FHWA NBI 2024 Inspection record Public-domain dataset

BIA RTE 5

Carrying BIA RTE 5 over LITTLE WHITE RIVER

SPRING CREEK, Todd, South Dakota

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
34 t Inventory load rating

Bridge Snapshot: BIA RTE 5

The BIA RTE 5 bridge in Todd, South Dakota carries BIA RTE 5 over LITTLE WHITE RIVER. It was built in 2003, making it 23 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 29.1 meters (95 feet) end to end. Daily traffic averages 100 vehicles, placing it in the lower-traffic tier of South Dakota bridges. It is owned and maintained by Bureau of Indian Affairs.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in good condition. All reported major components score above the Poor range. Its NBI inventory load rating is 33.5 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How BIA RTE 5 compares

▲ 1.0
Load rating vs South Dakota average (32.5 t)
Top 34%
Higher load rating than 66% of South Dakota bridges
24
Bridges in Todd · 7 in Poor condition
BIA RTE 5 33.5 t
South Dakota average 32.5 t

Live comparison across South Dakota.

Historical Sufficiency Rating

PlainBridge-computed
92.1 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
30.0
Essentiality /15
14.1
Special reductions
−7.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
33.5 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
2003
Material
Prestressed Concrete
Number of Spans
1
Structure Length
29.1 m (95 ft)
Deck Width
12.0 m (39 ft)
Owner
Bureau of Indian Affairs
Avg Daily Traffic
100 vehicles/day
Structure Number
00000000000A141

Condition Analysis

  • At 7/9, the deck (driving surface) is in good shape and shows no significant wear.
  • At 7/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • At 7/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

This page shows what the last federal inspection recorded, not whether BIA RTE 5 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare BIA RTE 5 against other structures in Todd and across South Dakota. South Dakota bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for BIA RTE 5?

BIA RTE 5 in Todd, South Dakota has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is BIA RTE 5 inspected?

BIA RTE 5's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 100 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. BIA RTE 5 is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for BIA RTE 5?

BIA RTE 5 has an NBI inventory load rating of 33.5 metric tons.

Who is responsible for maintaining BIA RTE 5?

BIA RTE 5 is owned and maintained by Bureau of Indian Affairs.

How old is BIA RTE 5 and does age affect safety?

BIA RTE 5 was built in 2003, making it 23 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.