FHWA NBI 2024 Inspection record Public-domain dataset

RTE 19 SBL

Carrying RTE 19 SBL over NS RWY & WRIGHTS VAL CK

1.15 FR 460;2.41 TO 102, Tazewell, Virginia

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
55 t Inventory load rating

Bridge Snapshot: RTE 19 SBL

The RTE 19 SBL bridge in Tazewell, Virginia carries RTE 19 SBL over NS RWY & WRIGHTS VAL CK. It was built in 1936, making it 90 years old today. It was last reconstructed in 2004, extending its service life. The structure is built primarily of steel continuous and spans 3 sections, stretching 63.1 meters (207 feet) end to end. Daily traffic averages 1,391 vehicles, placing it in the moderately-trafficked tier of Virginia bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 6/9. The weakest component sits in fair condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 55.3 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How RTE 19 SBL compares

▲ 9.3
Load rating vs Virginia average (46.0 t)
Top 29%
Higher load rating than 71% of Virginia bridges
204
Bridges in Tazewell · 8 in Poor condition
RTE 19 SBL 55.3 t
Virginia average 46.0 t

Live comparison across Virginia.

Historical Sufficiency Rating

PlainBridge-computed
99.9 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
30.0
Essentiality /15
14.9
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
55.3 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1936
Last Reconstructed
2004
Material
Steel Continuous
Number of Spans
3
Structure Length
63.1 m (207 ft)
Deck Width
12.2 m (40 ft)
Owner
State Highway Agency
Avg Daily Traffic
1,391 vehicles/day
Structure Number
000000000018406

Condition Analysis

  • At 7/9, the deck (driving surface) is in good shape and shows no significant wear.
  • The superstructure (beams and supports above the deck) is in good condition (7/9), showing no significant deterioration.
  • The substructure (piers and abutments) is in fair condition (6/9), with minor deterioration that may require routine maintenance.

How to read this record

This page shows what the last federal inspection recorded, not whether RTE 19 SBL is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare RTE 19 SBL against other structures in Tazewell and across Virginia. Virginia bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for RTE 19 SBL?

RTE 19 SBL in Tazewell, Virginia has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is RTE 19 SBL inspected?

RTE 19 SBL's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 1,391 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. RTE 19 SBL is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for RTE 19 SBL?

RTE 19 SBL has an NBI inventory load rating of 55.3 metric tons.

Who is responsible for maintaining RTE 19 SBL?

RTE 19 SBL is owned and maintained by State Highway Agency.

How old is RTE 19 SBL and does age affect safety?

RTE 19 SBL was built in 1936, making it 90 years old and last reconstructed in 2004.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.