventory load rating of 29.9 metric tons.

Who is responsible for maintaining Copper Mine Rd?

Copper Mine Rd is owned and maintained by State Highway Agency.

How old is Copper Mine Rd and does age affect safety?

Copper Mine Rd was built in 1967, making it 59 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.