FHWA NBI 2024 Inspection record Public-domain dataset

Route 360 WBL

Carrying Route 360 WBL over Grade Crossing

0.30-Rt.704/0.32-Rt.728, Prince Edward, Virginia

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
60 t Inventory load rating

Bridge Snapshot: Route 360 WBL

The Route 360 WBL bridge in Prince Edward, Virginia carries Route 360 WBL over Grade Crossing. It was built in 1973, making it 53 years old today. The structure is built primarily of steel and spans 3 sections, stretching 57.2 meters (188 feet) end to end. Daily traffic averages 2,379 vehicles, placing it in the moderately-trafficked tier of Virginia bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 5/9, substructure at 6/9. The weakest component sits in fair condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 59.9 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How Route 360 WBL compares

▲ 13.9
Load rating vs Virginia average (46.0 t)
Top 22%
Higher load rating than 78% of Virginia bridges
82
Bridges in Prince Edward · 5 in Poor condition
Route 360 WBL 59.9 t
Virginia average 46.0 t

Live comparison across Virginia.

Historical Sufficiency Rating

PlainBridge-computed
88.7 / 100 - historical 80–100 band
Structural adequacy /55
45.0
Serviceability /30
29.0
Essentiality /15
14.7
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
5/9
Fair (5–6)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
59.9 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1973
Material
Steel
Number of Spans
3
Structure Length
57.2 m (188 ft)
Deck Width
12.8 m (42 ft)
Owner
State Highway Agency
Avg Daily Traffic
2,379 vehicles/day
Structure Number
000000000013903

Condition Analysis

  • The deck (driving surface) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • The superstructure (beams and supports above the deck) rates fair at 5/9, minor deterioration that routine maintenance should address.
  • The substructure (piers and abutments) rates fair at 6/9, minor deterioration that routine maintenance should address.

How to read this record

This page shows what the last federal inspection recorded, not whether Route 360 WBL is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare Route 360 WBL against other structures in Prince Edward and across Virginia. Virginia bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for Route 360 WBL?

Route 360 WBL in Prince Edward, Virginia has a deck rating of 6/9, superstructure rating of 5/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is Route 360 WBL inspected?

Route 360 WBL's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 2,379 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. Route 360 WBL is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for Route 360 WBL?

Route 360 WBL has an NBI inventory load rating of 59.9 metric tons.

Who is responsible for maintaining Route 360 WBL?

Route 360 WBL is owned and maintained by State Highway Agency.

How old is Route 360 WBL and does age affect safety?

Route 360 WBL was built in 1973, making it 53 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.