FHWA NBI 2024 Inspection record Public-domain dataset

T615 CROOKERHOUSE

Carrying T615 CROOKERHOUSE over W BR TUNUNGWANT CREEK

700 FT NW OF T-498, McKean, Pennsylvania

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
42 t Inventory load rating

Bridge Snapshot: T615 CROOKERHOUSE

The T615 CROOKERHOUSE bridge in McKean, Pennsylvania carries T615 CROOKERHOUSE over W BR TUNUNGWANT CREEK. It was built in 1910, making it 116 years old today. It was last reconstructed in 1984, extending its service life. The structure is built primarily of prestressed concrete and spans 1 section, stretching 11.3 meters (37 feet) end to end. Daily traffic averages 150 vehicles, placing it in the lower-traffic tier of Pennsylvania bridges. It is owned and maintained by Town/Township Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 4/9, substructure at 6/9. The weakest component sits in poor condition. A component scored 4 or below, placing this bridge in the federal Poor condition category rather than declaring it unsafe or closed. Its NBI inventory load rating is 41.7 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How T615 CROOKERHOUSE compares

▲ 2.4
Load rating vs Pennsylvania average (39.3 t)
Top 35%
Higher load rating than 65% of Pennsylvania bridges
166
Bridges in McKean · 31 in Poor condition
T615 CROOKERHOUSE 41.7 t
Pennsylvania average 39.3 t

Live comparison across Pennsylvania.

Historical Sufficiency Rating

PlainBridge-computed
58.2 / 100 - historical 50–79.9 band
Structural adequacy /55
30.0
Serviceability /30
13.3
Essentiality /15
14.9
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
4/9
Poor (1–4)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
41.7 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1910
Last Reconstructed
1984
Material
Prestressed Concrete
Number of Spans
1
Structure Length
11.3 m (37 ft)
Deck Width
7.5 m (25 ft)
Owner
Town/Township Highway Agency
Avg Daily Traffic
150 vehicles/day
Structure Number
000000000025542

Condition Analysis

  • At 6/9, the deck (driving surface) shows fair condition, with minor wear flagged for upkeep.
  • At 4/9, the superstructure (beams and supports above the deck) is in poor shape, with advanced wear flagged for priority repair.
  • The substructure (piers and abutments) is in fair condition (6/9), with minor deterioration that may require routine maintenance.

How to read this record

T615 CROOKERHOUSE is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare T615 CROOKERHOUSE against other structures in McKean and across Pennsylvania. Pennsylvania bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for T615 CROOKERHOUSE?

T615 CROOKERHOUSE in McKean, Pennsylvania has a deck rating of 6/9, superstructure rating of 4/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is T615 CROOKERHOUSE inspected?

T615 CROOKERHOUSE's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 150 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. T615 CROOKERHOUSE is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for T615 CROOKERHOUSE?

T615 CROOKERHOUSE has an NBI inventory load rating of 41.7 metric tons.

Who is responsible for maintaining T615 CROOKERHOUSE?

T615 CROOKERHOUSE is owned and maintained by Town/Township Highway Agency.

How old is T615 CROOKERHOUSE and does age affect safety?

T615 CROOKERHOUSE was built in 1910, making it 116 years old and last reconstructed in 1984.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.