FHWA NBI 2024 Inspection record Public-domain dataset

IRR BIA 44

Carrying IRR BIA 44 over N FORK OF WHITE RIVER

0.2 KM EAST OF HWY 73, Navajo, Arizona

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
32 t Inventory load rating

Bridge Snapshot: IRR BIA 44

The IRR BIA 44 bridge in Navajo, Arizona carries IRR BIA 44 over N FORK OF WHITE RIVER. It was built in 1971, making it 55 years old today. The structure is built primarily of steel and spans 3 sections, stretching 74.3 meters (244 feet) end to end. Daily traffic averages 3,000 vehicles, placing it in the moderately-trafficked tier of Arizona bridges. It is owned and maintained by Bureau of Indian Affairs.

The latest FHWA inspection records show a deck rating of 5/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in fair condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 32.4 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How IRR BIA 44 compares

▼ 15.0
Load rating vs Arizona average (47.4 t)
Bottom 24%
Lower load rating than 76% of Arizona bridges
179
Bridges in Navajo · 4 in Poor condition
IRR BIA 44 32.4 t
Arizona average 47.4 t

Live comparison across Arizona.

Historical Sufficiency Rating

PlainBridge-computed
79.9 / 100 - historical 50–79.9 band
Structural adequacy /55
55.0
Serviceability /30
12.0
Essentiality /15
13.9
Special reductions
−1.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
5/9
Fair (5–6)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
32.4 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1971
Material
Steel
Number of Spans
3
Structure Length
74.3 m (244 ft)
Deck Width
10.3 m (34 ft)
Owner
Bureau of Indian Affairs
Avg Daily Traffic
3,000 vehicles/day
Structure Number
00000000000H062

Condition Analysis

  • The deck (driving surface) is in fair condition (5/9), with minor deterioration that may require routine maintenance.
  • The superstructure (beams and supports above the deck) rates good at 7/9, with no significant deterioration on file.
  • At 7/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

This page shows what the last federal inspection recorded, not whether IRR BIA 44 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare IRR BIA 44 against other structures in Navajo and across Arizona. Arizona bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for IRR BIA 44?

IRR BIA 44 in Navajo, Arizona has a deck rating of 5/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is IRR BIA 44 inspected?

IRR BIA 44's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 3,000 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. IRR BIA 44 is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for IRR BIA 44?

IRR BIA 44 has an NBI inventory load rating of 32.4 metric tons.

Who is responsible for maintaining IRR BIA 44?

IRR BIA 44 is owned and maintained by Bureau of Indian Affairs.

How old is IRR BIA 44 and does age affect safety?

IRR BIA 44 was built in 1971, making it 55 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.