FHWA NBI 2024 Inspection record Public-domain dataset

SR 168 SBL

Carrying SR 168 SBL over NORTHWEST RIVER

1.30NC-STATE/10.09 TO 165, Chesapeake city, Virginia

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
75 t Inventory load rating

Bridge Snapshot: SR 168 SBL

The SR 168 SBL bridge in Chesapeake city, Virginia carries SR 168 SBL over NORTHWEST RIVER. It was built in 1987, making it 39 years old today. The structure is built primarily of prestressed concrete and spans 13 sections, stretching 185.9 meters (610 feet) end to end. Daily traffic averages 14,164 vehicles, placing it in the heavily-trafficked tier of Virginia bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 5/9, substructure at 6/9. The weakest component sits in fair condition. All reported major components score above the Poor range. Its NBI inventory load rating is 74.6 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How SR 168 SBL compares

▲ 28.6
Load rating vs Virginia average (46.0 t)
Top 11%
Higher load rating than 89% of Virginia bridges
187
Bridges in Chesapeake city · 9 in Poor condition
SR 168 SBL 74.6 t
Virginia average 46.0 t

Live comparison across Virginia.

Historical Sufficiency Rating

PlainBridge-computed
74.0 / 100 - historical 50–79.9 band
Structural adequacy /55
45.0
Serviceability /30
29.0
Essentiality /15
0.0
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
5/9
Fair (5–6)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
74.6 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1987
Material
Prestressed Concrete
Number of Spans
13
Structure Length
185.9 m (610 ft)
Deck Width
14.0 m (46 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
14,164 vehicles/day
Structure Number
000000000021887

Condition Analysis

  • The deck (driving surface) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • The superstructure (beams and supports above the deck) is in fair condition (5/9), with minor deterioration that may require routine maintenance.
  • The substructure (piers and abutments) is in fair condition (6/9), with minor deterioration that may require routine maintenance.

How to read this record

This page shows what the last federal inspection recorded, not whether SR 168 SBL is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare SR 168 SBL against other structures in Chesapeake city and across Virginia. Virginia bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for SR 168 SBL?

SR 168 SBL in Chesapeake city, Virginia has a deck rating of 6/9, superstructure rating of 5/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is SR 168 SBL inspected?

SR 168 SBL's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 14,164 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. SR 168 SBL is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for SR 168 SBL?

SR 168 SBL has an NBI inventory load rating of 74.6 metric tons.

Who is responsible for maintaining SR 168 SBL?

SR 168 SBL is owned and maintained by City/Municipal Highway Agency.

How old is SR 168 SBL and does age affect safety?

SR 168 SBL was built in 1987, making it 39 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.