FHWA NBI 2024 Inspection record Public-domain dataset

POWHITE PKWY NBL

Carrying POWHITE PKWY NBL over FALLING CREEK

0.91 Fr 288 & 1.32 TO 653, Chesterfield, Virginia

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
55 t Inventory load rating

Bridge Snapshot: POWHITE PKWY NBL

The POWHITE PKWY NBL bridge in Chesterfield, Virginia carries POWHITE PKWY NBL over FALLING CREEK. It was built in 1988, making it 38 years old today. The structure is built primarily of prestressed concrete continuous and spans 3 sections, stretching 71.4 meters (234 feet) end to end. Daily traffic averages 13,949 vehicles, placing it in the heavily-trafficked tier of Virginia bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 6/9. The weakest component sits in fair condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 55.3 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How POWHITE PKWY NBL compares

▲ 9.3
Load rating vs Virginia average (46.0 t)
Top 29%
Higher load rating than 71% of Virginia bridges
322
Bridges in Chesterfield · 7 in Poor condition
POWHITE PKWY NBL 55.3 t
Virginia average 46.0 t

Live comparison across Virginia.

Historical Sufficiency Rating

PlainBridge-computed
96.7 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
30.0
Essentiality /15
13.7
Special reductions
−2.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
55.3 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1988
Material
Prestressed Concrete Continuous
Number of Spans
3
Structure Length
71.4 m (234 ft)
Deck Width
12.7 m (42 ft)
Owner
State Highway Agency
Avg Daily Traffic
13,949 vehicles/day
Structure Number
000000000005035

Condition Analysis

  • At 7/9, the deck (driving surface) is in good shape and shows no significant wear.
  • The superstructure (beams and supports above the deck) is in good condition (7/9), showing no significant deterioration.
  • The substructure (piers and abutments) is in fair condition (6/9), with minor deterioration that may require routine maintenance.

How to read this record

This page shows what the last federal inspection recorded, not whether POWHITE PKWY NBL is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare POWHITE PKWY NBL against other structures in Chesterfield and across Virginia. Virginia bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for POWHITE PKWY NBL?

POWHITE PKWY NBL in Chesterfield, Virginia has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is POWHITE PKWY NBL inspected?

POWHITE PKWY NBL's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 13,949 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. POWHITE PKWY NBL is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for POWHITE PKWY NBL?

POWHITE PKWY NBL has an NBI inventory load rating of 55.3 metric tons.

Who is responsible for maintaining POWHITE PKWY NBL?

POWHITE PKWY NBL is owned and maintained by State Highway Agency.

How old is POWHITE PKWY NBL and does age affect safety?

POWHITE PKWY NBL was built in 1988, making it 38 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.