FHWA NBI 2024 Inspection record Public-domain dataset

SR 36-PA 36

Carrying SR 36-PA 36 over CHEST CREEK

WESTOVER, Clearfield, Pennsylvania

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
55 t Inventory load rating

Bridge Snapshot: SR 36-PA 36

The SR 36-PA 36 bridge in Clearfield, Pennsylvania carries SR 36-PA 36 over CHEST CREEK. It was built in 1996, making it 30 years old today. The structure is built primarily of prestressed concrete continuous and spans 2 sections, stretching 40.2 meters (132 feet) end to end. Daily traffic averages 1,295 vehicles, placing it in the moderately-trafficked tier of Pennsylvania bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in good condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 55.3 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How SR 36-PA 36 compares

▲ 16.0
Load rating vs Pennsylvania average (39.3 t)
Top 9%
Higher load rating than 91% of Pennsylvania bridges
195
Bridges in Clearfield · 22 in Poor condition
SR 36-PA 36 55.3 t
Pennsylvania average 39.3 t

Live comparison across Pennsylvania.

Historical Sufficiency Rating

PlainBridge-computed
96.5 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
30.0
Essentiality /15
11.6
Special reductions
−0.1

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
55.3 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1996
Material
Prestressed Concrete Continuous
Number of Spans
2
Structure Length
40.2 m (132 ft)
Deck Width
12.0 m (39 ft)
Owner
State Highway Agency
Avg Daily Traffic
1,295 vehicles/day
Structure Number
000000000011191

Condition Analysis

  • The deck (driving surface) is in good condition (7/9), showing no significant deterioration.
  • At 7/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • The substructure (piers and abutments) rates good at 7/9, with no significant deterioration on file.

How to read this record

This page shows what the last federal inspection recorded, not whether SR 36-PA 36 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare SR 36-PA 36 against other structures in Clearfield and across Pennsylvania. Pennsylvania bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for SR 36-PA 36?

SR 36-PA 36 in Clearfield, Pennsylvania has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is SR 36-PA 36 inspected?

SR 36-PA 36's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 1,295 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. SR 36-PA 36 is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for SR 36-PA 36?

SR 36-PA 36 has an NBI inventory load rating of 55.3 metric tons.

Who is responsible for maintaining SR 36-PA 36?

SR 36-PA 36 is owned and maintained by State Highway Agency.

How old is SR 36-PA 36 and does age affect safety?

SR 36-PA 36 was built in 1996, making it 30 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.