FHWA NBI 2024 Inspection record Public-domain dataset

WARWICK FURNACE RD

Carrying WARWICK FURNACE RD over SOUTH BR. FRENCH CREEK

1.6 Mi S PA-23 3249-F6, Chester, Pennsylvania

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
6 t Inventory load rating

Bridge Snapshot: WARWICK FURNACE RD

The WARWICK FURNACE RD bridge in Chester, Pennsylvania carries WARWICK FURNACE RD over SOUTH BR. FRENCH CREEK. It was built in 1889, making it 137 years old today. It was last reconstructed in 1987, extending its service life. The structure is built primarily of aluminum/iron and spans 1 section, stretching 17.7 meters (58 feet) end to end. Daily traffic averages 565 vehicles, placing it in the lower-traffic tier of Pennsylvania bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 4/9, substructure at 4/9. The weakest component sits in poor condition. At least one major component here scores 4 or below, which produces a Poor condition classification under FHWA's current reporting rules. Its NBI inventory load rating is 6.4 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How WARWICK FURNACE RD compares

▼ 32.9
Load rating vs Pennsylvania average (39.3 t)
Bottom 1%
Lower load rating than 99% of Pennsylvania bridges
285
Bridges in Chester · 25 in Poor condition
WARWICK FURNACE RD 6.4 t
Pennsylvania average 39.3 t

Live comparison across Pennsylvania.

Historical Sufficiency Rating

PlainBridge-computed
17.3 / 100 - historical under-20 band
Structural adequacy /55
0.0
Serviceability /30
5.0
Essentiality /15
12.3
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
4/9
Poor (1–4)
Substructure
4/9
Poor (1–4)
Inventory Load Rating
6.4 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1889
Last Reconstructed
1987
Material
Aluminum/Iron
Number of Spans
1
Structure Length
17.7 m (58 ft)
Deck Width
5.2 m (17 ft)
Owner
County Highway Agency
Avg Daily Traffic
565 vehicles/day
Structure Number
000000000010686

Condition Analysis

  • The deck (driving surface) rates good at 7/9, with no significant deterioration on file.
  • The superstructure (beams and supports above the deck) rates poor at 4/9, advanced deterioration that should be prioritized for repair.
  • At 4/9, the substructure (piers and abutments) is in poor shape, with advanced wear flagged for priority repair.

How to read this record

WARWICK FURNACE RD is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare WARWICK FURNACE RD against other structures in Chester and across Pennsylvania. Pennsylvania bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for WARWICK FURNACE RD?

WARWICK FURNACE RD in Chester, Pennsylvania has a deck rating of 7/9, superstructure rating of 4/9, and substructure rating of 4/9 on the FHWA's 0–9 scale.

How often is WARWICK FURNACE RD inspected?

WARWICK FURNACE RD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 565 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. WARWICK FURNACE RD is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for WARWICK FURNACE RD?

WARWICK FURNACE RD has an NBI inventory load rating of 6.4 metric tons.

Who is responsible for maintaining WARWICK FURNACE RD?

WARWICK FURNACE RD is owned and maintained by County Highway Agency.

How old is WARWICK FURNACE RD and does age affect safety?

WARWICK FURNACE RD was built in 1889, making it 137 years old and last reconstructed in 1987.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.