FHWA NBI 2024 Inspection record Public-domain dataset

T544,SILVR PINE RD

Carrying T544,SILVR PINE RD over STANDING STONE CREEK

4 MI.NE.MCALEVYS FORT, Huntingdon, Pennsylvania

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
19 t Inventory load rating

Bridge Snapshot: T544,SILVR PINE RD

The T544,SILVR PINE RD bridge in Huntingdon, Pennsylvania carries T544,SILVR PINE RD over STANDING STONE CREEK. It was built in 1920, making it 106 years old today. It was last reconstructed in 1991, extending its service life. The structure is built primarily of steel and spans 1 section, stretching 10.4 meters (34 feet) end to end. Daily traffic averages 40 vehicles, placing it in the lower-traffic tier of Pennsylvania bridges. It is owned and maintained by Town/Township Highway Agency.

The latest FHWA inspection records show a deck rating of 5/9, superstructure at 5/9, substructure at 4/9. The weakest component sits in poor condition. A component scored 4 or below, placing this bridge in the federal Poor condition category rather than declaring it unsafe or closed. Its NBI inventory load rating is 19.1 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How T544,SILVR PINE RD compares

▼ 20.2
Load rating vs Pennsylvania average (39.3 t)
Bottom 6%
Lower load rating than 94% of Pennsylvania bridges
162
Bridges in Huntingdon · 15 in Poor condition
T544,SILVR PINE RD 19.1 t
Pennsylvania average 39.3 t

Live comparison across Pennsylvania.

Historical Sufficiency Rating

PlainBridge-computed
40.4 / 100 - historical 20–49.9 band
Structural adequacy /55
14.2
Serviceability /30
11.3
Essentiality /15
15.0
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
5/9
Fair (5–6)
Superstructure
5/9
Fair (5–6)
Substructure
4/9
Poor (1–4)
Inventory Load Rating
19.1 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1920
Last Reconstructed
1991
Material
Steel
Number of Spans
1
Structure Length
10.4 m (34 ft)
Deck Width
5.3 m (17 ft)
Owner
Town/Township Highway Agency
Avg Daily Traffic
40 vehicles/day
Structure Number
000000000018925

Condition Analysis

  • The deck (driving surface) is in fair condition (5/9), with minor deterioration that may require routine maintenance.
  • The superstructure (beams and supports above the deck) is in fair condition (5/9), with minor deterioration that may require routine maintenance.
  • At 4/9, the substructure (piers and abutments) is in poor shape, with advanced wear flagged for priority repair.

How to read this record

T544,SILVR PINE RD is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare T544,SILVR PINE RD against other structures in Huntingdon and across Pennsylvania. Pennsylvania bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for T544,SILVR PINE RD?

T544,SILVR PINE RD in Huntingdon, Pennsylvania has a deck rating of 5/9, superstructure rating of 5/9, and substructure rating of 4/9 on the FHWA's 0–9 scale.

How often is T544,SILVR PINE RD inspected?

T544,SILVR PINE RD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 40 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. T544,SILVR PINE RD is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for T544,SILVR PINE RD?

T544,SILVR PINE RD has an NBI inventory load rating of 19.1 metric tons.

Who is responsible for maintaining T544,SILVR PINE RD?

T544,SILVR PINE RD is owned and maintained by Town/Township Highway Agency.

How old is T544,SILVR PINE RD and does age affect safety?

T544,SILVR PINE RD was built in 1920, making it 106 years old and last reconstructed in 1991.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.