FHWA NBI 2024 Inspection record Public-domain dataset

IA 188

Carrying IA 188 over DRY RUN CREEK

3.4 mi. W of Jct. US 218, Butler, Iowa

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
28 t Inventory load rating

Bridge Snapshot: IA 188

The IA 188 bridge in Butler, Iowa carries IA 188 over DRY RUN CREEK. It was built in 1959, making it 67 years old today. The structure is built primarily of prestressed concrete and spans 3 sections, stretching 44.2 meters (145 feet) end to end. Daily traffic averages 490 vehicles, placing it in the lower-traffic tier of Iowa bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 7/9, substructure at 6/9. The weakest component sits in fair condition. All reported major components score above the Poor range. Its NBI inventory load rating is 28.4 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How IA 188 compares

▼ 2.5
Load rating vs Iowa average (30.9 t)
Bottom 41%
Lower load rating than 59% of Iowa bridges
261
Bridges in Butler · 42 in Poor condition
IA 188 28.4 t
Iowa average 30.9 t

Live comparison across Iowa.

Historical Sufficiency Rating

PlainBridge-computed
92.1 / 100 - historical 80–100 band
Structural adequacy /55
52.4
Serviceability /30
25.0
Essentiality /15
14.7
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
7/9
Good (7–9)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
28.4 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1959
Material
Prestressed Concrete
Number of Spans
3
Structure Length
44.2 m (145 ft)
Deck Width
11.0 m (36 ft)
Owner
State Highway Agency
Avg Daily Traffic
490 vehicles/day
Structure Number
000000000016770

Condition Analysis

  • The deck (driving surface) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • At 7/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • The substructure (piers and abutments) is in fair condition (6/9), with minor deterioration that may require routine maintenance.

How to read this record

This page shows what the last federal inspection recorded, not whether IA 188 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare IA 188 against other structures in Butler and across Iowa. Iowa bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for IA 188?

IA 188 in Butler, Iowa has a deck rating of 6/9, superstructure rating of 7/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is IA 188 inspected?

IA 188's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 490 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. IA 188 is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for IA 188?

IA 188 has an NBI inventory load rating of 28.4 metric tons.

Who is responsible for maintaining IA 188?

IA 188 is owned and maintained by State Highway Agency.

How old is IA 188 and does age affect safety?

IA 188 was built in 1959, making it 67 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.