FHWA NBI 2024 Inspection record Public-domain dataset

T850 SHAFFER RUN R

Carrying T850 SHAFFER RUN R over SHAFFERS RUN

1.9 MILE N OF FAIRHOPE, Somerset, Pennsylvania

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
21 t Inventory load rating

Bridge Snapshot: T850 SHAFFER RUN R

The T850 SHAFFER RUN R bridge in Somerset, Pennsylvania carries T850 SHAFFER RUN R over SHAFFERS RUN. It was built in 1937, making it 89 years old today. It was last reconstructed in 1949, extending its service life. The structure is built primarily of steel and spans 1 section, stretching 13.1 meters (43 feet) end to end. Daily traffic averages 11 vehicles, placing it in the lower-traffic tier of Pennsylvania bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 5/9, superstructure at 4/9, substructure at 5/9. The weakest component sits in poor condition. Because at least one major component scores 4 or lower, this bridge falls in FHWA's Poor condition category. That category is not a closure order. Its NBI inventory load rating is 20.9 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How T850 SHAFFER RUN R compares

▼ 18.4
Load rating vs Pennsylvania average (39.3 t)
Bottom 7%
Lower load rating than 93% of Pennsylvania bridges
400
Bridges in Somerset · 58 in Poor condition
T850 SHAFFER RUN R 20.9 t
Pennsylvania average 39.3 t

Live comparison across Pennsylvania.

Historical Sufficiency Rating

PlainBridge-computed
55.3 / 100 - historical 50–79.9 band
Structural adequacy /55
17.3
Serviceability /30
26.0
Essentiality /15
15.0
Special reductions
−3.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
5/9
Fair (5–6)
Superstructure
4/9
Poor (1–4)
Substructure
5/9
Fair (5–6)
Inventory Load Rating
20.9 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1937
Last Reconstructed
1949
Material
Steel
Number of Spans
1
Structure Length
13.1 m (43 ft)
Deck Width
7.3 m (24 ft)
Owner
State Highway Agency
Avg Daily Traffic
11 vehicles/day
Structure Number
000000000031637

Condition Analysis

  • The deck (driving surface) is in fair condition (5/9), with minor deterioration that may require routine maintenance.
  • The superstructure (beams and supports above the deck) rates poor at 4/9, advanced deterioration that should be prioritized for repair.
  • The substructure (piers and abutments) is in fair condition (5/9), with minor deterioration that may require routine maintenance.

How to read this record

T850 SHAFFER RUN R is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare T850 SHAFFER RUN R against other structures in Somerset and across Pennsylvania. Pennsylvania bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for T850 SHAFFER RUN R?

T850 SHAFFER RUN R in Somerset, Pennsylvania has a deck rating of 5/9, superstructure rating of 4/9, and substructure rating of 5/9 on the FHWA's 0–9 scale.

How often is T850 SHAFFER RUN R inspected?

T850 SHAFFER RUN R's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 11 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. T850 SHAFFER RUN R is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for T850 SHAFFER RUN R?

T850 SHAFFER RUN R has an NBI inventory load rating of 20.9 metric tons.

Who is responsible for maintaining T850 SHAFFER RUN R?

T850 SHAFFER RUN R is owned and maintained by State Highway Agency.

How old is T850 SHAFFER RUN R and does age affect safety?

T850 SHAFFER RUN R was built in 1937, making it 89 years old and last reconstructed in 1949.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.