FHWA NBI 2024 Inspection record Public-domain dataset

I-526 WB

Carrying I-526 WB over HOBCAW CREEK

NEAR MT. PLEASANT, Charleston, South Carolina

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
45 t Inventory load rating

Bridge Snapshot: I-526 WB

The I-526 WB bridge in Charleston, South Carolina carries I-526 WB over HOBCAW CREEK. It was built in 1990, making it 36 years old today. The structure is built primarily of concrete continuous and spans 13 sections, stretching 118.9 meters (390 feet) end to end. Daily traffic averages 29,850 vehicles, placing it in the heavily-trafficked tier of South Carolina bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 6/9. The weakest component sits in fair condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 44.7 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How I-526 WB compares

▲ 14.9
Load rating vs South Carolina average (29.8 t)
Top 11%
Higher load rating than 89% of South Carolina bridges
196
Bridges in Charleston · 6 in Poor condition
I-526 WB 44.7 t
South Carolina average 29.8 t

Live comparison across South Carolina.

Historical Sufficiency Rating

PlainBridge-computed
95.2 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
30.0
Essentiality /15
10.2
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
44.7 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1990
Material
Concrete Continuous
Number of Spans
13
Structure Length
118.9 m (390 ft)
Deck Width
14.3 m (47 ft)
Owner
State Highway Agency
Avg Daily Traffic
29,850 vehicles/day
Structure Number
000000000008332

Condition Analysis

  • At 7/9, the deck (driving surface) is in good shape and shows no significant wear.
  • At 7/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • The substructure (piers and abutments) rates fair at 6/9, minor deterioration that routine maintenance should address.

How to read this record

This page shows what the last federal inspection recorded, not whether I-526 WB is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare I-526 WB against other structures in Charleston and across South Carolina. South Carolina bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for I-526 WB?

I-526 WB in Charleston, South Carolina has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is I-526 WB inspected?

I-526 WB's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 29,850 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. I-526 WB is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for I-526 WB?

I-526 WB has an NBI inventory load rating of 44.7 metric tons.

Who is responsible for maintaining I-526 WB?

I-526 WB is owned and maintained by State Highway Agency.

How old is I-526 WB and does age affect safety?

I-526 WB was built in 1990, making it 36 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.