FHWA NBI 2024 Inspection record Public-domain dataset

PLAN COURT

Carrying PLAN COURT over PUCKETA CREEK

WEST OF SR 380/366 INTER, Westmoreland, Pennsylvania

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
34 t Inventory load rating

Bridge Snapshot: PLAN COURT

The PLAN COURT bridge in Westmoreland, Pennsylvania carries PLAN COURT over PUCKETA CREEK. It was built in 1940, making it 86 years old today. It was last reconstructed in 1984, extending its service life. The structure is built primarily of concrete and spans 1 section, stretching 13.4 meters (44 feet) end to end. Daily traffic averages 100 vehicles, placing it in the lower-traffic tier of Pennsylvania bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 5/9, superstructure at 4/9, substructure at 4/9. The weakest component sits in poor condition. A component scored 4 or below, placing this bridge in the federal Poor condition category rather than declaring it unsafe or closed. Its NBI inventory load rating is 33.6 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How PLAN COURT compares

▼ 5.7
Load rating vs Pennsylvania average (39.3 t)
Bottom 31%
Lower load rating than 69% of Pennsylvania bridges
619
Bridges in Westmoreland · 92 in Poor condition
PLAN COURT 33.6 t
Pennsylvania average 39.3 t

Live comparison across Pennsylvania.

Historical Sufficiency Rating

PlainBridge-computed
47.5 / 100 - historical 20–49.9 band
Structural adequacy /55
30.0
Serviceability /30
11.0
Essentiality /15
13.5
Special reductions
−7.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
5/9
Fair (5–6)
Superstructure
4/9
Poor (1–4)
Substructure
4/9
Poor (1–4)
Inventory Load Rating
33.6 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1940
Last Reconstructed
1984
Material
Concrete
Number of Spans
1
Structure Length
13.4 m (44 ft)
Deck Width
7.9 m (26 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
100 vehicles/day
Structure Number
000000000037018

Condition Analysis

  • The deck (driving surface) rates fair at 5/9, minor deterioration that routine maintenance should address.
  • At 4/9, the superstructure (beams and supports above the deck) is in poor shape, with advanced wear flagged for priority repair.
  • The substructure (piers and abutments) is in poor condition (4/9), showing advanced deterioration that may require priority repair.

How to read this record

PLAN COURT is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare PLAN COURT against other structures in Westmoreland and across Pennsylvania. Pennsylvania bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for PLAN COURT?

PLAN COURT in Westmoreland, Pennsylvania has a deck rating of 5/9, superstructure rating of 4/9, and substructure rating of 4/9 on the FHWA's 0–9 scale.

How often is PLAN COURT inspected?

PLAN COURT's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 100 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. PLAN COURT is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for PLAN COURT?

PLAN COURT has an NBI inventory load rating of 33.6 metric tons.

Who is responsible for maintaining PLAN COURT?

PLAN COURT is owned and maintained by City/Municipal Highway Agency.

How old is PLAN COURT and does age affect safety?

PLAN COURT was built in 1940, making it 86 years old and last reconstructed in 1984.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.