FHWA NBI 2024 Inspection record Public-domain dataset

SR 0167 TR 167

Carrying SR 0167 TR 167 over SILVER LAKE CREEK

SILVER LAKE TP JCT SR4008, Susquehanna, Pennsylvania

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
43 t Inventory load rating

Bridge Snapshot: SR 0167 TR 167

The SR 0167 TR 167 bridge in Susquehanna, Pennsylvania carries SR 0167 TR 167 over SILVER LAKE CREEK. It was built in 1990, making it 36 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 12.8 meters (42 feet) end to end. Daily traffic averages 565 vehicles, placing it in the lower-traffic tier of Pennsylvania bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 8/9, substructure at 7/9. The weakest component sits in good condition. All reported major components score above the Poor range. Its NBI inventory load rating is 42.6 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How SR 0167 TR 167 compares

▲ 3.3
Load rating vs Pennsylvania average (39.3 t)
Top 33%
Higher load rating than 67% of Pennsylvania bridges
284
Bridges in Susquehanna · 51 in Poor condition
SR 0167 TR 167 42.6 t
Pennsylvania average 39.3 t

Live comparison across Pennsylvania.

Historical Sufficiency Rating

PlainBridge-computed
96.4 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
28.2
Essentiality /15
14.3
Special reductions
−1.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
8/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
42.6 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1990
Material
Prestressed Concrete
Number of Spans
1
Structure Length
12.8 m (42 ft)
Deck Width
9.6 m (31 ft)
Owner
State Highway Agency
Avg Daily Traffic
565 vehicles/day
Structure Number
000000000032262

Condition Analysis

  • At 7/9, the deck (driving surface) is in good shape and shows no significant wear.
  • At 8/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • The substructure (piers and abutments) rates good at 7/9, with no significant deterioration on file.

How to read this record

This page shows what the last federal inspection recorded, not whether SR 0167 TR 167 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare SR 0167 TR 167 against other structures in Susquehanna and across Pennsylvania. Pennsylvania bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for SR 0167 TR 167?

SR 0167 TR 167 in Susquehanna, Pennsylvania has a deck rating of 7/9, superstructure rating of 8/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is SR 0167 TR 167 inspected?

SR 0167 TR 167's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 565 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. SR 0167 TR 167 is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for SR 0167 TR 167?

SR 0167 TR 167 has an NBI inventory load rating of 42.6 metric tons.

Who is responsible for maintaining SR 0167 TR 167?

SR 0167 TR 167 is owned and maintained by State Highway Agency.

How old is SR 0167 TR 167 and does age affect safety?

SR 0167 TR 167 was built in 1990, making it 36 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.