FHWA NBI 2024 Inspection record Public-domain dataset

NEW CASTLE ST

Carrying NEW CASTLE ST over MCLURES RUN

1420' SOUTH OF SR 0208, Lawrence, Pennsylvania

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
43 t Inventory load rating

Bridge Snapshot: NEW CASTLE ST

The NEW CASTLE ST bridge in Lawrence, Pennsylvania carries NEW CASTLE ST over MCLURES RUN. It was built in 1987, making it 39 years old today. The structure is built primarily of concrete and spans 1 section, stretching 11.0 meters (36 feet) end to end. Daily traffic averages 3,410 vehicles, placing it in the moderately-trafficked tier of Pennsylvania bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show superstructure at 7/9, substructure at 6/9. The weakest component sits in fair condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 42.6 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How NEW CASTLE ST compares

▲ 3.3
Load rating vs Pennsylvania average (39.3 t)
Top 33%
Higher load rating than 67% of Pennsylvania bridges
162
Bridges in Lawrence · 14 in Poor condition
NEW CASTLE ST 42.6 t
Pennsylvania average 39.3 t

Live comparison across Pennsylvania.

Historical Sufficiency Rating

PlainBridge-computed
76.7 / 100 - historical 50–79.9 band
Structural adequacy /55
55.0
Serviceability /30
11.0
Essentiality /15
12.7
Special reductions
−2.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Superstructure
7/9
Good (7–9)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
42.6 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1987
Material
Concrete
Number of Spans
1
Structure Length
11.0 m (36 ft)
Deck Width
14.3 m (47 ft)
Owner
State Highway Agency
Avg Daily Traffic
3,410 vehicles/day
Structure Number
000000000022240

Condition Analysis

  • At 7/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • The substructure (piers and abutments) is in fair condition (6/9), with minor deterioration that may require routine maintenance.

How to read this record

This page shows what the last federal inspection recorded, not whether NEW CASTLE ST is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare NEW CASTLE ST against other structures in Lawrence and across Pennsylvania. Pennsylvania bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for NEW CASTLE ST?

NEW CASTLE ST in Lawrence, Pennsylvania, superstructure rating of 7/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is NEW CASTLE ST inspected?

NEW CASTLE ST's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 3,410 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. NEW CASTLE ST is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for NEW CASTLE ST?

NEW CASTLE ST has an NBI inventory load rating of 42.6 metric tons.

Who is responsible for maintaining NEW CASTLE ST?

NEW CASTLE ST is owned and maintained by State Highway Agency.

How old is NEW CASTLE ST and does age affect safety?

NEW CASTLE ST was built in 1987, making it 39 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.