FHWA NBI 2024 Inspection record Public-domain dataset

IRR BIA RTE 209

Carrying IRR BIA RTE 209 over ROSEBUD CREEK

8.1 KM WEST OF LAME DEER, Big Horn, Montana

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
11 t Inventory load rating

Bridge Snapshot: IRR BIA RTE 209

The IRR BIA RTE 209 bridge in Big Horn, Montana carries IRR BIA RTE 209 over ROSEBUD CREEK. It was built in 1971, making it 55 years old today. The structure is built primarily of wood or timber and spans 1 section, stretching 8.1 meters (27 feet) end to end. Daily traffic averages 100 vehicles, placing it in the lower-traffic tier of Montana bridges. It is owned and maintained by Bureau of Indian Affairs.

The latest FHWA inspection records show a deck rating of 3/9, superstructure at 4/9, substructure at 2/9. The weakest component sits in critical condition. Because at least one major component scores 4 or lower, this bridge falls in FHWA's Poor condition category. That category is not a closure order. Its NBI inventory load rating is 11.3 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How IRR BIA RTE 209 compares

▼ 19.4
Load rating vs Montana average (30.7 t)
Bottom 5%
Lower load rating than 95% of Montana bridges
136
Bridges in Big Horn · 7 in Poor condition
IRR BIA RTE 209 11.3 t
Montana average 30.7 t

Live comparison across Montana.

Historical Sufficiency Rating

PlainBridge-computed
7.0 / 100 - historical under-20 band
Structural adequacy /55
0.0
Serviceability /30
5.7
Essentiality /15
1.2
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
3/9
Poor (1–4)
Superstructure
4/9
Poor (1–4)
Substructure
2/9
Poor (1–4)
Inventory Load Rating
11.3 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1971
Material
Wood or Timber
Number of Spans
1
Structure Length
8.1 m (27 ft)
Deck Width
4.9 m (16 ft)
Owner
Bureau of Indian Affairs
Avg Daily Traffic
100 vehicles/day
Structure Number
00000000000C714

Condition Analysis

  • The deck (driving surface) rates poor at 3/9, advanced deterioration that should be prioritized for repair.
  • The superstructure (beams and supports above the deck) rates poor at 4/9, advanced deterioration that should be prioritized for repair.
  • At 2/9, the substructure (piers and abutments) is in critical shape, with severe wear requiring urgent action.

How to read this record

IRR BIA RTE 209 is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare IRR BIA RTE 209 against other structures in Big Horn and across Montana. Montana bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for IRR BIA RTE 209?

IRR BIA RTE 209 in Big Horn, Montana has a deck rating of 3/9, superstructure rating of 4/9, and substructure rating of 2/9 on the FHWA's 0–9 scale.

How often is IRR BIA RTE 209 inspected?

IRR BIA RTE 209's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 100 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. IRR BIA RTE 209 is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for IRR BIA RTE 209?

IRR BIA RTE 209 has an NBI inventory load rating of 11.3 metric tons.

Who is responsible for maintaining IRR BIA RTE 209?

IRR BIA RTE 209 is owned and maintained by Bureau of Indian Affairs.

How old is IRR BIA RTE 209 and does age affect safety?

IRR BIA RTE 209 was built in 1971, making it 55 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.