FHWA NBI 2024 Inspection record Public-domain dataset

WESTHAM PARKWAY

Carrying WESTHAM PARKWAY over LITTLE WESTHAM CREEK

.05 BALDWIN .05 BEECHWOOD, Henrico, Virginia

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
20 t Inventory load rating

Bridge Snapshot: WESTHAM PARKWAY

The WESTHAM PARKWAY bridge in Henrico, Virginia carries WESTHAM PARKWAY over LITTLE WESTHAM CREEK. It was built in 1979, making it 47 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 12.8 meters (42 feet) end to end. Daily traffic averages 2,158 vehicles, placing it in the moderately-trafficked tier of Virginia bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 4/9, substructure at 6/9. The weakest component sits in poor condition. Because at least one major component scores 4 or lower, this bridge falls in FHWA's Poor condition category. That category is not a closure order. Its NBI inventory load rating is 19.6 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How WESTHAM PARKWAY compares

▼ 26.4
Load rating vs Virginia average (46.0 t)
Bottom 6%
Lower load rating than 94% of Virginia bridges
352
Bridges in Henrico · 6 in Poor condition
WESTHAM PARKWAY 19.6 t
Virginia average 46.0 t

Live comparison across Virginia.

Historical Sufficiency Rating

PlainBridge-computed
53.7 / 100 - historical 50–79.9 band
Structural adequacy /55
15.1
Serviceability /30
27.0
Essentiality /15
14.6
Special reductions
−3.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
4/9
Poor (1–4)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
19.6 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1979
Material
Prestressed Concrete
Number of Spans
1
Structure Length
12.8 m (42 ft)
Deck Width
12.2 m (40 ft)
Owner
County Highway Agency
Avg Daily Traffic
2,158 vehicles/day
Structure Number
000000000009671

Condition Analysis

  • The deck (driving surface) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • The superstructure (beams and supports above the deck) is in poor condition (4/9), showing advanced deterioration that may require priority repair.
  • The substructure (piers and abutments) rates fair at 6/9, minor deterioration that routine maintenance should address.

How to read this record

WESTHAM PARKWAY is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare WESTHAM PARKWAY against other structures in Henrico and across Virginia. Virginia bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for WESTHAM PARKWAY?

WESTHAM PARKWAY in Henrico, Virginia has a deck rating of 6/9, superstructure rating of 4/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is WESTHAM PARKWAY inspected?

WESTHAM PARKWAY's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 2,158 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. WESTHAM PARKWAY is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for WESTHAM PARKWAY?

WESTHAM PARKWAY has an NBI inventory load rating of 19.6 metric tons.

Who is responsible for maintaining WESTHAM PARKWAY?

WESTHAM PARKWAY is owned and maintained by County Highway Agency.

How old is WESTHAM PARKWAY and does age affect safety?

WESTHAM PARKWAY was built in 1979, making it 47 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.