CW POST ROAD-I
Carrying CW POST ROAD-I over DRAINAGE DITCH
1.0 MI S HWY 18 & COMM DR, Craighead, Arkansas
Data updated May 2026
FHWA NBI record, refreshed with each annual release.
Bridge Snapshot: CW POST ROAD-I
The CW POST ROAD-I bridge in Craighead, Arkansas carries CW POST ROAD-I over DRAINAGE DITCH. It was built in 1990, making it 36 years old today. The structure is built primarily of concrete and spans 3 sections, stretching 27.4 meters (90 feet) end to end. Daily traffic averages 3,900 vehicles, placing it in the moderately-trafficked tier of Arkansas bridges. It is owned and maintained by City/Municipal Highway Agency.
The latest FHWA inspection records show a deck rating of 7/9, superstructure at 6/9, substructure at 7/9. The weakest component sits in fair condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 24.5 metric tons.
Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.
How CW POST ROAD-I compares
Live comparison across Arkansas.
Historical Sufficiency Rating
PlainBridge-computedFHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.
Condition Ratings
Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.
Structural Details
- Year Built
- 1990
- Material
- Concrete
- Number of Spans
- 3
- Structure Length
- 27.4 m (90 ft)
- Deck Width
- 8.9 m (29 ft)
- Owner
- City/Municipal Highway Agency
- Avg Daily Traffic
- 3,900 vehicles/day
- Structure Number
- 000000000020893
Location
Data Source
FHWA National Bridge Inventory (NBI).
FHWA NBI Program ↗Condition Analysis
- • The deck (driving surface) rates good at 7/9, with no significant deterioration on file.
- • At 6/9, the superstructure (beams and supports above the deck) shows fair condition, with minor wear flagged for upkeep.
- • At 7/9, the substructure (piers and abutments) is in good shape and shows no significant wear.
How to read this record
This page shows what the last federal inspection recorded, not whether CW POST ROAD-I is safe to cross today. Here is how to use it.
- NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
- Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
- Compare CW POST ROAD-I against other structures in Craighead and across Arkansas. Arkansas bridges
- Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge
Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.
Frequently Asked Questions
What do the condition ratings mean for CW POST ROAD-I?
CW POST ROAD-I in Craighead, Arkansas has a deck rating of 7/9, superstructure rating of 6/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.
How often is CW POST ROAD-I inspected?
CW POST ROAD-I's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 3,900 vehicles per day.
What does “structurally deficient” mean in older bridge reports?
FHWA retired that reported status beginning with the 2018 archive. CW POST ROAD-I is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.
What is the inventory load rating for CW POST ROAD-I?
CW POST ROAD-I has an NBI inventory load rating of 24.5 metric tons.
Who is responsible for maintaining CW POST ROAD-I?
CW POST ROAD-I is owned and maintained by City/Municipal Highway Agency.
How old is CW POST ROAD-I and does age affect safety?
CW POST ROAD-I was built in 1990, making it 36 years old.
Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.
Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.