FHWA NBI 2024 Inspection record Public-domain dataset

IRR BIA RTE 26

Carrying IRR BIA RTE 26 over NEW YORK WASH

1.6 KM N OF SEAMA, Cibola, New Mexico

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
40 t Inventory load rating

Bridge Snapshot: IRR BIA RTE 26

The IRR BIA RTE 26 bridge in Cibola, New Mexico carries IRR BIA RTE 26 over NEW YORK WASH. It was built in 1963, making it 63 years old today. It was last reconstructed in 2009, extending its service life. The structure is built primarily of prestressed concrete and spans 1 section, stretching 31.6 meters (104 feet) end to end. Daily traffic averages 125 vehicles, placing it in the lower-traffic tier of New Mexico bridges. It is owned and maintained by Bureau of Indian Affairs.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 8/9, substructure at 8/9. The weakest component sits in good condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 39.6 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How IRR BIA RTE 26 compares

▲ 4.8
Load rating vs New Mexico average (34.8 t)
Top 16%
Higher load rating than 84% of New Mexico bridges
23
Bridges in Cibola · 3 in Poor condition
IRR BIA RTE 26 39.6 t
New Mexico average 34.8 t

Live comparison across New Mexico.

Historical Sufficiency Rating

PlainBridge-computed
100.0 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
30.0
Essentiality /15
15.0
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
8/9
Good (7–9)
Substructure
8/9
Good (7–9)
Inventory Load Rating
39.6 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1963
Last Reconstructed
2009
Material
Prestressed Concrete
Number of Spans
1
Structure Length
31.6 m (104 ft)
Deck Width
10.7 m (35 ft)
Owner
Bureau of Indian Affairs
Avg Daily Traffic
125 vehicles/day
Structure Number
00000000000M157

Condition Analysis

  • The deck (driving surface) rates good at 7/9, with no significant deterioration on file.
  • The superstructure (beams and supports above the deck) rates good at 8/9, with no significant deterioration on file.
  • The substructure (piers and abutments) rates good at 8/9, with no significant deterioration on file.

How to read this record

This page shows what the last federal inspection recorded, not whether IRR BIA RTE 26 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare IRR BIA RTE 26 against other structures in Cibola and across New Mexico. New Mexico bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for IRR BIA RTE 26?

IRR BIA RTE 26 in Cibola, New Mexico has a deck rating of 7/9, superstructure rating of 8/9, and substructure rating of 8/9 on the FHWA's 0–9 scale.

How often is IRR BIA RTE 26 inspected?

IRR BIA RTE 26's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 125 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. IRR BIA RTE 26 is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for IRR BIA RTE 26?

IRR BIA RTE 26 has an NBI inventory load rating of 39.6 metric tons.

Who is responsible for maintaining IRR BIA RTE 26?

IRR BIA RTE 26 is owned and maintained by Bureau of Indian Affairs.

How old is IRR BIA RTE 26 and does age affect safety?

IRR BIA RTE 26 was built in 1963, making it 63 years old and last reconstructed in 2009.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.