FHWA NBI 2024 Inspection record Public-domain dataset

L. P. Bailey Hwy.

Carrying L. P. Bailey Hwy. over Banister River

0.59 TO 360 - 1.75 TO 615, Halifax, Virginia

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
35 t Inventory load rating

Bridge Snapshot: L. P. Bailey Hwy.

The L. P. Bailey Hwy. bridge in Halifax, Virginia carries L. P. Bailey Hwy. over Banister River. It was built in 1958, making it 68 years old today. The structure is built primarily of steel and spans 15 sections, stretching 229.3 meters (752 feet) end to end. Daily traffic averages 4,705 vehicles, placing it in the moderately-trafficked tier of Virginia bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 5/9, superstructure at 6/9, substructure at 5/9. The weakest component sits in fair condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 35.4 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How L. P. Bailey Hwy. compares

▼ 10.6
Load rating vs Virginia average (46.0 t)
Bottom 39%
Lower load rating than 61% of Virginia bridges
161
Bridges in Halifax · 11 in Poor condition
L. P. Bailey Hwy. 35.4 t
Virginia average 46.0 t

Live comparison across Virginia.

Historical Sufficiency Rating

PlainBridge-computed
63.3 / 100 - historical 50–79.9 band
Structural adequacy /55
45.0
Serviceability /30
11.0
Essentiality /15
10.3
Special reductions
−3.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
5/9
Fair (5–6)
Superstructure
6/9
Fair (5–6)
Substructure
5/9
Fair (5–6)
Inventory Load Rating
35.4 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1958
Material
Steel
Number of Spans
15
Structure Length
229.3 m (752 ft)
Deck Width
10.1 m (33 ft)
Owner
State Highway Agency
Avg Daily Traffic
4,705 vehicles/day
Structure Number
000000000009203

Condition Analysis

  • The deck (driving surface) rates fair at 5/9, minor deterioration that routine maintenance should address.
  • At 6/9, the superstructure (beams and supports above the deck) shows fair condition, with minor wear flagged for upkeep.
  • At 5/9, the substructure (piers and abutments) shows fair condition, with minor wear flagged for upkeep.

How to read this record

This page shows what the last federal inspection recorded, not whether L. P. Bailey Hwy. is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare L. P. Bailey Hwy. against other structures in Halifax and across Virginia. Virginia bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for L. P. Bailey Hwy.?

L. P. Bailey Hwy. in Halifax, Virginia has a deck rating of 5/9, superstructure rating of 6/9, and substructure rating of 5/9 on the FHWA's 0–9 scale.

How often is L. P. Bailey Hwy. inspected?

L. P. Bailey Hwy.'s responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 4,705 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. L. P. Bailey Hwy. is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for L. P. Bailey Hwy.?

L. P. Bailey Hwy. has an NBI inventory load rating of 35.4 metric tons.

Who is responsible for maintaining L. P. Bailey Hwy.?

L. P. Bailey Hwy. is owned and maintained by State Highway Agency.

How old is L. P. Bailey Hwy. and does age affect safety?

L. P. Bailey Hwy. was built in 1958, making it 68 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.