FHWA NBI 2024 Inspection record Public-domain dataset

SR 86,E.B.

Carrying SR 86,E.B. over OVER FRENCH CREEK

GREENFIELD TOWNSHIP, Erie, Pennsylvania

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
45 t Inventory load rating

Bridge Snapshot: SR 86,E.B.

The SR 86,E.B. bridge in Erie, Pennsylvania carries SR 86,E.B. over OVER FRENCH CREEK. It was built in 1987, making it 39 years old today. The structure is built primarily of prestressed concrete and spans 3 sections, stretching 43.3 meters (142 feet) end to end. Daily traffic averages 3,686 vehicles, placing it in the moderately-trafficked tier of Pennsylvania bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 6/9, substructure at 6/9. The weakest component sits in fair condition. All reported major components score above the Poor range. Its NBI inventory load rating is 44.5 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How SR 86,E.B. compares

▲ 5.2
Load rating vs Pennsylvania average (39.3 t)
Top 28%
Higher load rating than 72% of Pennsylvania bridges
331
Bridges in Erie · 20 in Poor condition
SR 86,E.B. 44.5 t
Pennsylvania average 39.3 t

Live comparison across Pennsylvania.

Historical Sufficiency Rating

PlainBridge-computed
96.6 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
30.0
Essentiality /15
11.6
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
6/9
Fair (5–6)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
44.5 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1987
Material
Prestressed Concrete
Number of Spans
3
Structure Length
43.3 m (142 ft)
Deck Width
14.5 m (48 ft)
Owner
State Highway Agency
Avg Daily Traffic
3,686 vehicles/day
Structure Number
000000000015873

Condition Analysis

  • The deck (driving surface) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • The superstructure (beams and supports above the deck) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • The substructure (piers and abutments) is in fair condition (6/9), with minor deterioration that may require routine maintenance.

How to read this record

This page shows what the last federal inspection recorded, not whether SR 86,E.B. is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare SR 86,E.B. against other structures in Erie and across Pennsylvania. Pennsylvania bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for SR 86,E.B.?

SR 86,E.B. in Erie, Pennsylvania has a deck rating of 6/9, superstructure rating of 6/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is SR 86,E.B. inspected?

SR 86,E.B.'s responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 3,686 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. SR 86,E.B. is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for SR 86,E.B.?

SR 86,E.B. has an NBI inventory load rating of 44.5 metric tons.

Who is responsible for maintaining SR 86,E.B.?

SR 86,E.B. is owned and maintained by State Highway Agency.

How old is SR 86,E.B. and does age affect safety?

SR 86,E.B. was built in 1987, making it 39 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.