FHWA NBI 2024 Inspection record Public-domain dataset

US 25 BYP

Carrying US 25 BYP over SWAMP RABBIT TRAIL

1.5MI S OF TRAVELERS REST, Greenville, South Carolina

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
27 t Inventory load rating

Bridge Snapshot: US 25 BYP

The US 25 BYP bridge in Greenville, South Carolina carries US 25 BYP over SWAMP RABBIT TRAIL. It was built in 1980, making it 46 years old today. The structure is built primarily of steel continuous and spans 3 sections, stretching 43.3 meters (142 feet) end to end. Daily traffic averages 18,100 vehicles, placing it in the heavily-trafficked tier of South Carolina bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 8/9, superstructure at 8/9, substructure at 8/9. The weakest component sits in good condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 26.6 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How US 25 BYP compares

▼ 3.2
Load rating vs South Carolina average (29.8 t)
Bottom 45%
Lower load rating than 55% of South Carolina bridges
373
Bridges in Greenville · 24 in Poor condition
US 25 BYP 26.6 t
South Carolina average 29.8 t

Live comparison across South Carolina.

Historical Sufficiency Rating

PlainBridge-computed
73.2 / 100 - historical 50–79.9 band
Structural adequacy /55
50.5
Serviceability /30
13.0
Essentiality /15
12.7
Special reductions
−3.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
8/9
Good (7–9)
Superstructure
8/9
Good (7–9)
Substructure
8/9
Good (7–9)
Inventory Load Rating
26.6 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1980
Material
Steel Continuous
Number of Spans
3
Structure Length
43.3 m (142 ft)
Deck Width
29.3 m (96 ft)
Owner
State Highway Agency
Avg Daily Traffic
18,100 vehicles/day
Structure Number
000000000007363

Condition Analysis

  • At 8/9, the deck (driving surface) is in good shape and shows no significant wear.
  • The superstructure (beams and supports above the deck) rates good at 8/9, with no significant deterioration on file.
  • At 8/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

This page shows what the last federal inspection recorded, not whether US 25 BYP is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare US 25 BYP against other structures in Greenville and across South Carolina. South Carolina bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for US 25 BYP?

US 25 BYP in Greenville, South Carolina has a deck rating of 8/9, superstructure rating of 8/9, and substructure rating of 8/9 on the FHWA's 0–9 scale.

How often is US 25 BYP inspected?

US 25 BYP's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 18,100 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. US 25 BYP is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for US 25 BYP?

US 25 BYP has an NBI inventory load rating of 26.6 metric tons.

Who is responsible for maintaining US 25 BYP?

US 25 BYP is owned and maintained by State Highway Agency.

How old is US 25 BYP and does age affect safety?

US 25 BYP was built in 1980, making it 46 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.