FHWA NBI 2024 Inspection record Public-domain dataset

SR 0954

Carrying SR 0954 over LITTLE MAHONING CREEK

SMICKSBURG No. 1, Indiana, Pennsylvania

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
42 t Inventory load rating

Bridge Snapshot: SR 0954

The SR 0954 bridge in Indiana, Pennsylvania carries SR 0954 over LITTLE MAHONING CREEK. It was built in 2009, making it 17 years old today. The structure is built primarily of prestressed concrete continuous and spans 2 sections, stretching 52.7 meters (173 feet) end to end. Daily traffic averages 1,051 vehicles, placing it in the moderately-trafficked tier of Pennsylvania bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 8/9, substructure at 7/9. The weakest component sits in good condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 41.7 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How SR 0954 compares

▲ 2.4
Load rating vs Pennsylvania average (39.3 t)
Top 35%
Higher load rating than 65% of Pennsylvania bridges
214
Bridges in Indiana · 34 in Poor condition
SR 0954 41.7 t
Pennsylvania average 39.3 t

Live comparison across Pennsylvania.

Historical Sufficiency Rating

PlainBridge-computed
97.3 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
29.0
Essentiality /15
13.3
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
8/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
41.7 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
2009
Material
Prestressed Concrete Continuous
Number of Spans
2
Structure Length
52.7 m (173 ft)
Deck Width
10.8 m (35 ft)
Owner
State Highway Agency
Avg Daily Traffic
1,051 vehicles/day
Structure Number
000000000045666

Condition Analysis

  • The deck (driving surface) rates good at 7/9, with no significant deterioration on file.
  • The superstructure (beams and supports above the deck) is in good condition (8/9), showing no significant deterioration.
  • The substructure (piers and abutments) rates good at 7/9, with no significant deterioration on file.

How to read this record

This page shows what the last federal inspection recorded, not whether SR 0954 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare SR 0954 against other structures in Indiana and across Pennsylvania. Pennsylvania bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for SR 0954?

SR 0954 in Indiana, Pennsylvania has a deck rating of 7/9, superstructure rating of 8/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is SR 0954 inspected?

SR 0954's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 1,051 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. SR 0954 is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for SR 0954?

SR 0954 has an NBI inventory load rating of 41.7 metric tons.

Who is responsible for maintaining SR 0954?

SR 0954 is owned and maintained by State Highway Agency.

How old is SR 0954 and does age affect safety?

SR 0954 was built in 2009, making it 17 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.